Iris Court Emergency Culvert Replacement Project
Project Information
- Bid Title
- Iris Court Emergency Culvert Replacement Project
- Issuing Agency
- City of Montrose
- Location
- Colorado
- Published Date
- Dec 8, 2025
- Closing Date
- Dec 22, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 25-009
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 25-009
Bid Title: Iris Court Emergency Culvert Replacement Project
Category: Construction and Design Services Status: Open Description: The City of Montrose is requesting formal bids through the Invitation for Bid process to complete the Iris Court Emergency Culvert Replacement Project. Bids shall be submitted electronically to For security reasons, you must enable JavaScript to view this E-mail address. and will be publicly received on December 8, 2025 2:00 PM. Electronic bids will be opened online via Zoom at https://tinyurl.com/IrisCulvertBidOpen and in person at Montrose City Hall, 400 East Main Street, Montrose, CO 81401. Late bids will not be accepted and it is the responsibility of the bidders to ensure that bids (including signed addenda) arrive by 2:00 PM on the date listed above.
Complete bid packets can be downloaded from the City web page at www.cityofmontrose.org under Department Services, Purchasing, and Open Bids. Addenda will be posted to the website and it is the bidder's responsibility to download, review, sign, and include addenda with their bid.
The City reserves the right to accept or reject any or all bids, to waive irregularities and/or informalities and to disregard all non-conforming, non-responsive, unbalanced or conditional bids. The City of Montrose complies with all Equal Opportunity requirements. All qualified bidders will receive consideration without regard to race, creed, color, national origin, sex, marital status, religion, ancestry, mental or physical handicap or age. The project is also bid according to the City of Montrose local preference policy in effect on the date of the bid opening and detailed in the official Municipal Code of the City of Montrose, Section 1-16-4(B).
Publication Date/Time: 12/8/2025 2:00 PM Closing Date/Time: 12/22/2025 2:00 PM Related Documents: - Attachment Preview
-
