COMMISSIONING AGENT (CxA) SERVICES
Project Information
- Bid Title
- COMMISSIONING AGENT (CxA) SERVICES
- Issuing Agency
- City of Durango
- Location
- Colorado
- Published Date
- Feb 6, 2026
- Closing Date
- Mar 12, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- City of Durango CH-PD CxA RFQP final
- Attachment Preview
-
REQUEST FOR QUALIFICATIONS & PROPOSAL (RFQ/P)forCOMMISSIONING AGENT (CxA) SERVICESfor theCity of Durango City Hall & Police DepartmentFebruary 5, 2026Owner:City of Durango949 E 2nd AvenueDurango, CO 81301Owner’s Representative:Artaic Group2650 18th Street, Suite 301Denver, CO 80211Milestone Dates:Qualifications and Proposal Due: March 12, 2026; 3:00pm MST (Via electronic submittal)Page 1 of 12Request for QualificationsInvitationThe City of Durango (“City” or “Owner”) is issuing this Request for Qualifications and Proposal (RFQ/P) to firmsand/or individuals (Professional Services Providers) interested in providing Commissioning Agent (CxA) services forthe new City Hall and Police Department project located in Durango, Colorado. The Architect and subconsultantswill be expected to collaborate in a transparent and efficient manner with the City and the Owner’sRepresentative, the Artaic Group.All official communication with Candidates and questions regarding this RFQ/P will be via the Bidnet site atwww.bidnetdirect.com/colorado.All Candidate inquiries will be responded to collectively by the “Clarification Deadline” in the schedule notedbelow. A clarification addendum with replies to all questions will be posted on Rocky Mountain Bid Net. NO OTHERCONTACT SHALL BE MADE REGARDING THIS REQUEST FOR QUALIFICATIONS WITH ANY OTHER CITY OFDURANGO STAFF, COUNCIL MEMBERS, AGENTS, CONSULTANTS, ETC. DURING THE REQUEST FOR PROPOSALPROCESS.I. OWNER’S BACKGROUND & PROGRAM INFORMATIONA. Owner BackgroundThe City of Durango purchased the historic building at 201 East 12th St. and the Big Picture Building at215 E 12th St from the Durango Fire Protection District in August 2023. The City Council has since directedstaff to enhance the city's customer service through redesigning and renovating the property as a new hometo a centrally located City Hall and Police Department. The project would be funded primarily through thecity’s 2005 Half-Cent Sales tax if voters choose to reauthorize the tax in the city’s April 2025 election.B. Project DescriptionThe current program, as defined in Exhibit A (City of Durango’s Vision and Feasibility Analysis) is to renovateand redesign the existing historic high school building into a new city hall building as well as renovate andredesign the current community development and engineering building into a new police department. Inaddition to the renovations of the two existing buildings, the site will utilize the current parking area on thewest side of the building through the addition of a new parking garage.C. Supporting DocumentsExhibits associated with this RFQ/P will also be posted on the Bidnet site.- Exhibit A – Project Milestone Schedule- Exhibit B – CxA Services Fee Worksheet- Exhibit C – Sampling Rate RequirementsFuture Exhibits (these will be issued to shortlisted candidates)- Exhibit D – Early SD Designs- Exhibit E – Professional Service Agreement/Draft ContractPage 2 of 12D. Procurement ScheduleTASKRFQ/P AVAILABLERFQ/P CLARIFICATION DEADLINERFQ/P CLARIFICATION RESPONSES ISSUEDRFQ/P RESPONSES DUE & PROPOSALS DUERELEASE SHORT-LISTED CANDIDATESVIRTUAL INTERVIEWSCANDIDATE NOTIFIED OF SELECTIONDATEFebruary 6, 2026February 25, 2026; 3:00 pm MSTMarch 3, 2026March 12, 2026; 3:00 pm MSTMarch 16, 2026March 24, 2026March 27, 2026E. Submission Instructions1. Statements of Qualifications, Proposal, and Fee Worksheet must be submitted via electronic submittal.The submittal package should be addressed to Bob Grogan, Purchasing Manager, and sent via BidNet. Thebidnet site will stop accepting proposals at that time of 3:00 PM MST, so submit your package early toavoid being locked out of the site.Please note that submittals received via email will not be accepted.2. The City of Durango reserves the right to reject any statements of qualifications and to accept thestatements of qualification deemed most advantageous to the best interest of the City.3. Statements of Qualifications shall be marked as follows: Commissioning agent (CxA) Services RFQ/P –City of Durango City Hall and Police Department4. Check List – The information required in Section III of the RFQ/P must be submitted.Responses should be addressed to:Bob Grogan, Purchasing ManagerCity of Durango949 E 2nd AvenueDurango, CO 81301II. PROJECT TEAM, EXPECTATIONS, AND PROJECT SCOPEA. Project Team Members1. OWNER TEAM- Owner: City of Durango- Owner’s Representative: Artaic Group2. DESIGN TEAM – HDR and Roth Sheppard3. CMAR TEAM – FCI Constructors. Inc.Page 3 of 12B. Scope of WorkThe Owner is dedicated to overseeing the commissioning of the facility, ensuring that all systems are fullyinstalled and operational before occupancy. They also aim to provide the facilities’ staff with comprehensivesystem documentation and training.Commissioning involves a systematic approach to documenting specific components and ensuring the systemsare designed, installed, and