Deborah Sampson Park Multipurpose Field
Project Information
- Bid Title
- Deborah Sampson Park Multipurpose Field
- Issuing Agency
- Sharon town
- Location
- Massachusetts
- Published Date
- Jan 27, 2026
- Closing Date
- Jan 30, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Deborah Sampson Park Multipurpose Field
- Attachment Preview
-
GUNHOUSE STREETSITELOCUS MAPLIST OF DRAWINGSSP1.1SP1.2L1.1L2.1L2.2L2.3L3.1L4.1L4.2L4.3L4.4TOPOGRAPHIC SURVEYSITE PREPARATION PLANSITE PREPARATION DETAILSLAYOUT AND MATERIALS PLANGRADING & UTILITY PLANUTILITY DETAIL SHEET IUTILITY DETAIL SHEET IIENLARGEMENT SHEETDETAIL SHEET IDETAIL SHEET IIDETAIL SHEET IIIDETAIL SHEET IVN.T.S.BID DOCUMENTS | JANUARY 14, 2026TOWN OF SHARONDEBORAH SAMPSON PARK MULTIPURPOSE FIELDSHARON, MAOWNERTown of Sharon90 S Main StreetSharon, MA 02067(781) 784-1500LANDSCAPE ARCHITECT/CIVIL ENGINEERActivitas70 Milton StreetDedham, MA 02026(781) 326-2600SURVEYReed Land Surveying, Inc.109 Rhode Island Road #4ALakeville, MA 02347(508) 923-1181TOWN OF SHARONDEBORAH SAMPSON PARK MULTIPURPOSE FIELDBID DOCUMENTS | JANUARY 14, 2026REVISIONS:NO. DATESHEETS REVISEDNOTESPROJECT NO. 24040.00SITE PREPARATION LEGENDPROPERTY LINEAPPROXIMATE LIMIT OF WORKEROSION CONTROL MULCH FILTER SOCKTEMPORARY CONSTRUCTION FENCECURB/FENCE REMOVALUTILITY REMOVALCONSTRUCTION ENTRANCEREMOVE AND DISPOSE OF PAVEMENTREMOVE AND STOCKPILE FOR REUSEEXISTING TOPSOIL (ASSUME 9")REMOVE AND STOCKPILE FOR REUSEEXISTING TOPSOIL (ASSUME 20")REMOVE AND DISPOSE OF GRAVELCLEAR AND GRUB EXISTING VEGETATEDOR FORESTED AREAREMOVE AND DISPOSE OF INVASIVEVEGETATION, PROTECT TREESREMOVE AND DISPOSE OF EXISTING SITEFURNISHINGSILT SACK AT EXISTING CATCH BASINEXISTING TREE REMOVALEXISTING TREE PROTECTIONSITE PREPARATION NOTES1. EXISTING CONDITIONS INFORMATION IS REPRODUCED FROM THESURVEY PREPARED BY REED LAND SURVEYING INC., 109 RHODEISLAND ROAD, SUITE 4A LAKEVILLE, MA, DATED SEPTEMBER 3, 2024.2. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THEFIELD AND REPORT ANY DISCREPANCIES BETWEEN PLANS,SPECIFICATIONS, AND ACTUAL CONDITIONS TO THE LANDSCAPEARCHITECT/CIVIL ENGINEER FOR CLARIFICATION AND RESOLUTIONPRIOR TO STARTING WORK.3. