AEC Campus Arc Flash Study
Project Information
- Bid Title
- AEC Campus Arc Flash Study
- Issuing Agency
- County of Dane
- Location
- Wisconsin
- Published Date
- Aug 5, 2025
- Closing Date
- Sep 9, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 325024
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID: 325024
Title: AEC Campus Arc Flash Study
Addenda: 0
Release Date: 8/5/2025
Due Date: 9/9/2025
OverviewPost InformationPosted At:Tue, Aug 5, 2025 2:00 PMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:NoSummaryDane County Department of Administration- Public Works Engineering Division is inviting proposals for professional consulting services for AEC Campus Wide Arc Flash Study located at Alliant Energy Center, 1919 Alliant Energy Center Way, Madison, WI 53713. Only firms with capabilities, experience & expertise with similar projects should obtain this RFP document & submit Proposals. Proposals are due on or before 2:00 p.m., Tuesday, September 9, 2025.BackgroundThe Alliant Energy Center (AEC) is a County-owned, multi-building event and exhibition complex located at 1919 Alliant Energy Center Way in Madison, Wisconsin. The 164-acre campus features various large-scale facilities including the Veterans Memorial Coliseum, Exhibition Hall, New Holland Pavilions, and multiple administrative and utility support buildings.
Originally constructed in the 1960s, the AEC has grown significantly over time to support a wide range of events. The campus includes a complex and evolving electrical infrastructure that supports both public events and essential life safety systems across several buildings, many of which have been upgraded or reconfigured in recent decades.
The County is undertaking a comprehensive arc flash hazard study of the entire AEC campus in order to assess and address a range of objectives including but not limited to, the following:
-
Improve personnel safety for maintenance and operations staff.
-
Ensure compliance with NFPA 70E and OSHA electrical safety standards.
-
Address outdated or incomplete one-line documentation.
-
Identify areas of non-compliant equipment and opportunities for improved coordination.
-
Prepare for future infrastructure upgrades and emergency response planning.
The size, age, and complexity of the AEC’s electrical system further reinforce the need for comprehensive assessment. This project will ensure the long-term safety, maintainability, and reliability of this campus.
TimelineProject Release Date:August 5, 2025Pre-Proposal Site Tour (Non-Mandatory):August 19, 2025, 10:00amAlliant Energy Center Exhibition Hall- 1919 Alliant Energy Center Way, Madison, WIQuestion Submission Deadline:August 29, 2025, 2:00pmQuestion Response Deadline:September 2, 2025, 4:00pmProposal Submission Deadline:September 9, 2025, 2:00pmInterview, if necessary (estimated):September 24, 2025Notification of Intent to Award (estimated):October 13, 2025Agreement Start Date (estimated):November 3, 2025 -
- Commodity Codes
-
- NAICS 541330Engineering Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Solicitation Reference #: DS271163 Title: Boiler Inspection Services Available Date: 6/18/2026 Due Date:
State Government of Wisconsin
Bid Due: 7/07/2026
M03116P06 - Wastewater Reclam...
Due 7/28/2026 10:00 am US/Central Open M03116P06 - Wastewater Reclamation Facility Recycle Stream
Milwaukee Metropolitan Sewerage District (MMSD)
Bid Due: 7/28/2026