UNCCCALL BEFOREYOU DIG811OR1-800-922-1987Utility Notification Center of ColoradoCALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOUDIG, GRADE, OR EXCAVATE FOR THE MARKING OFUNDERGROUND MEMBER UTILITIES.PROJECT LOCATIONSHEET INDEX1COVER AND GENERAL NOTES2PROJECT PLANREFERENCE DRAWINGSCITY OF MONTROSEDEPARTMENT OF PUBLIC WORKS AND ENGINEERINGIRIS COURT EMERGENCY CULVERT REPLACEMENT PROJECTPROJECT NUMBER: 25.27.1BID NUMBER: 25-009GENERAL NOTES AND SPECIFICATIONSDESIGN STANDARDS AND SPECIFICATIONS1. UNLESS NOTED OTHERWISE, THE CITY OF MONTROSE STANDARDS ANDSPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF PUBLIC IMPROVEMENTS(DATED MAY 2012) CONTROL CONSTRUCTION OF THIS PROJECT.2. IN SOME INSTANCES, REFERENCES ARE MADE TO COLORADO DEPARTMENT OFTRANSPORTATION (CDOT) STANDARDS AND MATERIALS BOTH ON THESE PLANS ANDWITHIN THE CITY OF MONTROSE STANDARDS. THIS REFERENCE IS TO THE 2021EDITION OF THE CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGECONSTRUCTION AND 2019 CDOT M&S STANDARD PLANS.3. THE CONTRACTOR SHALL HAVE IN THEIR POSSESSION AT ALL TIMES HARD COPIES OFTHE PROJECT DRAWINGS AND ALL REFERENCE DESIGN STANDARDS ANDSPECIFICATIONS.REQUIRED NOTIFICATIONS AND SUBMITTALS1. THE CONTRACTOR SHALL VERIFY ALL FIELD DIMENSIONS AND ELEVATIONS PRIOR TOCONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IF THERE ARE ANYERRORS OR OMISSIONS IN THE PROJECT PLANS AND/OR CONFLICTS WITH EXISTINGFACILITIES.2. CONTRACTOR SHALL SUBMIT ANY CHANGE OR DEVIATION FROM THE PROJECT PLANSTO THE ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION.3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL IDENTIFY DISPOSAL SITES FORANY MATERIALS LEAVING THE PROJECT AREA. IF MATERIALS ARE BEING TAKEN TOANYWHERE BESIDES A REGISTERED LANDFILL OR GREEN WASTE FACILITY,CONTRACTOR SHALL PROVIDE WRITTEN AGREEMENTS FROM RECEIVING PROPERTYOWNER INDICATING THEIR ACCEPTANCE OF THE MATERIAL AND ANY CONDITIONSFOR USE OF THEIR SITE. FOLLOWING PROJECT COMPLETION, THE CITY OFMONTROSE WILL ALSO REQUIRE WRITTEN VERIFICATION FROM THE PROPERTYOWNER THAT THESE CONDITIONS WERE MET BEFORE RETAINAGE IS RELEASED.4. SHOULD HAZARDOUS MATERIALS BE ENCOUNTERED ON THE SITE CONTRACTORSHALL LEAVE SUCH MATERIALS UNDISTURBED AND SHALL CONTACT THE OWNER FORDIRECTION REGARDING HANDING AND DISPOSAL OF THE MATERIALS.SPECIAL INSPECTIONS AND TESTING1. SPECIAL INSPECTIONS SHALL BE PROVIDED BY THE PROJECT ENGINEER. SPECIALINSPECTIONS ARE REQUIRED FOR THE FOLLOWING WORK.A. BOTTOM OF EXCAVATIONS FOR LINE, GRADE, AND CONDITION PRIOR TOPLACEMENT OF BACKFILLB. UTILITY INSTALLATIONS FOR LINE, GRADE, AND CONDITION PRIOR TOPLACEMENT OF BACKFILLC. PREPARED BASE COURSE AND SUBGRADE FOR LINE, GRADE, AND CONDITIONPRIOR TO PLACEMENT OF PAVEMENT OR CONSTRUCTION OF CURB ANDGUTTER, SIDEWALKS, OR DRIVEWAYSD. ALL CONCRETE WORK, FORM WORK, AND REINFORCING STEELTHESE INSPECTIONS ARE PROVIDED FOR THE CITY'S BENEFIT WITH THE INTENT