RFP 2026-03 Addendum No. 3

Project Information

Bid Title
RFP 2026-03 Addendum No. 3
Issuing Agency
Hinesville city
Location
Georgia
Published Date
Jan 27, 2026
Closing Date
Feb 4, 2026
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description
Bid Title: RFP 2026-03 Addendum No. 3
Category: City of Hinesville Bid Postings
Status: Open
Publication Date/Time:
1/27/2026 5:08 PM
Closing Date/Time:
2/4/2026 2:00 PM
Related Documents:
Attachment Preview
Date:
Project:
Engineer:
Addendum No. Three
January 26, 2026
Hinesville City – Hwy 196 Pump Station Rehab
Simonton Engineering, LLC.
Greensboro & Hinesville, Georgia
The original plans, specifications, and bid documents are amended to include the following:
Technical Specifications
Replace the original Specification Section 16000 Electrical with the enclosed Specification
Section 16000 Electrical.
Paul 1C-2. 6S-i2m6onton
-END-
1050 Parkside Cmns, Suite 101, Greensboro, Georgia
Phone: (706) 454-0870 (912) 977-1502
16000-1
SECTION 16000
ELECTRICAL
PART 1 GENERAL
1.1
DESCRIPTION
A.
1.2
The work covered by this Section of these Specifications includes but is not
necessarily limited to the following items of work:
1. Electrical service, distribution equipment and control equipment for pump station.
2. Coordination with utility for power and metering.
SCOPE OF WORK
A.
1.3
This section of the specifications covers the complete electrical systems as indicated
on the drawings or as specified herein. Provide all materials, labor, equipment, and
supervision to install electrical systems. The work shall consist of, but shall not be
limited to, the installation of the following:
1. Install new service, electrical distribution, and control equipment for a new pump
station.
2. Coordination with utilities for power service indicated.
RELATED WORK SPECIFIED ELSEWHERE
A. Refer to the Civil specifications and Special Conditions for other items of work
necessary to complete the electrical installation.
1.4
CODES AND PERMITS
A. All work shall be done in accordance with the 2023 Edition of the National Electrical
Code with Georgia amendments, applicable local ordinances and regulations of local
utility company. All permits and inspections certificates shall be paid for by the
Contractor.
1.5
DRAWINGS
A. The drawings indicate the general arrangement of equipment. Install electrical work to
suit field conditions.
B. Do not scale drawings. Dimensions required for layout of equipment shall be obtained
from dimensioned plans unless specifically indicated on electrical plans.
1.6
CUTTING, PATCHING, EXCAVATING & BACKFILLING
A. All cutting and patching required to carry out the work shall be provided under other
Specification Sections.
B. All excavation and backfilling required to install conduit shall be provided under this
Section. Backfill shall be compacted as required under other Specification Sections.
City of Hinesville, Georgia
Highway 196 Pump Station Generator
Proj #: 2022-26PRJ
16000-2
1.7
RECORD DRAWINGS
A.
1.8
At the time of final inspection, provide three (3) sets of data on electrical equipment
used in the project. This data shall be in bound form and shall include the following
items:
1. Shop drawings on equipment listed.
2. Data sheets indicating electrical characteristics of all devices.
3. Data sheets on all lighting fixtures indicating voltage, lamp, and ballast used in
each fixture.
4. Test results required by “Electrical Systems Operation Test.”
5. Short circuit/coordination study/arc flash hazard analysis.
ELECTRICAL SYSTEMS OPERATIONAL TEST
A.
1.9
Prior to final inspection, the following systems or equipment shall be tested and
reported as herein specified.
1. Each ground rod installation shall be tested after all connection to ground rods are
made. Ground rod installations shall be tested by “fall of potential” measuring
method using ground resistance test meter and two auxiliary electrodes driven into
the earth, interconnected through the meter with the ground rod installation being
tested. Placement of auxiliary electrodes shall be in accordance with operating
instructions of test meter, but in no case shall auxiliary current electrodes be
placed within seventy feet of the grounding system being tested. Test data shall
indicate placement of auxiliary electrodes with respect to system being tested, data
readings were taken and lowest resistance recorded.
2. Three (3) typewritten copies of the test shall be submitted to the Engineer for
approval.
SITE INVESTIGATION
A. Prior to submitting bids of the project, visit the site of the work to become aware of
existing conditions which may affect the cost of the project. Where work under this
project requires extension, relocation, reconnections, or modifications to existing
equipment or systems, the existing equipment or systems shall be restored to their
original condition, with the exception of the work under this contract, before the
completion of this project.
1.10 MATERIALS
A. Materials specified by manufacturer's name shall be used unless substitution is
allowed by a similar clause.
B. All materials shall be new and in accordance with applicable standards, i.e.,
Underwriters' Laboratories National Electrical Manufacturer Association (N.E.M.A.),
Institute of Electrical and Electronic Engineers (I.E.E.E.), United States of American
Standards Institute (U.S.A.S.I.), U.L. approved equipment shall bear U.L. label.
Similar material shall be the product of one manufacturer.
C. Materials of the same type shall be the product of one manufacturer.
City of Hinesville, Georgia
Highway 196 Pump Station Generator
Proj #: 2022-26PRJ
16000-3
1.11 SHOP DRAWINGS
A. The Contractor shall submit for review by the Engineer a complete schedule and data
of materials and equipment to be incorporated in the work. Submittals shall be
