TCA Video Surveillance RFQ
Project Information
- Bid Title
- TCA Video Surveillance RFQ
- Issuing Agency
- Port of Pasco
- Location
- Washington
- Published Date
- Apr 7, 2026
- Closing Date
- Apr 20, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
TCA Video Surveillance RFQ
The Port of Pasco ("Port") invites qualified and licensed firms to submit quotations to furnish, configure, and install a comprehensive video surveillance system at the Tri-Cities Airport (PSC). This RFQ is intended to identify a vendor that can deliver a reliable, scalable solution that meets the Port’s operational, security, and compliance requirements.
This is a Request for Qualifications (RFQ) for the procurement and installation of a new/existing video surveillance system at the Tri-Cities Airport.
RFQ’s are due April 20 th , 2026, no later than 4PM. Mail or hand deliver to 1110 Osprey Pointe Ave Suite 201 Pasco, WA 99301.
RFQ Port of Pasco TCA Video Project
- Attachment Preview
-
Port of PascoVideo Surveillance UpgradeREQUEST FOR QUALIFICATIONS:The Port of Pasco ("Port") invites qualified and licensed firms to submit quotations to furnish, configure, andinstall a comprehensive video surveillance system at the Tri-Cities Airport (PSC). This RFQ is intended toidentify a vendor that can deliver a reliable, scalable solution that meets the Port’s operational, security, andcompliance requirements.This is a Request for Qualifications (RFQ) for the procurement and installation of a new video surveillancesystem at the Tri-Cities Airport.Deliverables:1.System and Equipment: Supply, configure, and install all necessary equipment, including but not limited tocameras, network video recorders (NVRs), servers, network switches, and cabling.2.Camera Licensing: Provide licensing for a total of 220 cameras.3.Video Storage: The system must provide a minimum of 120 days of continuous video storage at a specifiedresolution and frame rate. The proposed storage solution should be scalable for future expansion.Technical Specifications & Requirements• Video Recording: The system must be capable of continuous recording 24/7 of all 240 cameras.• Camera Resolution & Frame Rate: Specify a minimum resolution and frame rate for the cameras. Forexample, "a minimum of 1080p (2MP) resolution at 15 frames per second (fps)." This is crucial forcalculating the required storage.• Storage Calculation: Proposers should detail their storage solution and provide a calculation showinghow they will achieve the 120-day storage requirement.• System Access: The system must include secure access for authorized personnel.• Licensing: All licenses for cameras and software must be perpetual and do not require recurringannual fees unless specified otherwise.Port of Pasco, Tri-Cities Airport Video Surveillance Upgrade1|PageLegal and Compliance RequirementsAll proposed solutions must comply with federal, state, and local laws and regulations, including WashingtonState RCW (Revised Code of Washington). A critical point for compliance is RCW 9.73.030, which isWashington's two-party consent law for audio recordings.Audio Recording: The video surveillance system must not record audio in any area where a person has a"reasonable expectation of privacy" as defined by Washington law. This includes indoor spaces like offices,restrooms, and private meeting rooms. While the law permits video recording in public spaces where thereis no expectation of privacy (e.g., airport terminals, parking lots), recording a private conversation withoutthe consent of all parties is a crime.Installation Licensing: All vendors and their technicians must be properly licensed to install low-voltagesystems in the State of Washington.PROCESS & TIMELINE:Firms submitting a response to the RFQ will be asked at a minimum, to state their qualifications,understanding/experience relating to the procurement and installation of a new surveillance system for theTri-Cities Airport, Port Administration Building and Port’s Big Pasco Maintenance building.Submit 5 hard copies in person or by mail to the Port of Pasco Administrative Office, 1110 OspreyPointe Ave., Suite 201, Pasco, WA 99301.SCHEDULERFQ ReleasedCut off for QuestionsAddendum IssueSubmittals DueNotice of Preferred CandidateMarch 30, 2026April 8, 2026April13. 