OFIDENTIFYING ANY PROBLEMS PRIOR TO CONSTRUCTION OF PROJECT COMPONENTS.THE INSPECTIONS DO NOT RELIEVE THE CONTRACTOR OF ANY LIABILITY FOR PROJECTQUALITY OR CONFORMANCE WITH THE PLANS.2. MATERIALS TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE CITY OFMONTROSE STANDARD SPECIFICATIONS BY AN INDEPENDENT, ACCREDITEDCOMPANY HIRED BY THE CONTRACTOR. MATERIALS TESTERS AND LABORATORIESCOLLECTING SAMPLES, ANALYZING MATERIALS, OR PERFORMING TESTS SHALL BECERTIFIED AS REQUIRED BY APPLICABLE AASHTO AND CDOT TEST PROCEDURES FORMATERIALS TESTING. THIS TYPICALLY INCLUDES COMBINATIONS OF ACI, WAQTC,CAPA, AASHTO, ARL, AND/OR LABCAT CERTIFICATIONS DEPENDING ON THE TEST.3. ALL MATERIALS TESTING SHALL BE PAID FOR BY THE CONTRACTOR. ALL QUALITYCONTROL/MATERIALS TESTING SHALL BE INCLUDED WITH THE WORK AND WILL NOTBE PAID FOR SEPARATELY.4. THE CITY SHALL BE NOTIFIED IMMEDIATELY VIA TELEPHONE OR EMAIL OF ANYFAILING TESTS TO INCLUDE, BUT NOT BE LIMITED TO, COMPACTION, CONCRETE AIRCONTENT, CONCRETE SLUMP, ETC.5. THE CONTRACTOR SHALL PROVIDE THE CITY A MINIMUM 24-HOUR ADVANCE NOTICEFOR ALL SPECIAL INSPECTIONS. DELAYS INCURRED BY FAILURE TO PROVIDE THEPROPER ADVANCE NOTICE SHALL BE PAID FOR BY THE CONTRACTOR.GENERAL NOTES1. THE CONTRACTOR SHALL HAVE FULL AND COMPLETE RESPONSIBILITY FOR JOB-SITESAFETY AND SHALL PERFORM ALL WORK IN CONFORMANCE WITH ALL FEDERAL,STATE, AND LOCAL SAFETY REGULATIONS.2. THE CONTRACTOR SHALL PERFORM THE WORK IN CONFORMANCE WITH ALLFEDERAL, STATE, AND LOCAL ORDINANCES, REGULATIONS, AND LAWS.3. LOCATION OF ALL EXISTING UTILITIES (PUBLIC OR PRIVATE) SHALL BE IDENTIFIED ORVERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION OF PROJECTCOMPONENTS. FOR INFORMATION CONTACT: UTILITY NOTIFICATION CENTER OFCOLORADO (UNCC, 811) AND LOCAL UTILITY OWNERS AS NECESSARY. THECONTRACTOR SHALL BEAR THE FULL COST OF REMOVAL, REPLACEMENT, AND DELAYRELATED TO UNVERIFIED EXISTING UTILITIES.4. THE POTENTIAL EXISTS FOR UNKNOWN UTILITIES NOT MARKED ON THE DRAWINGSTO BE PRESENT WITHIN THE PROJECT AREA. THE PROJECT ENGINEER SHOULD BENOTIFIED IF SUCH UTILITIES ARE ENCOUNTERED.5. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES AND CULVERTSTHROUGHOUT CONSTRUCTION. ANY UTILTIES DAMAGED BY THE CONTRACTORSHALL BE RESTORED TO THEIR PRE-PROJECT CONDITION AT THEIR COST.6. DURING THE COURSE OF CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FORLOCATING AND PROTECTING NEWLY INSTALLED UTILITIES FROM DAMAGE WITHINTHE PROJECT AREA. THE RESPONSIBILITY FOR LOCATING UTILITIES WILL BECOMETHAT OF THE CITY OF MONTROSE FOLLOWING FINAL