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO EXISTINGCONDITIONS TO REMAIN THAT ARE DUE TO CONTRACTOROPERATIONS.4. ALL ITEMS TO BE REMOVED THAT ARE NOT STOCKPILED FOR LATERREUSE ON THE PROJECT OR FOR DELIVERY TO THE OWNER SHALL BELEGALLY DISPOSED OF OFF SITE BY THE CONTRACTOR.5. THE LOCATIONS OF UNDERGROUND UTILITIES SHOWN ON THIS PLANARE BASED ON THE SURVEY REFERENCED. THE CONTRACTOR SHALLCONTACT DIGSAFE AND THE PROPER LOCAL AUTHORITIES ORRESPECTIVE UTILITY COMPANIES TO CONFIRM THE LOCATION OF ALLEXISTING UTILITIES BEFORE COMMENCING WORK. ANY DAMAGE DUETO FAILURE OF THE CONTRACTOR TO CONTACT THE PROPERAUTHORITIES SHALL BE BORNE BY THE CONTRACTOR.6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING HISEFFORTS OF THE DEMOLITION WITH ALL TRADES.7. THE CONTRACTOR SHALL COORDINATE ALL ADJUSTMENTS ORABANDONMENT OF UTILITIES WITH THE RESPECTIVE UTILITY COMPANY.8. THE CONTRACTOR SHALL MAINTAIN OR ADJUST TO NEW FINISHGRADE (AS NECESSARY) ALL UTILITY AND SITE STRUCTURES SUCH ASMANHOLES, CATCH BASINS, ETC. FROM MAINTAINED UTILITY ANDSITE SYSTEMS UNLESS OTHERWISE NOTED OR DIRECTED BY THELANDSCAPE ARCHITECT/CIVIL ENGINEER.9. THE CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING PER THEPLANS AND SPECIFICATIONS. CONTRACTOR MUST TAKEAPPROPRIATE MEASURES TO MAINTAIN A SECURE SITE THROUGHOUTTHE PROJECT.10. CONTRACTOR SHALL INSTALL ALL EROSION CONTROL MEASURESAROUND THE OUTSIDE PERIMETER (LIMIT OF WORK) AS SHOWN ONPLAN PRIOR TO COMMENCING DEMOLITION AND EARTHWORKOPERATIONS.11. CONTRACTOR SHALL CONFIRM BENCHMARKS AND CONTROLPOINTS IN FIELD PRIOR TO DEMOLITION.SHUT OFF EXISTING 1" CONNECTION ATSTREET; DELIVER METER TO OWNER; REMOVEAND DISPOSE OF EXISTING METER PIT,VALVE, AND ASSOCIATED WATER LINESREMOVE AND DISPOSE OF INVASIVEVEGETATION; EXISTING TREES TOREMAIN AND BE PROTECTED TO THEEXTENT PRACTICABLEREMOVE AND DISPOSE OF GRAVELDRIVEWAY, ASSUME 12" DEPTH1 TEMPORARY CONSTRUCTION FENCE,SP1.2 TYPICAL; FENCE SHALL REMAIN FORENTIRETY OF GROW-IN PERIODEXISTING TREE REMOVAL, TYPICALSAWCUT EXISTING ASPHALTPAVEMENT; EXISTING ASPHALTPAVEMENT TO REMAIN ANDBE PROTECTED AT SIDEWALKREMOVE AND DISPOSE OFPAVEMENT, TYPICAL6 EXISTING TREE PROTECTIONSP1.2EXISTING FENCING AT COURTS TO REMAINAND BE PROTECTEDEXISTING GATES TO REMAIN CHAINEDAND LOCKED BY CONTRACTOR DURINGDURATION OF CONSTRUCTIONCONTACT DIGSAFE:UNDERGROUND UTILITIES SHOWN ON THE PLAN ARE COMPILED FROM PLANS AND FIELD SURVEY. UTILITY LOCATIONSSHOULD BE CONSIDERED APPROXIMATE ONLY. DIGSAFE AND OR THE OTHER RESPECTIVE UTILITY COMPANIES SHALL BECONTACTED 72 BUSINESS HOURS IN ADVANCE OF CONSTRUCTION OPERATIONS. PHONE DIGSAFE 1-888-344-7233.SAWCUT EXISTING ASPHALTNEXT TO EDGE OF PAVEMENT5 CONSTRUCTION ENTRANCESP1.2CUT BACK AND REMOVEEXISTING GRANITE CURBREMOVE AND DISPOSE OF QUICK COUPLERSAND WATER LINES TO THE LIMIT OF PROPOSEDFIELD; CONTRACTOR SHALL LOCATE ANDFLAG WATER SERVICE FOR CONNECTION