Oyster Creek Flow Enhancement
Project Information
- Bid Title
- Oyster Creek Flow Enhancement
- Issuing Agency
- Charlotte County
- Location
- Florida
- Published Date
- May 8, 2026
- Closing Date
- May 20, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 26-408
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
File No:
26-408
Description:
Oyster Creek Flow Enhancement
Contact:
Krista.Vigne@CharlotteCountyFl.gov
File number:
20260408
Due Date:5/20/2026 2:00:00 PMNotice:Package:Registered Vendors Notified:Presubmittal Sign-in:Tabulation:Recommendation:Addendum:Commodity Codes:
96888, 98800, 98836, 98875, 98889
- Attachment Preview
-
PURCHASING DIVISIONCharlotte County Administration Center18500 Murdock Circle, Suite 344Port Charlotte, Florida 33948-1094Phone 941.743.1378Fax 941.743.1384TO: PROSPECTIVE BIDDERSDATE: MAY 1, 2026BID OPENING DATE: MAY 20, 2026, AT 2:00 p.m. (EST)RE: ADDENDUM #1, BID NO. 20260408, OYSTER CREEK FLOW ENHANCEMENTBidders are hereby notified that this addendum shall be made a part of the above-named proposal and contract documents.The following is issued to modify, and/or clarify the proposal and contract documents. These items shall have the same force andeffect as the original bid and contract documents, and bids to be submitted on the specified date shall conform with the additions,deletions and revisions as listed herein.ITEM #1QUESTIONS/ANSWERS:Q1: Is the herbicide license to be submitted with the bid?A1: Yes.Q2: Which herbicide licenses are you requiring?A2: Commercial Applicator License from the Florida Department of Agriculture and Consumer Services(FDACS).Q3: Much of the specifications and requirements in this bid are Construction related. Please delineate whichspecifications will be applicable specifically to this project. Are the below items applicable?A3: Please refer to the sections and responses below: Survey: You need to be able to delineate the work zone from the private property. As Builts: Not required. Retainage: Yes, retainage is part of this contract. CPM: A construction schedule is required. MOT: MOT plan is required in the event the Contractor needs to work from the roadway for thesafety of the traveling public. Haul Route: All material is required to be legally disposed of. A haul route to the disposal site isrequired. CPM Schedule: A construction schedule is required. Turbidity & Erosion Control Installation and Reporting: An appropriate plan for turbidity and erosioncontrol during construction is required. Please confirm actual total length of project: This is a per acre contract. The approximate length is5,900 feet. Which of the items in SP-08 will actually be required at the Pre – Construction Conference: Thefollowing will NOT be required at the pre-construction conference, but if the need arises duringconstruction, they will be required at that time. Specifically, if a roadway or structure is damagedby the Contractor and needs to be repaired.a.Source of materialsBID NO. 20260408, ADDENDUM NO. 1b.Concrete mix designc.Asphalt mix designd.Roadway striping detailse.Materials to be used in the correction of elevation of the utilities SP-20: Homeowner notification for the Oyster Creek Subdivision will handled by the HOA. TheContractor should reach out to the resident on the San Casa parcel before accessing theproperty. Contact information will be provided at the pre-construction conference by the County. TS – 03 Staked Silt Fence – The installation of Silt fence will cause more disturbance than the cleaningactivities. There is no earthmoving or soil disturbance:Staked silt fence will only be required if a possible erosion problem is detected due to theconstruction operation where it would help. The onsite County inspector will work with thecontractor on any issues that may arise.This addendum is binding and is to be considered as if contained within the original bid documents of Bid No. 20260408. Biddersare required to acknowledge receipt of this addendum on their bid forms.Kimberly A. Corbett, C.P.M., CPPBSenior Division Manager - PurchasingKAC/kvBID NO. 20260408, ADDENDUM NO. 1
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
ITB; Hurricane Ivan Tree Removal
Description: ITB; Hurricane Ivan Tree Removal Bid Number: PD 04-05.33 Addendum: AD 04-05.33
Escambia County
Bid Due: 4/05/2033
Districtwide Contamination As...
Advertisement Detail Department of Transportation Informational Notice Districtwide Contamination Assessment and Remediation Advertisement
State Government of Florida
Bid Due: 10/11/2040