ACCEPTANCE.7. THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH LOCAL CONDITIONS AND THESPECIFICATIONS OF THE GOVERNING ENTITIES AND EXAMINE THE SITE, MAKE TESTS,AND PERFORM EXPLORATIONS DEEMED NECESSARY TO EVALUATE THE SURFACEAND SUBSURFACE PHYSICAL CONDITIONS OF THE SITE IN ORDER TO PERFORM THEWORK UNDER THE CONDITIONS THAT EXIST ON THE SITE, IN ACCORDANCE WITHTHE CONTRACT DOCUMENTS AND FOR THE CONTRACT PRICE.8. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THE WORKSHOWN ON THE PLANS OR DESCRIBED IN THE SPECIFICATIONS IN A MANNERSATISFACTORY TO THE CITY'S DESIGNATED REPRESENTATIVE. UNLESS STATEDOTHERWISE, THE CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, TOOLS,LABOR, AND INCIDENTALS NECESSARY TO COMPLETE THE WORK.9. IN CASE OF CONFLICT BETWEEN THE DRAWINGS, NOTES, AND SPECIFICATIONS, THEORDER OF AUTHORITY SHALL BE: FIRST, THE DRAWINGS; SECOND, THE NOTES;THIRD, THE STANDARD SPECIFICATIONS.10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCEPTANCE AND CONTROL OFALL SURFACE AND SUBSURFACE DRAINAGE AND GROUNDWATER ENTERING THEPROJECT AREA. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DEWATERING IFNEEDED AT NO ADDITIONAL COST TO THE PROJECT. DEWATERING METHODS SHALLBE APPROVED BY THE ENGINEER. THE CONTRACTOR SHALL OBTAIN A CONSTRUCTIONDEWATERING PERMIT FROM CDPHE FOR ALL CONSTRUCTION ACTIVITIES WHENNECESSARY.11. EQUIPMENT STORAGE AND LAYDOWN AREAS USED BY THE CONTRACTOR SHALL NOTINTERFERE WITH EXISTING BUSINESS PARKING, ACCESS, OPERATIONS OR EXISTINGSURFACE DRAINAGE.12. CONSTRUCTION WATER IS AVAILABLE FROM SMALL BASE FLOWS IN THE H DRAIN ORLOUTSENHIZER CANAL.REMOVALS AND CLEARING1. WHERE EXISTING ASPHALT PAVEMENT, CONCRETE PAVEMENT, OR CONCRETESIDEWALK IS TO BE REMOVED ADJACENT TO STRUCTURES, CONCRETE, OR ASPHALTTO REMAIN, IT SHALL BE CUT FULL DEPTH TO A NEAT LINE. CONCRETE REMOVALSSHALL BE TO THE NEAREST TOOL JOINT UNLESS NOTED OTHERWISE. USE OF AWHEEL CUTTER, SAW, OR MILL CUT PARALLEL TO THE DIRECTION OF MILLING AREGENERALLY ACCEPTABLE METHODS FOR ACHIEVING THIS NEAT LINE.2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSING OF ALL MATERIALSREMOVED FROM THE SITE IN ACCORDANCE WITH APPLICABLE WASTE HANDLINGAND DISPOSAL LAWS. THE COST FOR HAULING AND DISPOSAL OF REMOVEDMATERIAL SHALL BE INCLUDED IN THE UNIT PRICE FOR THE ASSOCIATED BID ITEMUNLESS SPECIFICALLY NOTED OTHERWISE.EXCAVATION, BACKFILL, AND SPOILS1. TYPE OF COMPACTION FOR THIS PROJECT SHALL BE AS FOLLOWS:A. EXISTING SUBGRADE (GRANULAR)PROCTOR) AT ±2% OMCB. EXISTING SUBGRADE (FINE-GRAINED)C. RE-USED NATIVE MATERIALD. AGGREGATE BASE COURSE (CLASS 2)PROCTOR) AT ±2% OMCE. AGGREGATE BASE COURSE (CLASS 6)PROCTOR) AT ±2% OMC90% MIN OF AASHTO T-180 (MODIFIEDSEE NOTE 2SEE NOTE 395% MIN OF AASHTO T-180 (MODIFIED95% MIN OF AASHTO T-180 (MODIFIED2. EXCAVATIONS INTO NATIVE EXISTING FINE-GRAINED SOILS (THOSE COMPRISEDPRIMARILY OF PLASTIC CLAYS AND SILTS) SHALL BE PERFORMED USING ANEXCAVATOR BUCKET WITH A FLAT PLATE WELDED OVER THE CUTTING EDGE OF THEBUCKET AS TO MINIMIZE SUBGRADE DISTURBANCE. SOILS SHALL NOT BECOMPACTED IN ANY MANNER THAT CAUSES DISTURBANCE OR PUMPING OFSUBGRADE SOILS. ALL DISTURBED SUBGRADE SOILS (FROM EQUIPMENT TRACKINGOR OTHERWISE) AS DETERMINED BY THE ENGINEER SHALL BE REMOVED ANDREPLACED WITH CDOT CLASS 2 AGGREGATE BASE COURSE AT NO COST TO THE CITY.3. RE-USED NATIVE MATERIAL SHALL BE MOISTURE CONDITIONED AS NECESSARY,PLACED IN LIFTS, AND COMPACTED USING A SHEEPSFOOT TRENCH ROLLER. NOTESTING SHALL BE REQUIRED.4. MAXIMUM PRE-COMPACTION LIFT THICKNESS FOR ALL SOILS SHALL BE 8 INCHESUNLESS APPROVED OTHERWISE.5. CONTRACTOR SHALL THOROUGHLY MOISTURE CONDITION (BY WETTING OR DRYINGAS NEEDED AND MIXING THOROUGHLY) ALL BACKFILL MATERIALS PRIOR TOPLACEMENT. WATERING OF LOOSE BACKFILL AFTER IT HAS BEEN PLACED ISPROHIBITED. MOISTURE CONDITIONING OPERATIONS FOR IMPORTED BACKFILLSHALL TAKE PLACE OUTSIDE OF THE PROPOSED ROADWAY FOOTPRINT UNLESSAPPROVED OTHERWISE.6. THE DECISION TO BRACE OR SHORE ANY PIPE EXCAVATION SHALL BE THERESPONSIBILITY OF THE CONTRACTOR. HOWEVER, IF THE ENGINEER IS OF THEOPINION THAT AT ANY POINT THE TRENCH WALLS ARE NOT PROPERLY SUPPORTED,HE MAY ORDER THE PLACEMENT OF ADDITIONAL SUPPORTS BY, AND AT THEEXPENSE OF, THE CONTRACTOR. COMPLIANCE WITH SUCH ORDER SHALL NOTRELIEVE OR RELEASE THE CONTRACTOR FROM RESPONSIBILITIES FOR THE SAFETY OFTHE WORK.7. ALL EXCAVATION WORK SHALL BE IN ACCORDANCE WITH STATE AND FEDERAL OSHAREGULATIONS.8. CONTRACTOR SHALL UTILIZE SHORING WHERE NECESSARY TO CONTROL THE WIDTHOF TRENCH EXCAVATIONS. PAYMENT WILL NOT BE MADE FOR BACKFILL MORE THAN12 INCHES BEYOND THE TRENCH WIDTHS SPECIFIED ON THE PLANS. ESTABLISHEDUNIT WEIGHTS BASED ON COMPACTION PROCTORS AND OBSERVED EXCESS VOLUMEWILL SERVE AS THE BASIS TO CALCULATE PORTIONS OF BACKFILL INELIGIBLE FORPAYMENT.9. CONTRACTOR SHALL PROTECT EXISTING UTILITIES NEAR EXCAVATIONS DURINGCONSTRUCTION. EXCAVATIONS NEAR EXISTING PIPES AND UTILITIES SHALL BEPERFORMED USING HAND TOOLS IN ORDER TO PREVENT DAMAGE.10. PRECIPITATION RUNOFF AND CONSTRUCTION WATER SHALL BE CONTROLLED SUCHTHAT WATER IS NOT ALLOWED TO ACCUMULATE IN THE EXCAVATIONS, INPAVEMENT AREAS, OR BASE COURSE LAYERS. PONDED