BID No. 08MOT26, Lynwood High School-Imperial Site, Demolition (No DSA), Campus Renovations Addendum 3
Project Information
- Bid Title
- BID No. 08MOT26, Lynwood High School-Imperial Site, Demolition (No DSA), Campus Renovations Addendum 3
- Issuing Agency
- Lynwood Unified School District
- Location
- California
- Published Date
- Feb 19, 2026
- Closing Date
- Mar 3, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
BID No. 08MOT26, Lynwood High School-Imperial Site, Demolition (No DSA), Campus Renovations
BID Document - LHS-Imperial Site, Demolition (No DSA) Cam
Notice Inviting Bids - BID No. 08MOT26, Lynwood High School-Imperial Site, Demolition (No DSA), Campus Renovations
BID Document - LHS-Imperial Site, Demolition (No DSA) Campus Renovations
Addendum 001 - Addendum 001, Issued, February 6, 2026
Addendum 002 -Addendum 002, Issued, February 12, 2026
Addendum 003 -Addendum 003, Issued, February 18, 2026
Links provided:
Hazardous Material Report -Hazmat Report; (Updated Link, Issued on February 17, 2026)
- Attachment Preview
-
BID DOCUMENTBID No. 08MOT26Lynwood High School-Imperial Site, Demolition (No DSA), Campus RenovationsMandatory Pre-Bid Job Walk: February 6, 2026 at 10:00 amLocation: Lynwood High School, 4050 Imperial Hwy, Lynwood, CA 90262Bid Due Date: February 24, 2026Location: Lynwood Unified School District, 11321 Bullis Road, Lynwood, CA 90262Purchasing Department, Office #213SCOPE OF WORK (SOW)1. General Requirements & Compliance● Regulatory Adherence: All work must comply with CCR Title 24 and Title 8 (Cal/OSHA).● Storm Water Pollution Prevention Plan (SWPPP): Implementation of Best Management Practices(BMPs) to prevent runoff into storm drains.● Daily Clean-up: Strict silica dust control and daily debris removal to maintain a safe campusenvironment.2. Site Preparation & Hazardous Materials - Hazardous Material Report● Abatement: Removal and legal disposal of Asbestos-Containing Materials (ACM), Lead-Based Paint(LBP), and PCBs (often found in older caulking and ballasts).● Utility Decommissioning: * Disconnecting and capping of gas, water, and sewer lines (typically 5 feetfrom the property line).○ Safe removal of refrigerants (EPA compliance) and Propylene Glycol from older HVAC systems.● Salvage Operations: Identification and removal of "District Retained" items (e.g., smart boards, specificcasework, or historical artifacts) before mass demolition begins.3. Selective Internal Demolition - Matterport Model Link , Drawing Package● Structural Gutting: Removal of all interior non-load-bearing partitions, ceilings, and floor finishes down tothe concrete slab or wood framing.● MEP Systems: Complete "strip-out" of outdated Mechanical, Electrical, and Plumbing systems,including legacy boilers and ductwork.● Accessibility Prep: Precise concrete saw-cutting for new plumbing trenches and ADA-compliantrestroom reconfigurations.4. Exterior & Site Demolition● Hardscape Removal: Demolition of cracked asphalt community active spaces, concrete walkways, andnon-compliant ADA ramps.● Structure Razing: If replacing 75+ year-old buildings, complete demolition down to the footings isrequired to qualify for OPSC replacement grants.●● Vegetation: Removal of designated trees and shrubs, including stump grinding, while protecting "treesto remain" per the arborist report.5. Earthwork & Finishing● Footing Removal: Total removal of concrete footings and grade beams to a depth of at least 3 feetbelow existing grade.● Backfill & Compaction: Voids left by demolished structures must be backfilled with engineered fill and________________________________________________________________________________________________________BID # 08MOT26, Lynwood High School-Imperial Site, Demolition (No DSA), Campus Renovations1compacted to 90%–95% density, verified by a third-party geotechnical engineer.● Waste Management: California Green Building Standards (CALGreen) require a minimum of 65%diversion of construction and demolition waste from landfills.CategoryModernization Scope ChecklistTypical ActivitySafetyEnvironmentalTemporary 6ft chain-link fencing with privacy screening/dust mesh.Air monitoring for lead/asbestos during "hot" demo phases.UtilitiesSafe-off and "GPR" (Ground Penetrating Radar) utility locating.ConcreteSaw-cutting for new "thickened slab" footings for seismic upgrades.DocumentationSubmission of weight tickets and recycling logs for LEED/CALGreen.1.0General Conditions & Mobilization (Fencing, SWPPP, Signage)LS12.0HazardousMaterial Abatement (Asbestos/Lead/PCBs)LS13.0Soft Demo: Carpeting, ceiling tiles,non-structural partitionsSF—4.0Hard Demo: Concrete slabs, CMU walls, footings, andasphaltCY—5.0Utility Safe-off: Capping of MEP/FP systems at sourceEA—6.0ConcreteSaw-cutting: For new plumbing/electrical trenchesLF—7.0Off-site Disposal & Recycling (65% Min.The Work is subject to the Community Workforce Agreement (“CWA”) between the District and the LosAngeles/Orange Counties Building and Trades Council. Each Bidder must submit the completed andexecuted CWA Letter of Assent concurrently with submitting its Bid Proposal. All Subcontractors mustcomplete and execute the CWA Letter of Assent as a condition to perform any Work. Link provided:Community Work Force AgreementPrequalification RequiredAs a condition of bidding for this Project, and in accordance with California Public ContractCode section 20111.5, prospective Bidders are required to prequalify through Quality Bidders & Register forCUPCCAA projects by clicking on the link Quality Bidders-Contractor Prequalification & CUPCCAARegistration by no later than February 24, 2026 [not less than five days prior to Bid opening date].For questions send email to: Daniela Navarro, Sr. Buyer at