Site Development Plans Reading Pavilion Dalton Whitfield County Public Library
Project Information
- Bid Title
- Site Development Plans Reading Pavilion Dalton Whitfield County Public Library
- Issuing Agency
- Whitfield County
- Location
- Georgia
- Published Date
- Oct 24, 2025
- Closing Date
- Nov 24, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Description Opening Date/Time Closing Date/Time
Site Development Plans
Reading Pavilion Dalton Whitfield County Public Library
October 24, 2025
8:00
AM
November 24, 2025
2:00
PM
- Attachment Preview
-
SITE DEVELOPMENT PLANSFORDALTON LIBRARYCAPPES STREET1. THESE PLANS HAVE BEEN SIGNED AND SEALED FOR REVIEW ONLY. THEY CANNOT BEUSED FOR CONSTRUCTION UNTIL THEY HAVE BEEN APPROVED, STAMPED AND SIGNED BY THEAPPROPRIATE AUTHORITIES AND ALL NECESSARY PERMITS HAVE BEEN OBTAINED BY THECLIENT.2. THE CLIENT IS ULTIMATELY RESPONSIBLE FOR OBTAINING THE APPROPRIATE PERMITS FORCONSTRUCTION FROM ALL FEDERAL, STATE AND LOCAL PERMITTING AUTHORITIES. RICHARDS &ASSOCIATES ENGINEERING, INC. IS NOT LIABLE FOR THE FAILURE OF THE CLIENT TO OBTAINTHE NECESSARY PERMITS.3. THIS DRAWING SHEET IS PART OF A COMPLETE SET OF DESIGN DRAWINGS. IT SHOULDNOT BE SEPARATED FROM THE SET. INFORMATION PERTINENT TO THIS SHEET MAY BE FOUNDON OTHER SHEETS IN THE SET.4. A COPY OF THE CURRENT SET OF APPROVED DRAWINGS MUST BE KEPT ON THECONSTRUCTION SITE AT ALL TIMES.5. THE CLIENT IS RESPONSIBLE FOR ENSURING THAT THE CONTRACTOR HAS A COPY OF THECURRENT SET OF APPROVED DRAWINGS ONSITE AT ALL TIMES.6. IF ANY CONFLICTS, DISCREPANCIES, OR OTHER UNSATISFACTORY CONDITIONS AREDISCOVERED, EITHER ON THE CONSTRUCTION DOCUMENTS OR THE FIELD CONDITIONS, THECONTRACTOR MUST NOTIFY THE ENGINEER IMMEDIATELY, AND SHALL NOT COMMENCEOPERATION UNTIL THE CONFLICTS, DISCREPANCIES, OR OTHER UNSATISFACTORY CONDITIONSARE RESOLVED. RICHARDS & ASSOCIATES ENGINEERING, INC. WILL NOT BE RESPONSIBLE FORCONFLICTS IF WE ARE NOT NOTIFIED PRIOR TO INSTALLATION.7. THESE DRAWINGS HAVE BEEN STAMPED AND SIGNED ENGINEERING DESIGN CONTENT ONLY.PROPERTY LINE INFORMATION SHOWN ON THESE DRAWINGS HAS BEEN PROVIDED BY THECLIENT OR A REGISTERED LAND SURVEYOR AND ARE SHOWN FOR REFERENCE ONLY. THECLIENT MUST ENGAGE THE SERVICES OF A REGISTERED LAND SURVEYOR TO RESEARCH, PLATAND LOCATE ALL PROPERTY CORNERS PRIOR TO THE PURCHASE OF THE PROPERTY ANDCOMMENCEMENT OF CONSTRUCTION. RICHARDS & ASSOCIATES ENGINEERING, INC. IS NOTRESPONSIBLE FOR VERIFYING THE LOCATION OF OR EXISTENCE OF THE LIMITS OR BOUNDARYOF THE CLIENT'S PROPERTY. AT THE CLIENT'S REQUEST, RICHARDS & ASSOCIATESENGINEERING, INC. USES THE INFORMATION PROVIDED BY THE CLIENT, EITHER DIRECTLY ORTHROUGH THE CLIENT'S SURVEYOR, TO PRODUCE CONSTRUCTION DRAWINGS FOR THE CLIENT.THESE DRAWINGS MAY HAVE BEEN PREPARED FOR A SITE NOT CURRENTLY OWNED BY THECLIENT. THE CLIENT IS RESPONSIBLE FOR ENSURING THAT HE HAS THE RIGHT TO OCCUPYTHE PROPERTY FOR THE PURPOSE OF CONSTRUCTION. RICHARDS & ASSOCIATES ENGINEERING,INC. MAKES NO CLAIMS AS TO THE OWNERSHIP OF THE SUBJECT PROPERTY OR