Res Hsg Bid Package 18 Canterbury 3.24.26 v2
Project Information
- Bid Title
- Res Hsg Bid Package 18 Canterbury 3.24.26 v2
- Issuing Agency
- City of Milford
- Location
- Connecticut
- Published Date
- Mar 25, 2026
- Closing Date
- Apr 14, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- Res Hsg Bid Package 18 Canterbury 3.24.26 v2
- Attachment Preview
-
INVITATION TO BIDNotice is hereby given that theCity of MilfordDepartment of Economic & Community Developmentwill receive bid(s) for the following project.RESIDENTIAL HOUSING REPAIR PROGRAMProject: Residential Housing Rehabilitation ProjectLocation: 18 Canterbury Lane, Milford CT 06460Date Mandatory Walk-Through: 4/7/2026 @ 11:00 AMDate Bid Due: 4/14/2026 by 4:30 PMPlease do not contact the owner or visit the project prior to the walk-through.Submit Bid packages to: Lauren Kelly, Department of Economic & Community Development,Parsons Center, 70 West River Street, 2nd Floor, Milford, CT 06460Bids will be accepted by mail postmarked on the due dateor emailed by 4:30 PM 3/31/2026 to LKelly@milfordct.govThe project lead tests are available upon request and the Bid Package has been posted on theMilford Purchasing Department webpage under “Current Bids”. on the City websitewww.ci.milford.ct.us The City is not responsible for data or transmission errors.The City reserves the right to reject a bid if is not complete according to the bid instructions.BID INSTRUCTIONSProject Name: Residential Housing Rehabilitation ProjectProject Address: 18 Canterbury Lane, Milford, CT 06460To submit a project bid you must attend the walk-through and sign in. The CDBG Administratorand/or Project Manager will be present to discuss any problems and/or questions you have relating to thisproject. Addendums will be prepared if warranted and posted under “Changes in Bids” on the PurchasingDepartment webpage https://www.ci.milford.ct.us/purchasing-departmentThe City will not accept or consider bids, withdrawals, or amendments received after the date and timespecified. Bids sent by FAX or Email alone are not acceptable and will not be considered. Complete inpen ortyped, no pencil entries accepted. If a complete bid packages is equal in price, quality, and service, thebidder who includes a drug free workplace certification form will be given preference in accordance withMilford's Code of Ordinances, Article V, Division 2.In reviewing the qualifications of a bidder, the City may consider a company’s previous performancerecord and quality of service on contracts for similar work; and the City expressly reserves the right toreject the bid of such bidder if such record discloses that such bidder, in the opinion of the City, has notproperly performed such contracts or has habitually, and without just cause, neglected the payment obills or has otherwise disregarded their obligations as said bidder.The City is exempt from State sales tax and from Federal excise tax - do not include these taxes in yourproposal.Direst questions to Lauren Kelly, Department of Economic & Community DevelopmentLKelly@milfordct.govTo be considered submit a complete Bid Package by Email to Lkelly@milfordct.gov or Mail one (1)original and one (1) copy postmarked on the due date to: City of Milford, Department of Economic &Community Development, Parson’s Government Center, 70 West River Street 2nd floor, Milford CT06460-3317. Ink only.General Conditions - Include the signed General Conditions form with the estimate to certify the contractorwill adhere and comply to Federal, State, local regulations as noted herein.Bid Form: The bid will be accepted with the clear understanding that no revisions can be made to theprice after it is submitted.Certified Lead Paint Renovation Firm – EPA https://cfpub.epa.gov/flpp/searchrrp_firm.htmConnecticut https://portal.ct.gov/DPH/Environmental-Health/Lead-Poisoning-Prevention-Control/EPA-Lead-Renovation-Repair-and-Painting-ProgramContractor License - State of Connecticut Home Improvement Contractor or a Trade BusinessLicense(s).Conflict of Interest - Submit the conflict of interest statement form with the estimate. Disclose whetheranyone associated directly with the company, including a family member or a local official will benefit fromaccepting federal funding to complete the project.Drug Free Workplace Certification This form is optional unless estimates cost are tied. Completed bytypewriter