2026April20, 2026April 27-30, 2026Questions may be submitted by e-mail to Jaime Vera at Jvera@portofpasco.org until the cut-offdate. The Port will attempt to respond to all parties who have requested a copy of the RFQ, but itis the responsibility of the parties to ensure they have provided a primary point of contact andthat the point of contact information provided is correct.Copies of this RFQ may also be obtained at the Port of Pasco Administrative Office, 1110 Osprey PointeAve., Suite 201, Pasco, WA 99301, during the hours of 9:00 a.m. and 3:30 p.m., Monday through Fridayor from the website at www.portofpasco.orgATTACHMENTS TO RFQ1. Professional Services AgreementHOW TO SUBMITInterested firms should submit the information in person or by mail to the following address no later than4:00 April 20, 2026. Please provide five (5) hard copies of the submittal for review.Port of Pasco, Tri-Cities Airport Video Surveillance Upgrade2|PageJaime VeraProject ManagerPort of Pasco1110 Osprey Pointe Ave, Suite 201Pasco, WA 99301jvera@portofpasco.orgSubmittal Contents1. Cover Letter: A brief letter introducing the firm and expressing interest in the project.2. Project Approach: A detailed narrative outlining the firm's approach to completing the procurement,installment, including methodology, a proposed timeline, and how they will manage coordinationfor the video surveillance project.3. Team and Qualifications: Resumes and professional licenses for the proposed project team,including the Project Manager and lead professionals.4. Minimum of three similar projects as work experience.5. References: A list of three (3) professional references from clients for whom similar workhas been performed.Submittal EvaluationThe review panel will include the Airport Executive Director, Port Project Manager, AirportFacilities Manager, Assistant Airport Director of Public Safety and Assistant Airport Director ofFacilities and Maintenance. Firms will be rated on submittal contents outlined above. Eachelement will be equally weighed. The panel will score independently and meet to determine topcandidate. The committee reserves the right to call for in-person interviews for top 2 or 3candidates. Interviews will be scored separately and combined with submittal evaluation scoresfor an overall total score.ContractThe winning consultant will be expected to enter into a Professional Service Agreement with thePort of Pasco, the preliminary form of which is attached as Attachment 1. The winning firm willbe required to provide a breakdown of their fee upon request. There will be an upfront contractamount not to exceed a dollar amount for a specific time to perform the Warehouse FacilityAssessment requested by the Port.AddendaAs the Port determines it is appropriate, it will issue addenda to this RFQ. Each consultant shallprovide the Port with contact information for receipt of such addenda. Any applicant whodownloads the RFQ from www.portofpasco.org or otherwise obtains this document, must sendan e-mail to Jaime Vera at Jvera@portofpasco.org with the party’s contact information in orderto receive any addendum. The Port is not responsible for e-mail delivery failure for any reason. Itshall be conclusively presumed that the applicant did, before submitting a Response to the RFQread all addenda, posted decisions, and other items relevant to the qualifications. All addendashall be acknowledged by the firm and returned to the Port with the submittal document.OPEN PUBLIC RECORDS ACTDocuments submitted in response to this RFQ are subject to the Washington State Open PublicRecords Act, RCW 42.56. If the proposer believes that any information, data, process or othermaterial in its proposal constitutes trade secrets, privileged information, or confidentialPort of Pasco, Tri-Cities Airport Video Surveillance Upgrade3|Pagecommercial, financial, geological, or geophysical data, then the proposer should mark thoseitems as confidential or proprietary and provide a list of those items with specificity as to thepage and paragraph and on what basis it believes the material is confidential or proprietary. ThePort is not bound by the proposer’s determination as to whether materials are subject todisclosure under the Public Records Act.If the Port receives a request for such information marked as confidential, it will notify theconsultant that the information has been requested. The notice will provide that theinformation will be released in ten business days and then any applicable regulatory challenge toprevent the disclosure of the information will be the sole burden of the firm.The