Invitation to bid IHDA 4-2026 Johnson
Project Information
- Bid Title
- Invitation to bid IHDA 4-2026 Johnson
- Issuing Agency
- City of Rock Island
- Location
- Illinois
- Published Date
- Apr 13, 2026
- Closing Date
- Apr 27, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- IHDA 4-2026
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: IHDA 4-2026
Bid Title: Invitation to bid IHDA 4-2026 Johnson
Category: Housing Programs Status: Open Description: Invitation to bid IHDA project located at 912 27th Avenue, Rock Island. Project includes soffit, gutters, plumbing and electrical. See full bid package.
Publication Date/Time: 4/13/2026 12:00 am Closing Date/Time: 4/27/2026 2:00 pm Contact Person: Jeff Laxton Related Documents: - Attachment Preview
-
Invitation to Bid-Posted DateSoffit, Gutters, Plumbing, & Electrical912 27th AvenueIDHA 4-2026IntroductionThe City of Rock Island is requesting bids from contractors for a rehabilitation project at a house locatedat 816 21st Street. This City of Rock Island property will be undergoing rehabilitation using IllinoisHousing Development Authority funds to ameliorate deteriorating and deteriorated conditions. All workshall be subject to IDHAand Environmental Protection Agency (EPA) regulations. Contractors who are interested in this projectwill need to schedule a site visit with the Dameian Johnson @ 309-631-0040, prior to submitting thebid. Sealed bids must be received on or before April 27rd at 2p.m. They shall be addressed and marked asfollows.CED DepartmentAttn: Jeff Laxton1528 3rd AvenueRock Island, IL 61201ENCLOSED: 912 27th Avenue BidBids may be mailed or delivered in person. Late bids shall not be opened. All sealed bids shall be openedon 4/27/2026 by 2p.m. at City Hall in the CED Department offices. Contractors who have submitted bidsmay attend but are not required to do so. A bid tabulation shall be posted online afterward. Allquestions shall be directed to the Construction Officer at 309-732-2906.Scope of WorkThe bidder shall submit a project plan using the design standards below that is in compliance with allapplicable IDHA, EPA, and State of Illinois regulations as well as all local building and zoning codes. Theplan must include a clear project timeline and budget with line item costs. The contractor shall act as thegeneral contractor for the project using subcontractors as required. Subcontractors that will be requiredshould be clearly identified in the project plan.Alternative specifications shall be considered only if they are clearly justified, cost effective, and meetall project objectives. The contractor shall have 30 days to complete the work from the date of contractsigning. Change work orders over the course of the project are strongly discouraged.This project will have multiple Trades needed to complete the scope of work. Exterior scope of workis the following. Remove two existing doors (Front & East Side). Both doors will be replaced withmetal pre-hung, double bore, & adjustable thresholds. Both doors shall be keyed alike so one keywill unlock handle and single cylinder deadbolt. Thresholds shall be adjusted to the bottom sweepupon completion of the installation. Jambs shall be packed with fiberglass insulation ornonexpanding foam. Jamb extensions may be required. Trim out using primed wood millwork. Donot use pressed veneered or plastic millwork. Install new white aluminum screen doors with self-storing screens and glass. Must have two closures per unit or one closure and chain. Remove 5existing basement windows. Install new double pane slider windows with screens in the openings.Use mortar to seal the window frame to the masonry block. Make sure to slope a mortar sill awayfrom the window frame. Insulate the frame on the inside of the window. Install a metal weather capfor the furnace flue on the roof. This shall be approved for the heat exhaust and exposed toweather. Use exterior sheet metal screws to secure cap to the flue. The next item for the exterior willbe to encapsulate all the exterior windows with wood frames and trims using white break metal.Using white nails to secure the metal to the trim. There may be some additional furring need to getthe correct thickness past the Siding. There may be some wood that needs to be replaced do to rot.Caulk all the seams of the trim and the trim to the siding J with white Quad. The soffit and fascia willneed to be removed and replaced with new white aluminum. White J or F channel shall be secured tothe wall and two with trim nails per panel securing the soffit to the fascia. Replace the existing fasciawith new break metal on the rakes and overhangs. Install new gutters on the entire roofline usingseamless fabricated white. Install new downs on all the corners with tail pipes 4’ using hingedfittings.The next part of this project will be electrical and plumbing in the basement. In order to gain accessto the plumbing and electrical the existing ceiling panels will need to be removed. Contractor will notbe required to reinstall a ceiling cover. Electrical service will be replaced with a new mast on theexterior pipped to new exterior meter socket with external disconnect. 