WATER SHOULD BEREMOVED AND ANY BEARING SOILS THAT BECOME SATURATED OR SOFTENEDREMOVED AND REPLACED PRIOR TO PLACEMENT OF OVERLYING FILL, CONCRETE, ORPAVEMENTS.11. ALL EXCAVATED MATERIALS NOT APPROVED FOR RE-USE, LOOSE SOILS, SOFT SOILS,ORGANIC MATERIALS, DEBRIS, FROZEN SOIL, ICE, AND OTHER DELETERIOUSMATERIALS SHOULD BE REMOVED FROM EXCAVATIONS PRIOR TO PLACEMENT OFOVERLYING FILL, CONCRETE, OR PAVEMENTS.12. IF UNSTABLE GROUND IS ENCOUNTERED IN TRENCHES, 1-1/2" TRENCHSTABILIZATION ROCK MAY BE USED TO STABILIZE THE BOTTOM OF THE TRENCHPRIOR TO INSTALLATION OF PIPELINES WHERE APPROVED BY THE PROJECTENGINEER. PAYMENT WILL BE MADE BY THE TON OF ROCK ACCORDING TO THE BIDFORM AND SHALL INCLUDE THE OVEREXCAVATION AND REMOVAL OF UNSUITABLEMATERIAL.CONCRETE AND REINFORCEMENT1. ALL CONCRETE SIDEWALK RESTORATION TO BE PERFORMED BY CITY OF MONTROSE.EROSION CONTROL1. CONTRACROR SHALL MAINTAIN A CLEAN WORKSITE AT ALL TIMES AND CLEANUPANY MUD OR TRACKOUT IMMEDIATELY. A CONSTRUCTION STORMWATER PERMITWITH THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT IS NOTREQUIRED FOR THIS PROJECT.SURVEYING AND PROJECT LAYOUT1. PIPE END LOCATION AND ELEVATION STAKEOUT WILL BE PROVIDED BY CITY OFMONTROSE. CONTRACTOR IS RESPONSIBLE FOR ALL OTHER PROJECT SURVEYINGREQUIRED TO CONSTRUCT PROJECT COMPONENTS.STREETS1. ALL STREET RESTORATION TO BE PERFORMED BY CITY OF MONTROSE.STORM SEWER1. CONTRACTOR SHALL VERIFY ALL INVERT ELEVATIONS, UTILITY CROSSING ELEVATIONS,AND DESIGN SLOPES PRIOR TO LAYING OF PIPE. ANY DISCREPANCIES OR CONFLICTSSHALL BE REPORTED TO THE ENGINEER FOR CORRECTION. THE CITY SHALL NOT BERESPONSIBLE FOR ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THECONTRACTOR'S FAILURE TO VERIFY THE INVERT ELEVATIONS AND DESIGN SLOPESPRIOR TO CONSTRUCTION OF THE STORM LINE.2. FINAL TIE IN OF THE STORM LINE WILL REQUIRE BYPASS PUMPING OF EXISTINGFLOWS WIHTIN THE PIPE (< 200 GPM).3. ALL STORM SEWER LINES SHALL BE LAID TO LINE AND GRADE UTILIZING ACALIBRATED PIPE LASER WITH AN EXTERNAL COOLING FAN.4. THE STORM LINE WILL BE INSPECTED BY THE CITY USING A TV CAMERA FOLLOWINGCOMPLETION AND PRIOR TO PAVING OF THE ROADWAY. ANY DEFICIENCIESIDENTIFIED DURING THIS INSPECTION SHALL BE REPAIRED BY THE CONTRACTOR ATNO COST TO THE CITY. CONTRACTOR SHALL PROVIDE A FLUSH OF WATER IN THELINE PRIOR TO THIS INSPECTION AS TO ALLOW FOR EASY IDENTIFICATION OF ANYBELLYS IN THE ALIGNMENT.5. TIE-IN TO EXISTING MANHOLES SHALL BE PERFORMED BY EXPANDING THE MANHOLEOPENING AS NECESSARY AND GROUTING THE ANNULUS USING DAYTON RECRETE 10MINUTE OR APPROVED EQUAL NON-SHRINK