initiated correctly. Furthermore, functional tests are conducted to verify anddocument the proper operation of the systems under various modes and conditions. The training of ownerpersonnel will also be verified, and a thorough review of the final project operations and maintenance (O&M)documents will be conducted to ensure their completeness.For purposes of responding to the RFQ/P, please assume the following systems shall be commissioned andthat all will be held to the most recent code requirements:Central Building Automation SystemNew HVAC EquipmentEnhanced Filtration UnitsOccupancy Sensors and Lighting ControlsNew Electrical EquipmentFire Alarm PanelGeneratorsAir Compressor SystemsSecurity SystemsBASE SCOPEFire Protectiona.Wet and dry systems, with an FM200 suppression system.Plumbinga.(2) water-to-water heat pump with backup electric tankb.Circulation system.HVACa. Boiler/Tower Water Source Heat Pump Systemb. Closed circuit fluid cooler with finned coil for dry/winter operation.c. High efficiency hybrid (heat pump/gas) central boiler plant.d. High efficiency ducted water source heat pumps. One per thermal zone.e. Variable flow primary and secondary system pumps.f. Heat exchanger for outside air glycol loop.g. Roof-mounted water source heat pump energy recovery ventilators (outside air & exhaust) with an enthalpywheel.h. Web-based enabled building automation system. Verification of control points and the sequence of operationfor all mechanical equipment.i. Water source heat pump domestic hot water generators.Electrical / Lightinga.Generatorsb.Lighting Controlsc.Energy MetersBuilding EnvelopePage 4 of 12a. Buildings or portions of buildings, including Group R and I occupancies, shall meet the provisions of SectionC402.5.2Exceptions: Buildings in Climate Zones 2B, 3C, and 5Cb. Buildings or portions of buildings other than Group R and I occupancies shall meet the provisions of SectionC402.5.3.Exceptions: Buildings in Climate Zones 2B, 3B, 3C, and 5CBuildings larger than 5,000 square feet floor area in Climate Zones 0B, 1, 2A, 4B, and 4C.Buildings between 5,000 square feet and 50,000 square feet floor area in Climate Zones 0A, 3A, and 5Bc. Buildings or portions of buildings that do not complete air barrier testing shall meet the provisions ofSection C402.5.1.3 or C402.5.1.4 in addition to Section C402.5.1.5.ALTERNATE SCOPE1. Monitoring and Verification (1st Year)2. Monitoring and Verification (2nd Year)3. Energy Model Validation4. Energy Rebate Applications and Oversight5. Air & water testing for sliding aluminum-framed glass doors – AAMA 502 (equivalent to ASTME783/E1105)6. Acoustical testing on wood sound doors – ASTM E336/E4137. Air & water testing for aluminum framed entrances and storefronts - ASTM E783/E11058. Air & Water testing for curtain walls – ASTM E783/E11059. Waterproofing assembly testing over conditioned spaces10. ELD testing on TPO roof – ASTM D8231The following is a summary of the commissioning scope that the Owner intends to have implemented on thisproject.DESIGN PHASE1. Develop Owner’s Project Requirements documentation for clarity and completeness, including languagefor the systems shown in Section II. B.2. Work with design professionals in documenting the Basis of Design.3. Verify the Basis of Design in regard to the Owner’s Project Requirements.4. Be involved in design workshops, design reviews, and value engineering discussions prior to the start ofthe construction documents phase of work.5. Complete a thorough review of the design documents following issuance of Schematic Design Documents,Design Development Documents, and Construction Documents for each project. Comments will besubmitted to the owner, Owner’s Representative, and A/E team.6. Develop full commissioning specifications for all commissioned equipment. Coordinating this with thearchitect and engineers and integrating the commissioning specifications into the overall projectspecification package. The specifications shall follow the intent of ASHRAE Guideline 0-2005, TheCommissioning Process. The commissioning specifications will include a detailed description of theresponsibilities of all parties, details of the commissioning process, reporting and documentationrequirements (including formats), alerts to coordination issues, deficiency resolution, constructionchecklist and startup requirements, the functional testing process, and specific functional testrequirements, including testing conditions and acceptance criteria for each piece of equipment beingcommissioned.7. Develop a commissioning plan encompassing the Design, Construction, Occupancy, and OperationsPhases.8. Review Energy Model inputs and parameters.Page 5 of 12
- Commodity Codes
-
- NAICS 541330Engineering Services
- NAICS 541690Other Scientific and Technical Consulting Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
CCCS RFI 26-009 TRANSCRIPT EV...
Description: CCCS RFI 26-009 TRANSCRIPT EVALUATION SOFTWARE Department: Colorado Community College System Buyer:
State Government of Colorado
Bid Due: 7/15/2026
Public Opinion Polling Services
Bid Title: Public Opinion Polling Services Category: BoCC Status: Open Description: Clear Creek
Clear Creek County
Bid Due: 7/10/2026