Runway 9-27 Extension - RFP 2026-01-AP Addendum #4
Project Information
- Bid Title
- Runway 9-27 Extension - RFP 2026-01-AP Addendum #4
- Issuing Agency
- City of DeFuniak Springs
- Location
- Florida
- Published Date
- Mar 6, 2026
- Closing Date
- Mar 10, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
1. Runway 9-27 Extension - RFP 2026-01-AP
- Attachment Preview
-
4211 West Boy Scout Blvd.Suite 290Tampa, FL 33607TEL 813.509.2416w w w .Ga r ve r U SA.comADDENDUM NO. 4 (FINAL)Date: Friday, March 6, 2026Project Name: Runway 9-27 ExtensionOwner: City of DeFuniak SpringsOwner Project No: RFP 2026-01-APGarver Project No: 2300226This addendum shall be a part of the Plans, Contract Documents and Specifications to the same extent asthough it were originally included therein, and it shall supersede anything contained in the Plans, ContractDocuments, and Specifications with which it might conflict. This addendum, including all attachments, shallbecome part of the Contract and all provisions of the Contract shall apply thereto. The time provided forcompletion of the Contract has not been changed as noted in this addendum. Acknowledgement of receipt ofthis addendum must be noted in the appropriate section of the Bid Form and included with the ContractDocuments.The bid submission deadline is not revised as part of this Addendum.A. QUESTIONS AND ANSWERS1. Question: We have a question about spec P-211. It calls for an LBR of 125. From our experience limerock does not achieve that high of an LBR. Would crushed concrete or GAB be a suitable substitute?Answer: The use of P-209 Crushed Aggregate Base Course may be used in lieu of P-211 Lime RockBase Course at the Contractor’s discretion at no additional cost. Payment for the use of P-209 in lieu ofP-211 will be made in accordance with the P-211 item. Refer to the attached Specification P-209Crushed Aggregate Base Course.2. Question: Is the referenced project still scheduled to bid March 10 at 1:00 PM? Also, I would like toknow how bidders are being notified of addendums.Answer: The Bid Opening remains Tuesday, March 10, 2026 at 1:00 PM CT as indicated in AddendumNo. 2. All addenda are issued through the City of DeFuniak Springs Requests for Bids, Qualificationsand Proposals website here: https://www.defuniaksprings.net/1230/Bids-RFPs. Addendum No. 4 is thefinal addendum for this project.RFP 2026-01-AP Addendum No. 4 (Final)Date: Friday, March 6, 2026B. PROJECT MANUAL1. Remove the following sections in their entirety, and replace with the same, attached hereto (revisions aredepicted in track changes format for ease of reference):a. 00 01 10 Table of Contents2. Insert the following new sections in their entirety:a. P-209 Crushed Aggregate Base CourseC. DRAWINGS3. NoneBy:Matthew Serynek, PEProject ManagerAttachments:• Project Manualo 00 01 10 Table of Contentso P-209 Crushed Aggregate Base CourseEND OF ADDENDUM NO. 4Garver Project No. 2300226Page 2DeFuniak Springs Municipal Airport (54J)Runway 9-27 Extension00 00 0100 01 1000 01 2000 11 0000 21 0000 22 1300 41 0000 43 1300 43 3600 43 4300 45 1300 45 4600 51 0000 52 0000 55 0000 61 1300 61 1600 65 1600 72 0001 00 00C-100C-102C-105C-110P-101P-151P-152P-154P-209P-211P-403P-602P-603P-608P-610P-620F-162RUNWAY 9-27 EXTENSION00 01 10 TABLE OF CONTENTSCONTRACT DOCUMENTS AND GENERAL REQUIREMENTSBIDDING REQUIREMENTSCERTIFICATIONSTABLE OF CONTENTSCHANGES TO FDOT SPECIFICATIONSADVERTISEMENT FOR BIDSINSTRUCTIONS TO BIDDERSBIDDER’S CHECKLIST OF REQUIRED ITEMSBID FORMBID BONDLIST OF PROPOSED SUBCONTRACTORSWAGE RATESQUALIFICATIONS STATEMENTBIDDER CERTIFICATIONSCONTRACT DOCUMENTSNOTICE OF AWARDCONTRACT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTIONCONTRACTNOTICE TO PROCEEDPERFORMANCE BONDPAYMENT BONDCERTIFICATE OF SUBSTANTIAL COMPLETIONCONDITIONS OF THE CONTRACTFDOT GENERAL PROVISIONSTECHNICAL SPECIFICATIONSCHANGES TO FDOT SPECIFICATIONSCONTRACTOR QUALITY CONTROL PROGRAM (CQCP)TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATIONCONTROLMOBILIZATIONMETHOD OF ESTIMATING PERCENTAGE OF MATERIALWITHIN SPECIFICATION LIMITS (PWL)PREPARATION/REMOVAL OF EXISTING PAVEMENTSCLEARING AND GRUBBINGEXCAVATION, SUBGRADE, AND EMBANKMENTSUBBASE