Request for Proposal – 2025 Urban Water Management Plan
Project Information
- Bid Title
- Request for Proposal – 2025 Urban Water Management Plan
- Issuing Agency
- Port Hueneme city
- Location
- California
- Published Date
- Nov 24, 2025
- Closing Date
- Dec 8, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Request for Proposal – 2025 Urban Water Management Plan
Category: Engineering Status: Open Description: The selected consultant will prepare separate 2025 UWMPs and Water Shortage Contingency Plans for the City of Port Hueneme and PHWA under a single contract. The scope of work includes, but is not limited to:
- Data Collection and Review – Compile and review historical water use, supply, and infrastructure data from PHWA and the City, including water demand from major PHWA customers. Identify gaps or updates needed for planning purposes.
- Demand and Supply Projections – Develop updated 20-year projections for water demand and supply, including retail demands for the City and wholesale demands for PHWA’s customers, considering population growth, land use, and climate variability.
- Supply Reliability and Infrastructure Assessment – Evaluate current and planned water supplies, treatment capacity, and delivery infrastructure to assess system reliability under normal, dry, and multiple-dry-year scenarios.
- Water Shortage Contingency Planning – Prepare contingency plans detailing shortage levels, triggers, water use reduction measures, and emergency response procedures in accordance with state requirements.
- Conservation and Sustainability Strategies – Identify strategies for water conservation, drought management, and climate resilience to support sustainable long-term water management.
- Regulatory Compliance and Documentation – Ensure all plans meet the requirements of the California Urban Water Management Planning Act and related regulations, including proper reporting formats and documentation.
- Coordination and Reporting – Maintain coordination between the City and PHWA to ensure consistency in methodology, assumptions, and data where appropriate. Prepare draft and final reports for each agency.
- Final Presentations – Prepare and deliver presentations for the City Council of Port Hueneme and the PHWA Board of Directors to review the final UWMPs and Water Shortage Contingency Plans, summarizing key findings, recommendations, and planning strategies.
Publication Date/Time: 11/24/2025 2:00 PM Closing Date/Time: 12/8/2025 2:00 PM Contact Person: Dennis Martinez, Water General Manager, via email at: dmartinez@cityofporthueneme.org Special Requirements: Deadline for Receipt of Proposals – Proposals must be received by the City of Port Hueneme no later than 2:00 PM PDT on Monday, December 8, 2025. Submissions should include one original, three (3) hard copies, and one electronic copy (on a USB flash drive). All materials must be submitted in a sealed envelope, with the proposal cost information enclosed separately. The following information must be clearly marked on the outside of the envelope: City of Port Hueneme
Office of the City Clerk
250 N. Ventura Rd
Port Hueneme, CA 93041Request for Proposal – 2025 Urban Water Management Plan
Attn: Dennis Martinez, Water General Manager
Proposer: (Name and Address)
DO NOT OPEN WITH REGULAR MAIL
Miscellaneous: The City may modify this RFP by issuance of one or more written addenda. Addenda will be posted on http://www.ci.port-hueneme.ca.us and the City’s Beacon Bid Website www.beaconbid.com/solicitations/port-hueneme-public-works/open. All proposers must be registered electronically at either of the two websites to receive notification. The City reserves the right to extend the proposal due date. All Questions Must Be Received by 2:00 p.m. December 3, 2025
Proposal Due by 2:00 p.m. December 8, 2025
Anticipated Award of Contract December 15, 2025
Related Documents: - Attachment Preview
-
CITY OF PORT HUENEME250 N. Ventura RoadPort Hueneme, CA 93041ATTN: Dennis MartinezRequest for Proposals forProfessional ServicesThe City of Port Hueneme is soliciting proposals from qualified consulting firms toprovide professional services for the preparation of the 2025 Urban WaterManagement Plans and associated Water Shortage Contingency Plans for the Cityof Port Hueneme and the Port Hueneme Water Agency (PHWA).RFP IssuedAll Questions Must Be Received by 2:00 p.m.Proposal Due by 2:00 p.m.Anticipated Award of ContractNovember 24, 2025December 3, 2025December 8, 2025December 15, 2025City of Port HuenemeRFP Urban Water Management PlanINTRODUCTION AND BACKGROUNDThe City of Port Hueneme (City) and the Port Hueneme Water Agency (PHWA) are seekingproposals from qualified consulting firms to prepare their respective 2025 Urban WaterManagement Plans (UWMPs), including associated Water Shortage Contingency Plans. PHWAis a wholesale water supplier that treats and delivers water to its major customers, including theCity of Port Hueneme, Naval Base Ventura County – Point Mugu, NBVC – Port Hueneme, andthe Channel Islands Community Services District. The City purchases treated water from PHWAand operates the local distribution system to serve retail customers.The UWMPs are required under the California Urban Water Management Planning Act (CaliforniaWater Code §10610 et seq.) and are critical for long-term water supply planning, regulatorycompliance, and sustainable water management. The Water Shortage Contingency Plans willestablish strategies for managing