TOPROPOSED IRRIGATION SYSTEMEXISTING FENCING TO BEREMOVED BY OTHERSANY GARDENING MATERIALS REMAININGONSITE SHALL BE CONSIDERED ABANDONEDAND SHALL BE REMOVED AND DISPOSED.CLEAR AND GRUB AND DISPOSE OFREMAINING VEGETATIONREMOVE AND STOCKPILE FOR REUSEEXISTING TOPSOIL; ASSUME 20" DEPTHWITHIN GARDEN AREAS AND 9" DEPTHWITHIN OTHER AREAS, TYPICALNOTE: REFER TO DETAILS FOR EROSIONCONTROLS AT STOCKPILE AREASPROTECT EXISTING SIGN TO REMAIN3 SILT SACK AT CATCH BASINSP1.2CLEAR AND GRUB VEGETATION;CONTRACTOR TO VERIFY TREE REMOVALAND TREE LIMBING LIMITS WITHLANDSCAPE ARCHITECT/CIVIL ENGINEERPRIOR TO COMMENCING CLEARINGAND GRUBBING OPERATIONS. ALL TREESTUMPS AND ASSOCIATED ROOTSYSTEMS SHALL BE REMOVED WITHIN THELIMIT OF WORK, TYPICAL70 Milton Street | Dedham, MA 02026-2915(781) 326-2600 | activitas.comCONSULTANTSSURVEY -REED LAND SURVEYING, INC.REMOVE AND DISPOSE OFEXISTING SHED ANDASSOCIATED FOOTINGS/SLAB4 EROSION CONTROL STRAWSP1.2 WATTLE, TYPICALCONCRETE VAULT WITH ACCESS HATCH,ASSUME 30' DEPTH, ASSUME 15" CONCRETETHICKNESS; CONTRACTOR SHALL REMOVEAND DISPOSE OF TOP SLAB AND METALACCESS HATCH, REMOVE WALLS TO ATLEAST 1' BELOW FIELD SUBGRADE, REMOVEAND DISPOSE OF STAIRS AND ELECTRICALEQUIPMENT, REMOVE AND RETURN PUMPSTRUCTURES TO OWNER, CAP WATER LINESTO BE ABANDONED IN PLACE,PULVERIZE-IN-PLACE CONCRETE FLOOR,BACKFILL BOTTOM OF VAULT WITH 12” OFFREE DRAINING DRAINAGE STONE, INSTALLLAYER OF NON-WOVEN GEOTEXTILEFABRIC, AND BACKFILL VAULT WITHCOMMON FILL IN LIFTS. FROM THE BOTTOMOF THE VAULT TO WITHIN 5’ OF THE FINISHGRADE, LIFTS SHALL BE PLACED IN 15”-18”THICKNESS AND COMPACTED TO 95%MAXIMUM DRY DENSITY. WITHIN 5’ OF FINISHGRADE, LIFTS SHALL BE PLACED IN 12”MAXIMUM THICKNESS AND COMPACTEDTO A 95% MAXIMUM DENSITY.CONTRACTOR SHALL BE RESPONSIBLE FORANY DEWATERING WITHIN EXISTING VAULTREQUIRED TO COMPLETE WORK.CLEAR AND GRUB VEGETATION;CONTRACTOR TO VERIFY TREE REMOVALAND TREE LIMBING LIMITS WITHLANDSCAPE ARCHITECT/CIVIL ENGINEERPRIOR TO COMMENCING CLEARINGAND GRUBBING OPERATIONS. ALL TREESTUMPS AND ASSOCIATED ROOTSYSTEMS SHALL BE REMOVED WITHIN THELIMIT OF WORK, TYPICALEXISTING LIGHT POLES AND ASSOCIATEDWIRING TO REMAIN AND BE PROTECTED0'15'30'60'90'Bid DocumentsJanuary 14, 2026REVISIONS:NO. DATEDESCRIPTIONSCALE:1" = 30'-0"PROJECT NO.:24040.00FILE:24040.00-SP1.1-SP_PLAN.dwgDRAWN:CHECKED:OCMHCGSEAL:SHEET TITLE:SITE PREPARATION PLANSHEET NO:SP1.12"x2" WOOD STAKE, TYPICALMULCH FILTER SOCKFLOWCOMPACTEDEXCAVATED SOILUNDISTURBEDAREADISTURBEDAREASECTIONDISTURBEDAREA102101100UNDISTURBEDAREASTAKE 4' ONCENTER (MAX.)MULCH FILTER SOCKPLAN VIEW1MULCH FILTER SOCKNOT TO SCALENOTES:1. PLACE MULCH FILTER SOCK ON LEVELGRADE. EXTEND BOTH ENDS OF THE TUBEAT LEAST 8'-0" UPSLOPE AT 45 DEGREES TOTHE MAIN ALIGNMENT.2. REMOVE DEPOSITS WHEN SEDIMENTACCUMULATION IS ONE THIRD THE HEIGHTOF THE EXPOSED MULCH FILTER SOCK ORONE HALF OF THE EXPOSED FILTER SOCK.3. MULCH FILTER SOCK SHALL REMAIN INWORKING ORDER UNTIL THE SITE ISSTABILIZED. ADDITIONAL EROSIONCONTROLS SHALL BE INSTALLED AS NEEDEDTO PREVENT SILT FROM LEAVING THE SITEAT NO ADDITIONAL COST TO THE OWNER.4. ALL CONTROLS SHALL BE SET 5' FROMBOTTOM TOE OF SLOPE.STAKE 4' ON CENTER (MAX.)INSTALL MULCH FILTER SOCKIN ACCORDANCE WITH"MULCH FILTER SOCK" DETAIL2 TEMPORARY MATERIAL STOCKPILENOT TO SCALENOTES:1. STOCKPILE TO BE LOCATED IN AN AREA WHICHPROVIDES MAXIMUM PROTECTION AGAINST EROSION.2. ARCH SHAPED CONTINUOUS STAKED MULCH FILTERSOCK TUBE DIKE ALONG DOWN GRADIENT OF SLOPE.11 GAUGE FABRIC TIES12" O.C. AT TOP RAILCL8' O.C. MAXIMUMCL4"1'-6"4 TEMPORARY CONSTRUCTION FENCENOT TO SCALE1 5/8" O.D. TOP RAILCONNECTOR BANDBEVELED EDGE TENSION BANDSWHEREVER FABRIC ENDSDIAMOND FABRIC, KNUCKLEDSELVAGE, TOP AND BOTTOM1.90" O.D. LINE POSTCONCRETE BLOCK4,000 PSI REDI-MIXNOTES:1. TEMPORARY CONSTRUCTION FENCE SHALL BEPROVIDED AT PROJECT LIMITS AS SHOWN ON THESITE PREPARATION PLAN AND AS SPECIFIED.CONTRACTOR PROPOSED MODIFICATIONS TOTEMPORARY CONSTRUCTION FENCE, SUCH AS BUTNOT LIMITED TO THE USE OF SNOW FENCE (ORSIMILAR) WILL NOT BE CONSIDERED, UNLESSOTHERWISE NOTED.2. POST SPACING SHALL BE EQUIDISTANT.3. CONTRACTOR SHALL MAINTAIN A SECURE SITE ATALL TIMES. CONTRACTOR SHALL PROVIDEADDITIONAL TEMPORARY CONSTRUCTION FENCE ATNO ADDITIONAL COST TO THE OWNER IF NECESSARYTO PROPERLY SECURE THE SITE.BOTTOM RAILFINISH GRADE50' (MIN)SITE10'(MIN)PLAN VIEWSITE50' (MIN.)FILTERFABRIC2 - 3" CRUSHED3' 5:1EXISTINGPAVEMENTEXISTINGPAVEMENTMOUNTABLEBERMNOTES:1. ENTRANCE WIDTH SHALL BE A TWENTY-FIVE (25) FOOTMINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTSWHERE INGRESS OR EGRESS OCCURS. CONTRACTORSHALL REVIEW FINAL LOCATION AND SIZE ON TEMPORARYCONSTRUCTION ENTRANCE WITH OWNER ANDLANDSCAPE ARCHITECT PRIOR TO MOBILIZATION.2. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITIONWHICH SHALL PREVENT TRACKING OR FLOWING OFSEDIMENT INTO RIGHT-OF-WAY OR ADJACENT PARKINGAREAS AND DRIVES. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH ADDITIONAL STONE AS CONDITIONSDEMAND AND REPAIR OR CLEANOUT OF ANY MEASURESUSED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED,WASHED AND/OR TRACKED ONTO PUBLICRIGHTS-OF-WAYS OR ADJACENT PARKING AREAS ANDDRIVES MUST BE REMOVED IMMEDIATELY. MOUNTABLEBERM SHALL BE PERMITTED. PERIODIC INSPECTION ANDMAINTENANCE SHALL BE PROVIDED.3. CONTRACTOR SHALL WASH WHEELS OF VEHICLES ATCONSTRUCTION ENTRANCE PRIOR TO VEHICLES EXITINGSITE TO PREVENT SOIL MATERIAL FROM BEING TRACKEDFROM THE SITE.4. PERIODIC INSPECTION AND MAINTENANCE SHALL BEPROVIDED.5 TEMPORARY CONSTRUCTION ENTRANCENOT TO SCALEEXISTING TREE; WRAP WITH TWOLAYERS OF BURLAP AND WITHTWO LAYERS OF STANDARDSNOW FENCE. WIRE TO FASTENSECURELYTREE PROTECTION FENCE. USESTANDARD SNOW FENCE, 4' HT.PLACE FENCE UNDERNEATHDRIPLINE, BUT NO CLOSER THAN8'-0" FROM TRUNKMETAL POST TO SUPPORT FENCE,(6 MINIMUM REQUIRED), DRIVENINTO THE GROUND 2'-0"MINIMUM, EQUAL SPACINGAROUND TREECROWN DRIP LINE OF OTHER LIMIT OF TREE PROTECTION AREAEXISTING TREE; WRAP WITH TWOLAYERS OF BURLAP AND WITH TWOLAYERS OF STANDARD SNOWFENCE. WIRE TO FASTEN SECURELY8.5" x 11" LAMINATED SIGNWHICH READS "KEEP OUTTREE PROTECTION AREA".SIGNS SHALL BE SPACEDEVERY 50' ALONG THE FENCEKEEPOUTNOTES:1. CONTRACTOR SHALL NOTOPERATE ANY EQUIPMENT WITHINTHE LIMIT OF PROTECTIVEFENCING INCLUDING DURINGFENCE INSTALLATION ANDREMOVAL PROCEDURES2. REFER TO SITE PREPARATION PLANAND SPECIFICATIONS FORADDITIONAL INFORMATIONTREE PROTECTION FENCE. USESTANDARD SNOW FENCE, 4' HT. PLACEFENCE UNDERNEATH DRIPLINE, BUT NOCLOSER THAN 8'-0" FROM TRUNK2" x 6' STEEL POST OR APPROVED EQUAL.POSTS SHALL BE SPACED EVERY 9'-4" MIN.5" THICK LAYER OF MULCHMAINTAIN EXISTING GRADE WITH THETREE PROTECTION FENCE UNLESSOTHERWISE NOTED ON THE PLANSPLAN VIEW6 EXISTING TREE PROTECTIONNOT TO SCALESECTION VIEWFLOWFLOWCATCHBASININSTALL FILTER FABRICSILT SACK, REFER TOSPECIFICATIONS3SILT SACKNOT TO SCALE70 Milton Street | Dedham, MA 02026-2915(781) 326-2600 | activitas.comCONSULTANTSSURVEY -REED LAND SURVEYING, INC.Bid DocumentsJanuary 14, 2026REVISIONS:NO. DATEDESCRIPTIONSCALE:PROJECT NO.:FILE:DRAWN:CHECKED:SEAL:AS NOTED24040.0024040-SP1.2-SP_DET.dwgJEFHCGSHEET TITLE:SITE PREPARATIONDETAILSSHEET NO:SP1.2
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RFR DCR 781 Fire Management P...
Bid Solicitation: BD-18-1020-DCRCU-DC250-28535 Header Information Bid Number: BD-18-1020-DCRCU-DC250-28535 Description: RFR DCR 781 Fire
Commonwealth of Massachusetts
Bid Due: 12/25/2027
Marel Scales Maintenance Serv...
Follow Marel Scales Maintenance Services 2026-2031 Active Contract Opportunity Notice ID REQUIREMENTS-26-2420 Related
COMMERCE, DEPARTMENT OF
Bid Due: 7/09/2026