COURSECRUSHED AGGREGATE BASE COURSELIME ROCK BASE COURSEASPHALT MIX SURFACE PAVEMENTEMULSIFIED ASPHALT PRIME COATEMULSIFIED ASPHALT TACK COATEMULSIFIED ASPHALT SEAL COATCONCRETE FOR MISCELLANEOUS STRUCTURESRUNWAY AND TAXIWAY MARKINGCHAIN-LINK FENCEAddendum No. 400 01 10-1Garver Project No. 2300226DeFuniak Springs Municipal Airport (54J)Runway 9-27 ExtensionL-108L-110L-115L-125SS-110SS-120SS-300SS-301SS-305SS-310SS-350UNDERGROUND POWER CABLE FOR AIRPORTSAIRPORT UNDERGROUND ELECTRICAL DUCT BANKS AND CONDUITSELECTRICAL MANHOLES AND JUNCTION STRUCTURESINSTALLATION OF AIRPORT LIGHTING SYSTEMSSUPPLEMENTAL TECHNICAL SPECIFICATIONSSTANDARD SPECIFICATIONSCONSTRUCTION SAFETY AND SECURITYBASIC ELECTRICAL REQUIREMENTSELECTRICAL DEMOLITION WORKDIRECTIONAL BORINGAIRPORT LIGHTING SYSTEMSAUTOMATIC GATE OPERATORSAPPENDICESAPPENDIX A - CONSTRUCTION SAFETY AND PHASING PLANAddendum No. 400 01 10-2Garver Project No. 2300226DeFuniak Springs Municipal Airport (54J)Runway 9-27 ExtensionFDOT Standard Specifications for Construction ofGeneral Aviation AirportsJuly 2019ITEM P-209 CRUSHED AGGREGATE BASE COURSEDESCRIPTION209-1.1 This item consists of a base course composed of crushed aggregate base constructed on aprepared course in accordance with these specifications and in conformity to the dimensions and typicalcross-sections shown on the plans. This item may be used in lieu of P-211 Lime Rock Base Course at theContractor’s discretion.MATERIALS209-2.1 Crushed aggregate base. Crushed aggregate shall consist of clean, sound, durable particles ofcrushed stone, crushed gravel, and shall be free from coatings of clay, silt, organic material, clay lumps orballs or other deleterious materials or coatings. The method used to produce the crushed gravel shall resultin the fractured particles in the finished product as consistent and uniform as practicable. Fine aggregateportion, defined as the portion passing the No. 4 (4.75 mm) sieve shall consist of fines from the coarseaggregate crushing operation. The fine aggregate shall be produced by crushing stone, gravel that meetthe coarse aggregate requirements for wear and soundness. Aggregate base material requirements arelisted in the following table.CRUSHED AGGREGATE BASE MATERIAL REQUIREMENTSMaterial TestRequirementStandardCoarse AggregateResistance to DegradationLoss: 45% maximumASTM C131Soundness of Aggregatesby Use of Sodium Sulfate orMagnesium SulfateLoss after 5 cycles:12% maximum using Sodium sulfate - or -18% maximum using magnesium sulfateASTM C88Percentage of FracturedParticlesMinimum 90% by weight of particles with at least twofractured faces and 98% with at least one fracturedface1ASTM D5821Flat Particles, ElongatedParticles, or Flat andElongated Particles10% maximum, by weight, of flat, elongated, or flatand elongated particles 2ASTM D4791Clay lumps and friableparticlesLess than or equal to 3 percentASTM C142Fine AggregateLiquid limitLess than or equal to 25ASTM D4318Plasticity IndexNot more than five (5)ASTM D43181 The area of each face shall be equal to at least 75% of the smallest mid-sectional area of the piece.When two fractured faces are contiguous, the angle between the planes of fractures shall be at least30 degrees to count as two fractured faces.2 A flat particle is one having a ratio of width to thickness greater than five (5); an elongated particle isone having a ratio of length to width greater than five (5).209-2.2 Gradation requirements. The gradation of the aggregate base material shall meet therequirements of the gradation given in the following table when tested per ASTM C117 and ASTM C136.The gradation shall be well graded from coarse to fine and shall not vary from the lower limit on one sieveto the high limit on an adjacent sieve or vice versa.Addendum No. 4P-209-1Garver Project No. 2300226
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
REQUEST FOR INFORMATION: F-35...
Follow REQUEST FOR INFORMATION: F-35 JPO SAP IT DESTRUCTION Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 7/10/2026
As-Needed Public Works Services
Title As-Needed Public Works Services Solicitation Type Professional Design Services Status Active Buyer
City of Jacksonville
Bid Due: 7/30/2026