ADJACENTPROPERTIES.OWNER/DEVELOPER:NORTHWEST GEORGIAREGIONAL LIBRARY SYSTEM310 CAPPES STREETDALTON, GA 30720PRIMARY PERMITTEE:XXX24 HOUR LOCAL CONTACT RESPONSIBLE FOREROSION, SEDIMENTATION AND POLLUTIONCONTROLS:XXXwww.Georgia811.comKnow what's below.Call before you dig.LOCATED IN LAND LOT 199, DISTRICT 12, SECTION 3CITY OF DALTONPARCEL: 12-199-27-057WHITFIELD COUNTY, GEORGIAN 34.775745°, W 84.977352°SITE AREA: ±2.64 ACRESDISTURBED AREA: ±0.90 ACRESSITEDESIGN PROFESSIONAL'S CERTIFICATION1. I CERTIFY THAT THE PERMITTEE'S EROSION, SEDIMENTATION AND POLLUTIONCONTROL PLAN PROVIDES FOR AN APPROPRIATE AND COMPREHENSIVE SYSTEMOF BEST MANAGEMENT PRACTICES REQUIRED BY THE GEORGIA WATER QUALITYCONTROL ACT AND THE DOCUMENT "MANUAL FOR EROSION AND SEDIMENTCONTROL IN GEORGIA" (MANUAL) PUBLISHED BY THE GEORGIA SOIL ANDWATER CONSERVATION COMMISSION AS OF JANUARY 1 OF THE YEAR IN WHICHTHE LAND-DISTURBING ACTIVITY WAS PERMITTED, PROVIDES FOR THESAMPLING OF THE RECEIVING WATER(S) OR THE SAMPLING OF THE STORMWATER OUTFALLS AND THAT THE DESIGNED SYSTEM OF BEST MANAGEMENTPRACTICES AND SAMPLING METHODS IS EXPECTED TO MEET THEREQUIREMENTS CONTAINED IN THE GENERAL NPDES PERMIT NO. GAR 100001.2. I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS PREPAREDAFTER A SITE VISIT TO THE LOCATIONS DESCRIBED HEREIN BY MYSELF OR MYAUTHORIZED AGENT, UNDER MY SUPERVISION.3. GEORGIA'S 305(b)/303(d) LIST DOCUMENTS HAVE BEEN CONSULTED.GA PROFESSIONAL ENGINEER NO.26730LEVEL II CERTIFIED DESIGNPROFESSIONAL NO. 8688STEPHEN R. RICHARDS, PEGSWCC LEVEL II CERTIFICATION NO. 868810/20/25DATETHIS PROJECT IS DESIGNED TO BE IN COMPLIANCE WITH THE GEORGIA GENERALPERMIT NO. GAR100001 AUTHORIZATION TO DISCHARGE UNDER THE NATIONALPOLLUTANT DISCHARGE ELIMINATION SYSTEM WITH CONSTRUCTION ACTIVITY FORSTAND ALONE CONSTRUCTION PROJECTS EFFECTIVE AUGUST 1, 2018 AND THEMANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA, EFFECTIVEJANUARY 1, 2016.VICINITY MAPNTSSHEET INDEXC0 COVER SHEETC1 INITIAL PHASE SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL PLANC2 INTERMEDIATE A SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL PLANC3 INTERMEDIATE B SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL PLANC4 FINAL PHASE SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL PLANC5 SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL DETAILSC6 SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL DETAILSC7 SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL DETAILSC8 EXISTING CONDITIONS & DEMOLITION PLANC9 SITE PLANC10 GRADING & DRAINAGE PLANC11 CONSTRUCTION DETAILSRAERICHARDS & ASSOCIATES ENGINEERING, INC.CIVIL ENGINEERING + LAND PLANNINGP.O. BOX 220, CHATSWORTH, GA 30705(706) 616-5906C RICHARDS & ASSOC. ENGINEERING, INC.JOB NO. RAE 24-018DATE10/20/25DRAWN BYSRRREVISIONSDRAWING TITLECIVILCOVER SHEETSHEET NO.C0GRAPHIC SCALE300153060( IN FEET )1 inch = 30 ft.EROSION CONTROL LEGENDCdCHECKDAMChCHANNEL STABILIZATIONCh-(type)CoCONSTRUCTIONEXITDiDIVERSION DITCHDiFrRtSd1Sd2Sd3StSuSd4SsBfDs1Ds2Ds3PmDuSTONEFILTER RINGRETROFITTINGSEDIMENTBARRIERINLETSEDIMENT