supported by descriptive material, such as catalogs, cuts, diagrams, performance
curves, and charts published by the manufacturer, to show conformance to
specification and drawing requirements; model numbers alone will not be acceptable.
Complete electrical characteristics shall be provided for all equipment.
B. Submittals shall be made for each of the following items:
Automatic Transfer Switch
Enclosed Circuit Breakers
Generator
Wiring Devices
Lighting Fixtures
Surge Protection
Junction Boxes
Control Panel Material List
Variable Frequency Drive
Cable Grips
Short Circuit/Coordination Study/Arc Flash Hazard Analysis
C. Each individual submittal item for materials and equipment shall be marked to show
specification section and paragraph number which pertains to the item.
D. Prior to submitting shop drawings, review the submittal for compliance with the
Contract Documents and place a stamp or other confirmation thereon which states that
the submittal complies with Contract requirements. Submittals without such
verification will be returned disapproved without review.
1.12 SERVICE
A. Electrical service shall be:
1. 480/277V, 3-phase, 4-wire, Wye
B. The electrical service shall be:
1. Aerial, originating in a weatherhead installed adjacent to the termination of a utility
furnished secondary service drop.
C. Complete metering systems shall be provided. Install the system in accordance with
the utility standards. Coordinate meter location with local utility and provide channel
rack for mounting of meter.
1.13 SHORT CIRCUIT/COORDINATION STUDY/ARC FLASH HAZARD ANALYSIS
A. Scope
1. The contractor shall furnish short-circuit and protective device coordination studies
which shall be prepared by the equipment manufacturer.
2. The contractor shall furnish and Arc Flash Hazard Analysis Study per NRPA 70E
Standard for Electrical Safety in the Workplace, reference Article 130.3 and Annex
D.
B. Submittals For Construction
1. The results of the short-circuit, protective device coordination and arc flash hazard
analysis studies shall be summarized in a final report. No more than five (5) bound
copies of the complete final report shall be submitted.
City of Hinesville, Georgia
Highway 196 Pump Station Generator
Proj #: 2022-26PRJ
16000-4
2. The report shall include the following sections:
a. One-line diagram showing protective device ampere ratings and associated
designations, cable size & lengths, transformer kVA & voltage ratings, motor &
generator kVA ratings, and switchgear/switchboard/panelboard designations
b. Descriptions, purpose, basis and scope of the study
c. Tabulations of the worst-case calculated short circuit duties as a percentage of
the applied device rating (automatic transfer switches, circuit breakers, fuses,
etc.); the short circuit duties shall be upward-adjusted for X/R ratios that are
above the device design ratings
d. Protective device time versus current coordination curves with associated one
line diagram identifying the plotted devices, tabulations of ANSI protective relay
functions and adjustable circuit breaker trip unit settings
e. Fault study input data, case descriptions, and current calculations including a
definition of terms and guide for interpretation of the computer printout
f. Incident energy and flash protection boundary calculations
g. Comments and recommendations for system improvements, where needed
h. Executive Summary including source of information and assumptions made
C. Qualifications
1. The short-circuit, protective device coordination and arc flash hazard analysis
studies shall be conducted under the supervision and approval of a Registered
Professional Electrical Engineer skilled in performing and interpreting the power
system studies. The Registered Professional Electrical Engineer shall be a full-time
employee of the electrical power equipment manufacturer (Square D, Eaton or
GE).
D. Studies
1. Contractor to furnish short-circuit and protective device coordination studies as
prepared by equipment manufacturer. The coordination study shall begin with the
utility company's feeder protective device and include all of the electrical protective
devices down to and include the largest feeder circuit breaker and motor starter in
the 480 Volt system. The study shall also include variable frequency drives,
harmonic filters, power factor correction equipment, transformers and protective
devices associated with variable frequency drives, emergency and standby
generators associated paralleling equipment and distribution switchgear.
2. The contractor shall furnish an Arc Flash Hazard Analysis Study per NFPA 70E -
Standard for Electrical Safety in the Workplace, reference Article 130.3 and Annex
D.
E. Data Collection
1. Contractor shall furnish all field data as required by the power system studies. The
Engineer performing the short-circuit, protective device coordination and arc flash
hazard analysis studies shall furnish the Contractor with a listing of required data
immediately after award of the contract.
F. Short-Circuit and Protective Device Evaluation Study
1. Use actual conductor impedances if known. If unknown, use typical conductor
impedances based on IEEE Standards 141, latest edition.
2. Transformer design impedances and standard X/R ratios shall be used when test
values are not available.
3. Provide the following:
City of Hinesville, Georgia
Highway 196 Pump Station Generator
Proj #: 2022-26PRJ
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

RFP #2026-01 Holly Springs Am...

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66523-NONST-2026-000000024

State Government of Georgia

Bid Due: 8/31/2026

Holly Springs Amphitheatre Na...

Bid Number: RFP #2026-01 Bid Title: Holly Springs Amphitheatre Naming Rights Category: Bids

Holly Springs city

Bid Due: 8/31/2026