Great River Park Improvement Project
Project Information
- Bid Title
- Great River Park Improvement Project
- Issuing Agency
- Town of East Hartford
- Location
- Connecticut
- Published Date
- Apr 29, 2026
- Closing Date
- May 7, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- Bid No. 26-05
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Great River Park Improvement Project
Bid Number:Bid No. 26-05Start / End Dates & Times:03/19/2026 - 7:00am to 05/07/2026 - 11:00amBid: OpenAddendum(s): - Attachment Preview
-
Town of East HartfordADDENDUM NO. 01Great River Park Improvement ProjectBid No. 26-05Issued April 29, 2026The following summarizes revisions to the Bid Documents included in Addendum No. 01 for theGreat River Park Improvement Project (Bid No. 26-05).The bid opening date is revised to THURSDAY, MAY 7, 2026, still at 11:00 AM at thePurchasing Department. See the revised Invitation to Bid (attached)On Wednesday, April 1, 2026, the pre-bid meeting was held at the Welling Conference Room inTown Hall. The pre-bid sign-in sheet is attached to this addendum.Responses to questions include the following:Question #1: There appear to be trees already removed that are proposed on the plans to beremoved. How should that be addressed?Answer #1: Riverfront Recapture, as part of its daily park operations and maintenanceprogram, removed dead, damaged, and diseased trees within the project area after theconstruction documents were completed. Bidders shall field verify the actual numbers oftrees to be removed based on existing conditions in the field.Question #2: It appears the fishing dock and floating docs will range from -3 to -6’ under water.Has a permit been pulled to allow contractors to install a temporary coffer dam around the workarea? We will need to shore the cast in place dock caps and will require solid ground to installshoring. If we can’t install a coffer dam is the thought that this work will be done off barges?Please advise.Answer #2: A cofferdam was not included in the design and permitting. Piles are to bedriven using a land-based crane with work boats and floats for access. Forms for pile capconcrete are to be temporarily supported by welding or clamping temporary supports tothe steel piles.The Owner Obtained Permits (in Volume 3) are based on technical requirements andconditions that may not appear in the final permit approval document. The followingrestrictions were incorporated into the State and Federal permits as a basis for theapprovals and shall govern other information in the Bid Documents:• Time of Year Restriction: Pile Driving Not Allowed from Dec. 1 thru June 30th.• Crane must be land-based. Barge mounted crane is not allowed.• Pile Driving must be performed using Vibratory Methods only.Page 1 of 3Town of East HartfordADDENDUM NO. 01Great River Park Improvement ProjectBid No. 26-05Issued April 29, 2026• Work Boats (Crew Support Vessels) are permitted but permits limit the number to amaximum of 2 boats.Question #3: Please refer to drawing G-105 for the 8' wide x 550' long walkway on pavement topass through staging area. Under what pay item is this covered? Is this temporary or permanentwork.Answer #3: Drawing G-105 calls for the establishment of a minimum 8-foot-widepedestrian bypass using the existing pavement. There is no separate pay item for thistemporary pathway. Costs associated with this item, as well as other temporary accessand staging items, should be included in Pay Item 015000-1 Mobilization as per thedescription contained in Specification 01 50 00 Temporary Facilities and Controls.Question #4: Please reference pay item 355113-01 Timber Floats 1 LS. Drawing C-007 implies(1) float 25-6 x 8 is to be replaced. Drawing C-004 implies (2) floats are to be replaced.Drawing C-009 shows a 25-6 float and a 30-0 float. Please confirm two new floats are required.Answer #4: Drawing C-004 and Drawing C-007 (Detail A/5) both call for 3 new floatingdock sections. also shows 3 new Timber floats. Drawing C-009 Details, A, B, C includedimensions and details for all 3 floats (25’-6” long; 5’ long; and 30’-0” long). Pay Item355113-01 Timber Floats includes all 3 floating dock sections (Timber Floats) in thisLump Sum Item.Question #5: Please reference Drawing E-1 and Drawing E-2. Is this contractor responsible toinstall conduit between light poles? What size conduit is called for? Buried to what depth? Arewe responsible for furnishing junction box? Under what pay item is work paid under?Answer #5: All electrical work required for a complete lighting installation as shown on theproject drawings shall be included in either Pay Item 260000-1, 260000-2, or 260000-3. Thereare no other pay items for electrical work required to complete the lighting installations shownon the drawings (see possible exception in Response C below regarding New Poles onExisting Foundations).A. Lighting Overview Plan C-100 calls for installation of 11 new light poles on newfoundations north of the Founders Bridge. These 11 new light poles with new foundationsrequire installation of new conduit and cable, all associated hardware, (including junctionboxes), and connections to the power source all in a code compliant manner. See DrawingE1 Work Notes and General Notes for conduit and cable sizes