droughts, supply interruptions, and other emergencies toensure reliable service to customers.This joint RFP allows the City and PHWA to coordinate the preparation of two separate UWMPsunder a single contract, ensuring consistency in methodology, data analysis, and reporting whileaddressing each agency’s distinct role—PHWA as the treating wholesaler and the City as theretail distributor. The selected consultant will work closely with both agencies to provide technicalexpertise, ensure regulatory compliance, and support the development of both UWMPs andcontingency plans.OBJECTIVEThe objective of this RFP is to engage a qualified consulting firm to prepare the 2025 UrbanWater Management Plans (UWMPs) and Water Shortage Contingency Plans for the City of PortHueneme and the Port Hueneme Water Agency (PHWA). The UWMPs and contingency planswill ensure compliance with state regulations, provide updated and reliable assessments of waterdemand and supply, and identify strategies for conservation, drought response, and long-termsustainability. The plans will be developed to reflect the distinct roles of PHWA as the treatingwholesaler and the City as the retail distributor while maintaining methodological consistency andcoordination where appropriate. Additionally, the contingency plans will establish procedures formanaging water supply interruptions and emergencies, providing the agencies with technicalsupport and documentation to facilitate informed decision-making by the PHWA Board ofDirectors and the City Council.SCOPE OF WORKThe selected consultant will prepare separate 2025 UWMPs and Water Shortage ContingencyPlans for the City of Port Hueneme and PHWA under a single contract. The scope of workincludes, but is not limited to:1. Data Collection and Review – Compile and review historical water use, supply, andinfrastructure data from PHWA and the City, including water demand from major PHWAcustomers. Identify gaps or updates needed for planning purposes.Page 2 of 8City of Port HuenemeRFP Urban Water Management Plan2. Demand and Supply Projections – Develop updated 20-year projections for waterdemand and supply, including retail demands for the City and wholesale demands forPHWA’s customers, considering population growth, land use, and climate variability.3. Supply Reliability and Infrastructure Assessment – Evaluate current and plannedwater supplies, treatment capacity, and delivery infrastructure to assess system reliabilityunder normal, dry, and multiple-dry-year scenarios.4. Water Shortage Contingency Planning – Prepare contingency plans detailing shortagelevels, triggers, water use reduction measures, and emergency response procedures inaccordance with state requirements.5. Conservation and Sustainability Strategies – Identify strategies for water conservation,drought management, and climate resilience to support sustainable long-term watermanagement.6. Regulatory Compliance and Documentation – Ensure all plans meet the requirementsof the California Urban Water Management Planning Act and related regulations,including proper reporting formats and documentation.7. Coordination and Reporting – Maintain coordination between the City and PHWA toensure consistency in methodology, assumptions, and data where appropriate. Preparedraft and final reports for each agency.8. Final Presentations – Prepare and deliver presentations for the City Council of PortHueneme and the PHWA Board of Directors to review the final UWMPs and WaterShortage Contingency Plans, summarizing key findings, recommendations, and planningstrategies.COST OF PROPOSAL REQUIREMENTSConsultants must provide a detailed cost proposal as part of their submission. The cost proposalmust be submitted in a separate sealed envelope and include a clear breakdown of costs for theCity of Port Hueneme (COPH) and the Port Hueneme Water Agency (PHWA). Costs should beitemized by task and indicate which tasks are associated with each agency (as they will beinvoiced separately) including labor, materials, subconsultant fees, and other direct costs. Thisseparation ensures transparency and allows the City and PHWA to clearly understand theallocation of costs between the two UWMPs and Water Shortage Contingency Plans.SELECTION PROCESS (subject to change)Proposals due no later than 2:00 p.m. Monday, December 8, 2025.Anticipated recommend award of contract to City Council and PHWA Board –Monday, December 15, 2025REQUESTED INFORMATIONAll proposals must provide specific and succinct answers to all questions and requests forinformation listed below. Indirect, imprecise or incomplete responses will not be accepted.Submission of resumes is encouraged, but alone may not be considered responsive to anyspecific questions contained herein.Page 3 of 8City of Port HuenemeRFP Urban Water Management PlanCover Letter: Provide a brief cover letter summarizing the key points of the proposal,including an understanding of the work to be performed and why the firm believes it is thebest qualified to perform the services requested. The letter must be signed by an individualwith authority to bind the proposer and should state that all conditions contained in theattached proposal are valid for a period of at least 90 days.Company and Staff Information: Provide information about the firm, including such itemsas organization and ownership structure, history, experience and credentials todemonstrate the ability of the firm to provide the requested services, and the location of theprincipal