GROUT.6. ADS PIPE AND FLARED END SECTION TO BE PROVIDED BY CITY OF MONTROSE.CONTRACTOR SHALL BE RESPONSIBLE FOR SHUTTLING PIPE AND FES FROM THEPUBLIC WORKS SHOP AT 1221 6450 ROAD TO THE PROJECT SITE.TRAFFIC CONTROL1. THE CONTRACTOR SHALL PREPARE A TRAFFIC CONTROL PLAN FOR APPROVAL BY THECITY PRIOR TO MOBILIZATION.2. ALL TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE MOST RECENT VERSIONOF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)3. CONTRACTOR SHALL PERFORM ROUTINE INSPECTIONS OF TRAFFIC CONTROL ASNECESSARY TO MAINTAIN SAFE AND EFFECTIVE TRAFFIC CONTROL IN COMPLIANCEWITH MUTCD STANDARDS AND THE APPROVED TRAFFIC CONTROL PLAN.4. IRIS COURT IS A DEAD-END CUL-DE-SAC AND THE PRIMARY ENTRANCE TO COLORADOWEST CHRISTIAN SCHOOL (CWCS) IS SITUATED IMMEDIATELY ALONGSIDE THEPROJECT AREA. AS A RESULT, IT WILL BE NECESSARY TO MAINTAIN ACCESS TO BOTHIRIS COURT AND THE CWCS THROUGHOUT CONSTRUCTION. IT IS EXPECTED THISWOULD BE ACCOMPLISHED BY CONSTRUCTING THE NEW PIPE HALF AT A TIME TOALLOW TRAFFIC TO PASS ON THE INACTIVE SIDE OF THE PROJECT. CWCS DROPOFF ISAROUND 8 AM AND PICKUP AROUND 3 PM.SITE RESTORATIONCONTRACTOR IS RESPONSIBLE FOR GRADING ALL DISTURBED AREAS SMOOTH, RESTORINGANY DISTURBED FENCING, RESTORATION OF LANDSCAPING COBBLE WITHIN THE PROJECTAREA, AND FINAL PROJECT CLEANUP. THE CITY OF MONTROSE WILL PERFORM ALLREQUIRED SIDEWALK REPLACEMENTS AND ASPHALT PATCHING FOR THE PROJECTFOLLOWING BACKFILL TO MATCH ADJACENT GRADE BY THE CONTRACTOR.A ISSUED FOR BIDSAM12/8/2025REVISIONSCITY OF MONTROSEENGINEERING DEPARTMENT1221 64.50 RD.MONTROSE, CO 81401PH: 240-1480 FAX: 252-4780WWW.CITYOFMONTROSE.ORGDATE:JOB NO:DRAWN:DESIGN:CHECKED:SCALE:12/8/202525.27.1SAMSAMRDCAS SHOWNIRIS COURTEMERGENCY CULVERT REPLACEMENTMONTROSE, COLORADOCOVER SHEET AND NOTESSheet:1Of:2RESTORE FENCEUPON COMPLETIONDAYLIGHT TO CANAL WITH ADS FLARED ENDSECTION, SHAPE CANAL AROUND FES, ANDARMOR APPROX 8'x10' APRON WITH 8"MINUS ANGULAR RIP RAP, 12" THICK.INVERT ELEV: 5896.79'FES PROVIDED BY CITY.REMOVE SIDEWALK AND DAYLIGHTPOWER AND COMM LINES APPROX. 20'EACH WAY AS NECESSARY TO CREATEENOUGH SLACK TO OBTAIN APPROX. 3"CLR OVER TOP OF NEW ADS PIPE.BACKFILL AND COMPACT RE-USINGNATIVE SOILS. CITY TO RESTORESIDEWALK.INSTALL NEW ADS PIPE ALONGALIGNMENT SHOWN. MAINTAINACCESS TO IRIS COURT AND COLORADOWEST CHRISTIAN SCHOOLTHROUGHOUT CONSTRUCTION. PIPEAND FLARED END SECTION TO BEPROVIDED BY CITY AND AVAILABLE ATCITY SHOP.90 LF 30@" A2D.1S5N%-12 WTDETERAIOBRAANTDEODN3E0D" BCYMCPITTYO BERESTORE COBBLELANDSCAPINGUPON COMPLETIONSTUDENT PICKUP/DROPOFFEXITEXISTING 24" ADS