or handwritten in ink – no pencil entries will be accepted.W-9 Finance Department requires a W-9 for tax purposes; include D/B/A.Reference Submit a minimum of one (1) professional reference related to the work specifications.GENERAL CONDITIONSThe Contractor/Vendor agrees to provide the following documentation prior to signing contract andreceiving a purchase order.1. Upon bid award, the Contractor/Vendor will provide a Certificate of Insurance showing minimumcoverage of $100,000/300,000 personal liability and $30,000 property damage, or an amountcommensurate with the project cost, and Workmen Compensation coverage. Subcontractors, ifallowed, must submit a Certificate of Insurance with the same coverage.2. The Contractor/Vendor will file a 100% Performance Bond and a 100% Labor & Materials Bond withPurchasing Department or CDBG Administrator, Department of Economic & CommunityDevelopment, if required.3. The Contractor/Vendor will execute a Notice to Proceed form when provided by the City, signed anddated by both the parties. It will state a mutually convenient date to begin and end the project.4. Contractor/Vendor is required to obtain a registration in the System for Award Management (SAM) toreceive federal funds through HUD CDBG program. all organizations that conduct business with theU.S. Federal government to obtain a Dun and Bradstreet Data Universal (DUNS) number and registerin the System for Award Management (SAM).Assistance is FREE to register in both Dun & Bradstreet and System for Awards Management.Obtain a DUNS number to set up a new or renew a SAM registration. To obtain/search/update aDUNS number go to http://fedgov.dnb.com/webform D&B D-U-N-S Number for US GovernmentContractors or Grantees. For technical difficulties contact govt@dnb.com or (866) 705-5711.5. The successful bidder will comply with the provisions of the Davis- Bacon and Related Acts regardingthe labor requirements for non-residential construction projects or residential contracts over $25,000.Construction activity subject to these provisions will be managed in accordance with the ConstructionContract Provisions of Labor Standard Clauses outlined in Federal Labor Standards Provisions HUD-4010. Adherence to Davis-Bacon Wage Decisions Prevailing Wage Rates in Appendix 1 requiressubmission of a Payroll Summary on DOL Form WH-347 with each payment request.6. The Contractor/Vendor shall employ Abatement and Lead Safe Work Practices (LSWP) licensed and/or certified staff to supervise the project on a daily basis. All work should be performed inconformance with the EPA regulations and HUD Lead-Based Paint Poisoning Prevention Regulations(24 CFR Part 35).7. The construction specifications for this property shall comply with the provisions of Circular HPMS-FHA 4500.5 as it relates to the prohibition of the use of Lead Base Paint. Only paint that conforms tothe American Standards Institute Z66.L (1964).8. Submit Contract and Subcontract Activity HUD form 2516 to make record of sub-contractors hired tocomplete the project. Update list when necessary.9. The Contractor/Vendor will provide the CDBG Administrator/Project Manager with copy(s) of theapplicable local building permit(s) or state permits, if applicable, BEFORE work may commence.10. All work specified shall be performed according to the local building and zoning codes.11. The contractor/bidder shall familiarize himself with all specifications If inadequate or unforeseenconditions are found prior to the bidding the contractor/vendor shall advise the CDBGAdministrator/Project Manager or Owner of condition immediately.12. In case of ambiguities and inconsistencies between sections, greater quantities and better qualityshall take precedence over lesser quantities and qualities.13. The Contractor/Vendor shall guarantee all work performed for a period of 1 year from the date ofcompletion. All material warranties shall be given to the owner.14. The Contractor/Vendor shall provide all material and labor to correct the deficiency. Damage to orfailure of work due to abuse, misuse or other unusual circumstances shall be the responsibility of theContractor to correct.15. All work shall be inspected by the Milford Building Department, if applicable, and/or the ProjectManager.16. All plumbing fixtures shall comply with water regulation codes.17. In addition, requirements of the Local Building and Fire