consultant agrees 1) to intervene in any lawsuit arising out of a request for its materials toprotect and assert its claims of privilege against disclosure of such material; 2) that its failure toobject or intervene and assert claims of privilege against disclosure in relation to its proprietaryor confidential information results in waiver the same; 3) to release and defend, indemnify andsave and hold harmless the Port, its officers, agents and employees, from any claim, damages,expense, loss or costs, including reasonable attorneys’ fees, arising out of or in any way relatingto requests for disclosure of material provided or produced in response to this RFQ.PROPOSAL PREPARATION, CONSULTANTS COSTS AND EXPENSESThe Port is not liable for any costs or expenses arising out of preparation of the consultant’ssubmittal. If selected, the consultant may not include any of these costs or expenses as part of itsfee, rates, or charges for performing work under the Contract. Proposals should be preparedsimply, economically, providing straightforward, concise description of proposer’s ability tosatisfy the requirements of the RFQ.The successful consultant will supply its own materials and will provide and pay for all labor,supervision of its employees and agents, travel, insurance, vehicles, materials, and toolsnecessary to provide services under the resulting contract.The Port reserves the right to reject any or all submittals, waive informalities, and make the awardin the best interest of the Port. The Port reserves the right to contact a firm for clarifications of itsproposal during the evaluation process. The successful firm should be prepared to accept this RFQ forincorporation into an AGREEMENT resulting from this RFQ. It is also understood that the proposalwill become part of the official contract file.Port of Pasco, Tri-Cities Airport Video Surveillance Upgrade4|PageATTACHMENT #1Professional Services AgreementAGREEMENT FOR PROFESSIONAL SERVICESTHIS AGREEMENT is made as of theday of, 202_, byand between PORT OF PASCO, P. O. Box 769, 1110 Osprey Pointe Blvd, Suite 201,Pasco, Washington 99301, hereinafter referred to as the PORT, and,,, Washington, hereinafter referred to as theCONSULTANT.WHEREAS the PORT requires professional services, the scope of which isdescribed in Exhibit A, which is attached hereto and incorporated herein, hereinafterreferred to as the “PROJECT”.NOW, THEREFORE, the PORT and CONSULTANT, in consideration of their mutualcovenants herein, agree as set forth below.STANDARD TERMS AND CONDITIONSSECTION 1. SERVICES AND FEE: The CONSULTANT will provide the servicesdescribed in Exhibit A, according to all the terms and conditions of this Agreement. ThePORT will pay CONSULTANT on a billable-hours basis up to the amount described inExhibit A, which is expressly understood as a not-to-exceed fee.SECTION 2. TERM: The term of this agreement is from the date executed by bothparties until , 20 . This date may be extended by mutual agreement andamendment to this Agreement by the PORT and CONSULTANT.SECTION 3. TERMS OF PAYMENT: Payment for services specified herein will be dueand payable thirty (30) days after receipt of invoice unless otherwise specified herein.Any monies not paid when due under this Agreement shall bear a finance charge at therate of one percent (1%) a month on the balance until paid.Payments under this Agreement shall not exceeddollars and no cents ($ ). Thisnot-to-exceed amount may be increased by mutual agreement and amendment to thisAgreement by the PORT and CONSULTANT.SECTION 4. TERMINATION: This Agreement may be terminated by the PORT uponseven (7) days written notice without cause. CONSULTANT may terminate thisAgreement upon seven (7) days written notice in the event of substantial failure by thePORT to perform in accordance with the terms hereof. In the event of terminationPort of Pasco, Tri-Cities Airport Video Surveillance Upgrade5|Page
- Commodity Codes
-
- NAICS 561621Security Systems Services (except Locksmiths)
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
CITYWIDE CONSULTANT ROSTER: P...
Project ID: CTY-CR-2025-04 Title: CITYWIDE CONSULTANT ROSTER: Public Safety and Emergency Preparedness Consulting
City of Seattle
Bid Due: 12/30/2030
CITYWIDE CONSULTANT ROSTER SO...
Project ID: CTY-CR-2025-03 Title: CITYWIDE CONSULTANT ROSTER SOLICITATION: Communications Consulting (Small Businesses Only)
City of Seattle
Bid Due: 12/30/2030