TO REMAINPENETRATE EXISTING INLET BOXAND GROUT ANNULUS. REFORMAS NEEDED. INVERT ELEV. 5898.70'BYPASS EXISTING CULVERT FLOWS(<200 GPM) AS NEEDED FOR TIE-INSTUDENT PICKUP/DROPOFFENTRANCECOLORADO WESTCHRISTIAN SCHOOLEXISTING STORM DRAINABANDONMENT ANDHEADWALLRECONFIGURATION BYCITY OF MONTROSESUNNYSIDE RDPLANWEST5910'5905'5900'OHWMELEV: 5900.2'5895'RESTORE FENCEUPON COMPLETIONDAYLIGHT TO CANAL WITH ADS FLARED ENDSECTION, SHAPE CANAL AROUND FES, ANDARMOR APPROX 10'x10' APRON WITH 8"MINUS ANGULAR RIP RAP, 12" THICK.INVERT ELEV: 5896.79'FES PROVIDED BY CITY.REMOVE SIDEWALK AND DAYLIGHTPOWER AND COMM LINES APPROX. 20'EACH WAY AS NECESSARY TO CREATEENOUGH SLACK TO OBTAIN APPROX. 3"CLR OVER TOP OF NEW ADS PIPE.BACKFILL AND COMPACT RE-USINGNATIVE SOILS. CITY TO RESTORESIDEWALK.3" ELEC2" COMM3" OR 4" COMM5890'0+000+100+200+300+400+500+60NOTE:ALL UTILITY LOCATIONS SHOWN ON PROFILE DRAWING AREBASED ON POTHOLING AND SURVEY PERFORMED IN NOVEMBER2025.PROFILE90 LF 30" ADS N-12 WT@ 2.15%(PIPE SUPPLIED BY CITY)8" WATER12"± CLR0+700+802022 AERIALREFERENCE DRAWINGSA ISSUED FOR BIDSAM12/8/2025EXISTINGGROUND8" SEWER5'± CLR0+901+00REVISIONSEAST5910'RESTORE COBBLELANDSCAPINGUPON COMPLETION5905'5900'3" GAS14"± CLRPENETRATE EXISTINGINLET BOX AND GROUTANNULUS. REFORM ASNEEDED. INVERT ELEV.5898.70'1+105895'5890'1+20EXISTING PAVEMENT.APPROX. 3" THICK.SAW CUT TO NEAT LINEFULL DEPTHVARIES 18"TO 36"30" ADS N-12 WTPIPE(SUPPLIED BY CITY)6" (TYP.)48"TYPICAL TRENCHCDOT CLASS 6 ABC COMPACTED PERGENERAL NOTE SHEET. FILL FLUSH WITHADJACENT PAVEMENT. CITY TOPERFORM ASPHALT PATCHING ANDSIDEWALK RESTORATION FOLLOWINGCOMPLETION OF PIPE PROJECT.WARNING TAPECDOT FLOWABLE FILLPLACE IN TWO LIFTS ANDSUPPORT AS NEEDED TO AVOIDFLOTATION/SUPPORT BOTTOMOF PIPE. ENSURE FULL CUTOFFAT EACH END TO LIMIT WATERFLOW ALONG OUTSIDE OF PIPE.1 12" MINUS BALLAST ROCK WHEREREQUIRED IN UNSTABLE TRENCHBOTTOM. THICKNESS AS REQUIRED FORSTABLE BOTTOM AS DIRECTED BYENGINEER.CITY OF MONTROSEENGINEERING DEPARTMENT1221 64.50 RD.MONTROSE, CO 81401PH: 240-1480 FAX: 252-4780WWW.CITYOFMONTROSE.ORGDATE:JOB NO:DRAWN:DESIGN:CHECKED:SCALE:12/8/202525.27.1SAMSAMRDCAS SHOWNIRIS COURTEMERGENCY CULVERT REPLACEMENTMONTROSE, COLORADOPROJECT PLANSheet:2Of:2
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
NIST Boulder Building 2 1330 ...
Follow NIST Boulder Building 2 1330 Fume Hood Replacement Active Contract Opportunity Notice
COMMERCE, DEPARTMENT OF
Bid Due: 7/23/2026
Follow Fence, Remove and Install Active Contract Opportunity Notice ID 1331L526BarbFence Related Notice
Federal Agency
Bid Due: 7/10/2026