Departments must be adhered to andfollowed as required. It shall be the duty of the contractor to request an inspection from the BuildingDepartment before closing any walls or ceilings.18. Electrical contractors are to use wire mold only in severe circumstances. Before installing wire mold,the contractor must notify the Building Department and the Project Manager, if applicable.19. The Contractor/Vendor shall request use of, at no cost, existing utilities such as electric lights, heat,electrical power and water necessary to carry out and complete the work.20. The Contractor/Vendor shall be responsible for completion of the entire scope of work as specified.Any proposed change order must be authorized by the CDBG Administrator/Project Manager inadvance.21. Contractor/Vendor agrees to provide quality workmanship using standard means and methods, andcomplete work that is fit for inspection and approval, esthetically finished and operational for use.22. There will be no final payment made until electrical, plumbing, and building permits have beenapproved and Building Department inspection approvals have been received by the CDBGAdministrator.In signing this I certify that I have read and agree to the above general conditions and instructions for thespecified project stated in the scope of work.CompanySignatureDateWellner Residence18 Canterbury LaneMilford CT 06460Project # PY50.60843/03/2026SCOPE OF WORKPlease Note:The following information is to be used in conjunction with specifications, project archived photos and pre-bid sitewalk.General:The following is an outline of the Scope of Work. This Scope of Work includes all labor and materials required toperform the construction work as described below. The contractor is responsible for obtaining permits; providingcomplete, thorough, and compliant services to all work; and for coordinating as appropriate with the work of allother trades specified elsewhere. All work must be performed in compliance with all applicable National, State,and Local Codes.Lead Disclosure:This project is funded by the Department of Housing and Urban Development (HUD) andrequires the use of lead safe work practices under 24 CFR Part 35 (Lead Based PaintPoisoning Prevention and Control in Certain Residential Structures). A Lead Inspectionand Risk Assessment may be required for this property.*Please note that all material specifications referenced in the following scope outline are recommendations, andthat approved substitutes may be considered. Additionally, any items or scenarios not specifically mentioned in thisscope outline that may avail themselves during pre-bid walkthrough will be addressed via Addendum.Scope OutlineThe successful bidder shall furnish all labor, materials, tools, equipment, permits, andsupervision necessary to complete the following work:DIVISION 06: WOODS AND PLASTICS (Breezeway)• Remove existing corrugated sheeting material and framing.• Remove existing storm doors and frames.• Clean and prep concrete slab.• Construct stud-wall framing on front (street side) and back (yard side) using pressure treated 2 x 4 lumber(bottom plate) and SPF stud framing (16” O.C.). Framing should include rough framing for front and backdoors.DIVISION 07: THERMAL AND MOISTURE PROTECTION(Roof Scope Includes ALL Structures)• Remove all existing shingles down to the roof deck.• Inspect all decking for worthiness. Include allowance for 10 sheets of 1/," CDX plywood decking in the base bid.Replace as needed.• Provide per sheet pricing for additional decking. (*Note: Additional decking replacement beyond the allowancewill require prior approval and must be submitted as a Change Order.)• Install Owens Corning WeatherLock® ice & water shield at all gutter lines.• Install Owens Corning lnterwrap RhinoRoof® UDL Synthetic Underlayment on all remaining roof sections.• Install Owens Corning Starter Strip Shingles along all gutter lines.• Install Owens Corning TruDefinition® Duration® Limited Lifetime Dimensional Shingles per manufacturerspecifications using 1¼" roofing nails.
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Addendum #1 Questions and Ans...
Addendum #1 Questions and Answers: Tax Exempt Leasing Bid #2026-25
Newtown town
Bid Due: 7/08/2026
City Bid - Partial EIFS Repla...
City Bid - Partial EIFS Replacement - Building Core at the Stamford Center
State Government of Connecticut
Bid Due: 7/09/2026