dnavarro@mylusd.org and cc:purchasingfinal@mylusd.orgResponses of the District to the notice of any errors or discrepancies herein, or clarificationswill be issued by a written addendum posted on the district website Purchasing pageunder Active Bids & RFPs, Bids & RFPs.It is the responsibility of the Respondents to regularly check the aforementioned web pagefor current written BID modifications through an addenda prior to BID submittal.Important: Firms interested in submitting a response to this BID, are not to contact by anymeans, any Board Member, Administrator, or staff member of the District other than thedesignated Buyer identified above regarding this BID. If this directive is violated, the Districtmay deem the Firm’s “submittal” to be “Non-Responsive”, and no further consideration willbe given.Phone calls for information concerning this BID will not be acceptedDistrict RepresentativeProcurement OfficerContact Name: Daniela Navarro, Sr. BuyerEmail: dnavarro@mylusd.orgContact Name: Ricardo Harris,Director of Purchasing, Contracts & WarehouseEmail: rharris@mylusd.orgPublished: January 30, 2026 & February 6, 2026Norwalk Patriot Newspaper & LUSD Website________________________________________________________________________________________________________BID # 08MOT26, Lynwood High School-Imperial Site, Demolition (No DSA), Campus Renovations2BID No. 08MOT26Lynwood High School-Imperial Site, Demolition (No DSA)Campus RenovationsTABLE OF CONTENTSectionSection 1Section 2Section 3Section 4Section 5Section 6Section 7Section 8DescriptionNotice to ContractorsScope of WorkInstructions for BiddersBid ProposalAttachment A: Subcontractors ListQualifications StatementEnclosures & AttachmentsAttachment A: Subcontractors ListAttachment B: DVBE Participation StatementAttachment C: Non-Collusion AffidavitAttachment D: Certificate of Worker’s CompensationAttachment E: Drug Free Workplace CertificationAttachment F1 & F2: Fingerprint Certificate and Fingerprint CertificateAttachment G: Bid BondAttachment H: Performance BondAttachment I: Labor & Materials Payment BondAttachment J: Verification of Certified Payroll Records Submittal to Labor CommissionerAttachment K: Guarantee FormAttachment L: Certificate of Insurance, Endorsed to Lynwood USDExhibitsExhibit 1: Letter of Assent “A”Sample Contract & General Conditions____________________________________________________________________________________________________BID # 08MOT26, Lynwood High School-Imperial Site, Demolition (No DSA), Campus Renovations3SECTION 1NOTICETOCONTRACTORS____________________________________________________________________________________________________BID # 08MOT26, Lynwood High School-Imperial Site, Demolition (No DSA), Campus Renovations4NOTICE TO CONTRACTORS; CALL FOR BIDSThe District reserves the right to change and/or modify the scheduled timeline.Scheduled TimelineDatesTimeBID Published– 1st WeekJanuary 30, 2026BID Published – 2nd WeekFebruary 6, 2026Mandatory Pre-Bid Job Walk -Lynwood High School February 6, 2026 10:00 amMandatory Pre-Bid Job Walk -Lynwood High School February 12, 2026 10:00 amRFI DUEFebruary 18, 2026 12:00 pmResponses to RFI DUEFebruary 20, 2026BIDs DueNotice of Intent to AwardBoard of Education Meeting for AwardNotice of AwardNotice to ProceedFebruary 24, 2026February 25, 2026March 12, 2026March 13, 2026March 23, 202610:00 am5:00 pmNOTICE IS HEREBY GIVEN that Lynwood Unified School District, acting by and through its Board of Education,will receive up to, but not later than the above-stated date and time, Bid Proposals for the Work of the Projectdescribed above.1. Bid Proposal. All information or responses of a Bidder in its Bid Proposal and other documentsaccompanying the Bid Proposal shall be complete, accurate and true; incomplete, inaccurate or untrueresponses or information provided therein by a Bidder shall be grounds for the District to reject suchBidder’s Bid Proposal for non-responsiveness. Bid Proposals shall be submitted with the following:● Bid Proposal● Qualification Statement● Attachment A: Subcontractor’s List● Attachment B: DVBE Participation Statement● Attachment C: Non-Collusion Affidavit● Attachment E: Drug-Free Workplace Certification● Attachment G: Bid Bond (10% of the total Bid amount)● Attachment L: Certificate of Insurance, Endorsed to Lynwood Unified School District● Exhibit 1: Letter of Assent2. Bidder and Subcontractors DIR Registered Contractor Status. Pursuant to Labor Code § 1771.1, Biddersmust be a DIR Registered Contractor when submitting a Bid Proposal. The Bid Proposal of a Bidder who isnot a DIR Registered Contractor when the Bid Proposal is submitted will be rejected fornon-responsiveness. All Subcontractors identified in a Bidder’s Subcontractors’ List must be DIR Registeredcontractors at the time the Bid Proposal is submitted.3. Duration of Bid Proposals. Bid Proposals shall not be withdrawn by any Bidder for a period of Sixty days(60) days after the opening of Bid Proposals. During this time, all Bidders shall guarantee prices quoted intheir respective Bid Proposals.____________________________________________________________________________________________________BID # 08MOT26, Lynwood High School-Imperial Site, Demolition (No DSA), Campus Renovations5
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238910Site Preparation Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Southeast Water Pollution Con...
Bid Details RFP for DB-140 Southeast Water Pollution Control Plant - Secondary Clarifiers
San Francisco Public Utilities Commission
Bid Due: 8/05/2026
Project: TEC Modernization Addition Ref. #: 2026-1683 Type: ITB Status: Open Open Date:
Alameda-Contra Costa Transit District
Bid Due: 7/21/2026