100amp service with a newpanel wired to code NEC 2020. Leaving a courtesy GFCI receptacle near the panel location. Removeall exposed knob and tube wiring in the basement. Install new keyless lights throughout thebasement wired on a single pull switch at the bottom of the stairs. Install a new washer and dryeroutlet in the laundry area. The dryer will need its own receptacle and needs to be upsized for 220electric, however with the capabilities to drop the voltage down to 110. The Kitchen will need tohave GFCI’s installed. Install Smoker/co2 in the basement near the gas fired appliances and one inthe hallway need the bedrooms. Must have a 10-year lithium battery. Remove all the existingwaterlines inn the basement. Replacing with copper from the meter to all the fixtures in bathroomand kitchen sink. Install a laundry hook for the washer. Install a water line to the toilet in thebasement. Install two antifreeze Silcoks with shut offs near the exterior box sill. Remove the mainstack for the basement bathroom down to the floor. Replace with PVC. Remove and replace thekitchen sink drain from the floor to the sink in PVC. Incorporate a stand pipe to dump the laundrywasher into. Leave existing toilet only hook up a new supply line. In the basement shower do nothook up a new fixture, however leave a hot and cold line near capped. No shut off is needed forthose lines. The dryer vent will need to be ran through the box sill.The final scope is addressing the bathroom. Remove existing tub, toilet, sink, and window. Frame inthe window opening, insulate with R19 kraft insulation. Sheath the exterior furring out match thesurrounding thickness. Install house wrap. Reside with matching siding, blending in the existing withthe new. Laps shall be staggered with full pieces of new siding .Install a new walk in 60” shower.With single lever delta shower fixture. Install ADA stainless steel grab bars. Remove the closed nextto the sink. This should allow room to install a vanity and toilet with the proper clearances. Install afan/light combo vented to the exterior. Install a light over the new vanity and a switch controllingeverything. Install green board and vaper barrier over the framing members. Primer and 2 coats ofpaint over the finished walls. Install new high-rise toilet. Install new vinyl flooring in the bathroomand new baseboard with base shoe. Plumbing, Electrical, & Remodel permits are required beforework beings. If needed Jeff will be willing to meet on site to discuss this scope in details.Bidder Qualifications & Requirements1. Bidders must be currently licensed with the Illinois Secretary of State, bonded, and insured.2. Bidders must have or be able to obtain all applicable licenses and permits in addition to meetingall local, state, and federal requirements to perform requested work.3. Bidders must have and provide proof of General Liability, Vehicle, and Workers CompensationInsurances and name the City of Rock Island as a Certificate Holder.4. Bidders must own or be able to rent sufficient equipment to complete the work.5. Contractor maybe required to supply additional plans or stamped drawings for a plan review. Which maybeneed to obtain a building permit. Which maybe need to obtain a building permit.Preparation of BidEach bid must be submitted on paper and delivered in a sealed envelope. Said envelope shall be clearlylabeled with “ENCLOSED: “912 27th Avenue Bid.” The bid must clearly address all requirements asdescribed above. The cost of the work must be separated into line items with individual costs in additionto providing a total project cost. Labor costs and material costs must be clearly delineated. The companyname, federal tax ID number, Duns number, contact person, email, phone number, and a date withsignature are all required as well.Awarding ContractsThe contract shall be awarded once sealed bids are summited by the deadline and IDHA has approvedthe scope of work with the selected bidder’s proposal. The lowest bid shall not automaticallyguarantee that a contractor will get the work they bid on. Bids shall be reviewed for pricing, experience,previous work history, references, State Licenses, State Registration, insurances, bonds, subcontractors,equipment owned, equipment rented, operator experience, and financial stability. The City at its solediscretion shall decide after a review which contractor, if any, is responsive to the invitation to bid. Allbidding and award procedures undertaken by the City in regard to this project shall be consistent withthe City’s adopted procurement procedures.Submitted bid prices shall remain valid for 60 days after bid opening.Bidder ResponsibilityBidders shall keep the bidding process confidential. Each bidder shall be fully acquainted with conditionsrelating to the site, the scope of work, any current EPA and IDHA regulations pertaining to the work, andrestrictions associated with acceptable execution of requested work. Failure or omission of the bidder toacquaint themselves with site conditions shall in no way relieve them of any obligation with respect totheir bid or subsequent contract.Federal, State, and Local Reporting ComplianceThe contractor shall provide financial and programmatic information as required by the City of RockIsland to comply with all Federal, State, and local law reporting requirements. The contractor shall alsoadhere to all applicable Federal, State and local regulations including but not limited to the following.• Illinois Housing Development Authority (IDHA)• US Environmental Protection Agency (EPA): 40 CFR 745• US Occupational Safety and Health Administration (OSHA): 29 CFR 1926Contact InformationThe primary contact person for this project is the City’s Construction Officer.Jeff LaxtonCED Department1528 3rd AvenueRock Island, IL 61201309-732-2906laxton.jeff@rigov.org
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Assorted Sliced Bread, Rolls,...
BUYER: Sara Rogers (email for Bid Document) EMAIL: sara.rogers@dupagecounty.gov NOTICE TO BIDDERS NOTICE
DuPage County
Bid Due: 7/10/2026
Emergency Notice - Halal Meals
Bid Solicitation # 26-426DOC-CENTO-B-53068 Bid Solicitation # 26-426DOC-CENTO-B-53068 Organization Name DOC - Corrections
State Government of Illinois
Bid Due: 9/20/2026