Engineering Design Southport to Harbor Roadway
Project Information
- Bid Title
- Engineering Design Southport to Harbor Roadway
- Issuing Agency
- City of West Sacramento
- Location
- California
- Published Date
- Nov 10, 2025
- Closing Date
- Dec 15, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 25-082-RFP
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID: 25-082-RFP
Title: Engineering Design Southport to Harbor Roadway
Addenda: 1
Release Date: 11/10/2025
Due Date: 12/15/2025
OverviewPost InformationPosted At:Mon, Nov 10, 2025 8:00 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:NoSummarySTATEMENT OF PURPOSE
The City of West Sacramento is soliciting proposals from qualified firms or individuals ("Proposer") to provide Professional Services for Engineering Design for the Southport to Harbor Roadway Project . More details on the City's needs for this work are provided in the Scope of Work .
Each qualified Proposer is to submit a proposal in conformity with the terms of this Request for Proposal ("RFP") by the deadline below ("Proposal"). The Proposer selected by the City pursuant to the terms of this RFP and the City's contracting procedures, if any is selected, is referred to herein as "Contractor."
SYNONYMOUS TERMS
Unless the use indicates otherwise, as used throughout this bid and its attachments, the following terms are synonymous:
a. Firm, Consultant, Supplier, Vendor, Contractor, Successful Bidder, Offeror
b. Purchase Order, Contract, Agreement
c. Services, Work, Scope, and Project
d. Pricing proposal/sheet, Cost proposal/sheet, Rate table/sheet
BackgroundThe Southport to Harbor Roadway Project originated as an effort to address deteriorating pavement conditions along Southport Parkway. The project has since evolved into a Complete Streets initiative designed to rehabilitate pavement and improve multimodal safety through the addition of sidewalk infill, new bike lanes, upgraded utilities, and enhanced pedestrian and transit access. The project corridor includes:
-
Harbor Boulevard – from the US 50 on/off ramps to Industrial Boulevard
-
Industrial Boulevard – from Harbor Boulevard to the Palamidessi Bridge
-
Lake Washington Boulevard – from the Palamidessi Bridge to Southport Parkway
-
Southport Parkway – from Lake Washington Boulevard to Promenade Street
The corridor experiences a high percentage of truck traffic, which has accelerated pavement deterioration. While the City’s recent Neighborhood Pavement Preservation Program provided temporary repairs along Southport Parkway between Lake Washington Boulevard and Ramco Street, a long-term reconstruction solution is now required.
In 2022, the City completed preliminary design (35%) and several technical studies under a prior consultant contract. These documents will be made available in the Attachments section of this RFP:
-
35% Schematic Design
-
35% Construction Estimate
-
Storm Drainage, Sewer, and Water System Evaluation and Analysis
-
Geotechnical Pavement Evaluation
-
Life-Cycle Cost Analysis (LCCA) Memorandum
-
Phase 1 Environmental Site Assessment (ESA)
-
Traffic Analysis Report
-
UPRR Exhibit
The total project construction cost is currently estimated at $37 million and will likely be delivered in multiple construction phases. The project is federally funded with Regional Surface Transportation Program (RSTP) funds and recently received Enhanced Infrastructure Financing District (EIFD) funding from the City to advance design through 100% Plans, Specifications, and Estimate (PS&E).
Additional project information and background materials are available on the City’s website at:
Southport to Harbor Roadway Project | City of West SacramentoTimelineProject Release Date:November 10, 2025Pre-Proposal Meeting (Non-Mandatory):November 19, 2025, 11:00amMicrosoft Teams Need help?
https://teams.microsoft.com/l/meetup-join/19%3ameeting_OTc4MjdlYzEtMzEwNy00OTdhLWFkOTAtNzc4NGJmMTNmZGNl%40thread.v2/0?context=%7b%22Tid%22%3a%22284d74b9-2287-48dd-86fa-55c87b82bc40%22%2c%22Oid%22%3a%22b6374918-6b3a-4d2b-93fb-65151bde0f9c%22%7d
Meeting ID: 277 665 198 775 9
Passcode: Ln77Hs7W
________________________________________
Dial in by phone
+1 619-485-0116,,160614818# United States, All locations
Find a local number
Phone conference ID: 160 614 818#
For organizers: Meeting options | Reset dial-in PIN
________________________________________________________________________________Question Submission Deadline:December 4, 2025, 11:00amQuestion Response Deadline:December 9, 2025, 2:00pmProposal Submission Deadline:December 15, 2025, 2:00pmCity Council Contract Approval :January 21, 2026 -
- Commodity Codes
-
- NAICS 541330Engineering Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Bid Number: PW-2026-0010 Bid Title: ARCHITECTURAL SERVICES RFQ Category: RFP/RFQ's Solicitations Status: Open
City of Coalinga
Bid Due: 7/17/2026
Levee Safety Architect-Engine...
Follow Levee Safety Architect-Engineer (A-E) Services Active Contract Opportunity Notice ID W912PL26S0042 Related
DEPT OF DEFENSE
Bid Due: 7/29/2026