office that will be responsible for the implementation of this contract. Provide thenames, titles, experience, qualifications (including certifications) and resumes of thepersonnel who will be assigned to the City, including any subconsultants.Work Plan: Identify the process by which the project will be completed, including: methodsfor gathering public input as may be relevant to the project; gathering information from Citystaff; producing plans and recommendations; timeframe in which to complete the project,etc.Additional Information: Please include any additional information you or your firm feelswould be essential to the proper evaluation of your response to this Request for Proposals.References: Provide a minimum of three (3) references who may be contacted to discusstheir experience working with the firm on similar services. Please provide contact informationincluding the organization, name, title, address, phone, email, services provided and dates.Insurance: Prior to commencement of work, the City of Port Hueneme will require evidenceof appropriate professional liability insurance, errors and omissions insurance, and workers'compensation insurance coverage.NOTE: Such coverage must be provided by an insurance company(ies) licensed to dobusiness in the state of California. Certificates must name the City of Port Hueneme as anAdditional Insured and shall provide that contractor's policy is primary over any insurancecarried by the City of Port Hueneme and that the policy will not be canceled or materiallychanged without thirty (30) days prior notice in writing to the City of Port Hueneme. Thesuccessful firm must agree, if awarded a contract as a result of its proposal, to indemnifyand hold harmless the City of Port Hueneme, its officers, agents and employees from anyand all claims and losses accruing or resulting to persons engaged in the workcontemplated by its proposal, or to persons who may be injured or damaged by a firm or itsagents in the performance of the work. Prior to the commencement of any work, a signedlegal contract will be established for these and other provisions.Compensation: Based on the described work plan, please include in your proposal thetotal cost of services in detail (including all incidentals).Page 4 of 8City of Port HuenemeRFP Urban Water Management PlanGUIDELINESGeneral Information:Deadline for Receipt of Proposals – Proposals must be received by the City of PortHueneme no later than 2:00 PM PDT on Monday, December 8, 2025. Submissions shouldinclude one original, three (3) hard copies, and one electronic copy (on a USB flashdrive). All materials must be submitted in a sealed envelope, with the proposal costinformation enclosed separately. The following information must be clearly marked onthe outside of the envelope:City of Port HuenemeOffice of the City Clerk250 N. Ventura RdPort Hueneme, CA 93041Request for Proposal – 2025 Urban Water Management PlanAttn: Dennis Martinez, Water General ManagerProposer: (Name and Address)DO NOT OPEN WITH REGULAR MAILProposals must be in writing and must contain an original signature by an authorizedofficer of the proposing consulting company. All proposals must be received no laterthan 2:00 PM PDT on December 8, 2025 via U.S. mail, UPS/FedEx/etc., or in person.Proposals cannot be modified or corrected after being opened. Late proposals will not beaccepted for any reason and will be returned unopened, regardless of postmark.Prospective proposers assume the risk of delay in the delivery of the mail by theU.S. Postal Service. FACSIMILE (FAXED) OR EMAILED PROPOSALS WILL NOT BEACCEPTED AND SHALL NOT BE CONSIDERED FOR EVALUATION OR AWARD.Proposals will not be valid until all information has been verified and proposing consultingcompany’s references checked. The completed proposal shall be without interlineations,alterations or erasures. Alternative proposals will not be considered unless requested. Theproposal may be withdrawn upon request by the proposing consulting company withoutprejudice up to, but not after, the time fixed for opening of proposals, provided that therequest to withdraw the proposal is made in writing and is timely filed with the City.Proposals shall be submitted in accordance with the form prescribed by the City of PortHueneme in the requirements and specifications section above. Failure to respond in thismanner may render the proposal non-responsive.Questions Regarding the Scope of Services:All inquiries regarding this Request for Proposals should be directed to Dennis Martinez,Water General Manager, in writing or via email at: dmartinez@cityofporthueneme.org. Noverbal responses will be given. A copy of the inquiry and the response from the City shallbe forwarded to all firms receiving a copy of this Request for Proposals who registered withthe City (per the requirements listed below).Page 5 of 8
- Commodity Codes
-
- NAICS 541330Engineering Services
- NAICS 541611Administrative Management and General Management Consulting Services
- NAICS 541620Environmental Consulting Services
- NAICS 541690Other Scientific and Technical Consulting Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
90907 Water Market Research a...
90907 - 90907 Water Market Research and Analysis Status Stage Amended Posted 6/24/2026
City of Los Angeles
Bid Due: 7/14/2026
90907 Water Market Research a...
90907 - 90907 Water Market Research and Analysis Status Stage Amended Posted 6/22/2026
City of Los Angeles
Bid Due: 7/14/2026