and other details. All suchcosts shall be included in Pay Item 260000-2. Per details on Drawings E3 and E4, burialdepth for conduits shall be 2’-0”.Page 2 of 3Town of East HartfordADDENDUM NO. 01Great River Park Improvement ProjectBid No. 26-05Issued April 29, 2026B. See Drawing E2 for show details for the new Fishing Pier Light and Pole. All such costsrequired to complete this installation shall be included in lump sum Pay Item 260000-1.C. Lighting Overview Plan C-100, calls for 7 Existing Light Poles nearest the Boat Ramp tobe replaced by 7 New Light Poles on the Existing Foundations. Per Drawing E1 Note 1.2under Additional Scope of Work, the existing conduit and cable for these 7 lights shall beassumed (for bidding purposes) to be serviceable and able to energize the new lights withroutine electrical appurtenances, splices, connections, etc. in a code compliant manner.Note 1.2 also requires that the contractor prepare an inspection report noting anydeficiencies that would preclude connection of the existing electrical system to the newlight poles, along with an itemized cost of remediation (corrective work) needed. Thiscorrective work, if found necessary, will be considered an additional expense to becompensated as a negotiated change order.Question #6: Please refer to drawings E-3 and E-4. We have three pay items: 260000-1,260000-2 and 260000-3 please specify what type (size) of foundation is required with each payitem.Answer #6: The Foundation detail shown on Drawing E3 pertain to all new light polefoundations, except the Fishing Pier Light Pole (see Note 9). This cost should be included inlump sum Pay Item 260000-2. The Foundation detail shown on Drawing E4 shall be usedfor the New Fishing Pier Light Pole only (see Note 9) and cost shall be included in lump sumPay Item 260000-1.The following documents & drawings are attached and included in Addendum No. 01:Revised Bid Documents• Volume 1, Page 6 - Invitation to Bid• Pre-Construction Meeting Sign-In SheetEnd of Addendum No. 01Page 3 of 3TOWN OF EAST HARTFORD, CONNECTICUTINVITATION TO BIDBID NO. 26-05GREAT RIVER PARK IMPROVEMENT PROJECTWork under this contract includes waterfront construction consisting of demolition of existingstructures, new fishing pier, support piles, new floating dock sections, electrical lighting, a scenicoverlook, landscaping, and minor concrete repairs in the Town of East Hartford, CT. It also includesother appurtenant work such as maintenance and protection of vehicular traffic and pedestrian accesswithin Great River Park.Proposals may be mailed to the Purchasing Agent, Town of East Hartford, 740 Main Street, EastHartford, Connecticut, 06108 by USPS, FedEx, or UPS, or delivered in person to the Office of thePurchasing Agent, at East Hartford Town Hall, 740 Main Street, East Hartford, Connecticut,06108.Sealed Bids will be received at the office of the Purchasing Department, 740 Main Street, East Hartford,CT 06108 until Thursday, May 7, 2026 at 11:00 AM at which time and place said bids will be openedpublicly and read.The Town will conduct a NON-MANDATORY PRE-BID MEETING on Wednesday, April 1, 2026 at10:00 AM in the Welling Conference Room, 2nd Floor, East Hartford Town Hall, 740 Main Street.IN ORDER TO BE CONSIDERED AN OFFICIAL PLAN HOLDER AND ELIGIBLE BIDDER FOR THEPROJECT, THE PURCHASING AGENT MUST RECEIVE AN EMAIL indicating interest in bidding,company information, and main contact information on, or before, Monday, April 27. All companiesthat send a representative to the non-mandatory pre-bid meeting or register on the Town’s website todownload the documents will also be considered an official plan holder eligible to bid the project.Requests for information (RFIs) will be accepted via email to the Purchasing Agent on or beforeThursday, April 23, 2026.Drawings and Specifications will be available for review at the office of the Purchasing Agent, EastHartford Town Hall, 740 Main Street, East Hartford, CT. (Between the hours of 8:30 am to 4:30 pm,Monday through Friday) and on the Town of East Hartford's Purchasing Website:http://www.easthartfordct.gov/bidsBid security in the form of a 5% bid bond, payable to the Town of East Hartford, is required of allbidders and a 100% Performance Bond will be required of the awarded bidder.This contract is subject to state set-aside and/or contract compliance requirements.The Town reserves the right to reject any or all bids, or any part of all bids, to waive any informality,and reserves all other rights as detailed in the Contract Documents when such action is in the bestinterest of the Town. The Town is an equal opportunity employer. Contractor must comply with allFederal, State and Local requirements under this contract.ADDENDUM No. 1Vol. 1, Page 6 of 160Bid No. 26-05 Great River Park Improvements Project
- Commodity Codes
-
- NAICS 237990Other Heavy and Civil Engineering Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Prequalification: CM185 Main ...
Prequalification: CM185 Main Lobby Entrance Replacement The project scope of work consists of
State Government of Connecticut
Bid Due: 7/14/2026
Miscellaneous Concrete Sidewa...
Miscellaneous Concrete Sidewalk Repairs 2026 In general the work to be performed under
State Government of Connecticut
Bid Due: 7/09/2026