TRAPTEMPORARYSEDIMENT BASINSTORM DRAINOUTLETPROTECTIONSURFACEROUGHENINGTEMPORARYSEDIMENT TRAPEROSION CONTROLMATTINGBUFFERZONEDISTURBED AREASTABILIZATION(WITHMULCHINGONLY)DISTURBED AREASTABILIZATION(WITHTEMPORARYSEEDING)DISTURBED AREASTABILIZATION(WITHPERMANENTVEGETATION)POLYACRYLAMIDEDUST CONTROLRtTYPEStSuSd4SsBfDs1Ds2Ds3PAMDuTOP= 777.3INV= 758.65SSMHHYD24" RCP18" RSCPd2-PSWMHTOP=782.6OUT 768.5IN= 773.5IN= 768.6TOP=776.7OUT= 772.7Sd2-PTOP=779.7OUT= 774.042" RCP785SSMHTOP= 791.0OUT 768.85IN= 769TOP=780.2INV = 775Sd2-P785790WATER VALVE794.67785790 Ds1Ds2DuAPPROX. LOCATION WATER LINESWAUGH STREET 84' R/WSd1-S8" SAN SEWER LINEC-POP790WATER VALVECwCoCOORDINATE EXIT ONTO WAUGH STREETWITH DALTON PUBLIC WORKS DEPARTMENTTOP 802.27IN 796.27OUT 796.17SSMHDs1Ds2Du790790WCwW W APPROX. LOCATION WATER LINESWATER VALVETOP=792.9OUT 775.9Sd2-P795TOP=797.3INV= 790.65Sd2-PFLAGPOLEBOOKRETURNBOXXFFFFRETAINER WALLS795WATER VALVEC.C. FLUMETWO STORY BUILDING36" RCPSd2-PTOP= 781.2INV= 776.818" RCP785FSFd2-PTOP= 782.2INV= 780.1524" RCPSd2-FTOP= 783.3INV= 780.0RIP RAP DITCHXSd1-NSFILTREXX790Sd2-P790Sd1-NSFILTREXXX790Sd1-SC-POP805Cr18' WIDE CONSTRUCTIONDRIVE WITH 6" STONESSMHIN= 805.8OUT 805.7Ds1Ds2DuSd2-F24" RCP18" RCP795Sd1-S795C-POP795SSMHTOP= 800.0OUT 790.25IN= 790.4OVERHEAD POWERCONSTRUCTION SEQUENCE (INITIAL PHASE)1. CALL FOR UTILITY LOCATE PRIOR TO ANY LAND DISTURBINGACTIVITY.2. INSTALL CONSTRUCTION EXIT (Co).3. INSTALL CONCRETE WASHOUT BASIN (Cw).4. INSTALL SILT FENCE (Sd1-NS) AS SHOWN.5. INSTALL INLET PROTECTION AS SHOWN (Sd2-P, Sd2-F).NOTE: AT THE END OF EACH DAY, CONSTRUCT A SAFETY FENCEAROUND ALL SEDIMENT BASINS OR TRAPS, DITCHES, TRENCHES,HOLES, ETC. WITH 2:1 OR STEEPER SLOPES AND A DEPTH GREATERTHAN 24".GA PROFESSIONAL ENGINEER NO.26730LEVEL II CERTIFIED DESIGNPROFESSIONAL NO. 8688JOB NO. RAE 24-018DATE10/20/25DRAWN BYSRRREVISIONSRAERICHARDS & ASSOCIATES ENGINEERING, INC.CIVIL ENGINEERING + LAND PLANNINGP.O. BOX 220, CHATSWORTH, GA 30705(706) 616-5906C RICHARDS & ASSOC. ENGINEERING, INC.DRAWING TITLEINITIAL PHASESOIL EROSIONSEDIMENTATIONAND POLLUTIONCONTROL PLANSHEET NO.C1GRAPHIC SCALE300153060( IN FEET )1 inch = 30 ft.TOP= 777.3INV= 758.65SSMHHYD24" RCP18" RSCPd2-PSWMHTOP=782.6OUT 768.5IN= 773.5IN= 768.6TOP=776.7OUT= 772.7Sd2-PTOP=779.7OUT= 774.042" RCP785SSMHTOP= 791.0OUT 768.85IN= 769TOP=780.2INV = 775Sd2-P785790WATER VALVE794.67785790 Ds1Ds2DuAPPROX. LOCATION WATER LINESWAUGH STREET 84' R/WSd1-S8" SAN SEWER LINEC-POP790WATER VALVECwCoDs1Ds2Du790790WCwW W APPROX. LOCATION WATER LINESWATER VALVETOP=792.9OUT 775.9Sd2-P795TOP=797.3INV= 790.65Sd2-PFLAGPOLEBOOKRETURNBOXCONSTRUCT 6" STONE BASEFOR HEAVY EQUIPMENT PERGEO-PIER CONTRACTOR'SREQUIREMENTWATER VALVEC.C. FLUMEFFFFRETAINER WALLS795TWO STORY BUILDING36" RCPSd2-PTOP= 781.2INV= 776.818" RCP785FSFd2-PTOP= 782.2INV= 780.1524" RCPSd2-FTOP= 783.3INV= 780.0RIP RAP DITCHXSd1-NSFILTREXX790Sd2-P790Sd1-SC-POPSd1-NSFILTREXXXX790COORDINATE EXIT ONTO WAUGH STREETWITH DALTON PUBLIC WORKS DEPARTMENTTOP 802.27IN 796.27OUT 796.17SSMH805Cr18' WIDE CONSTRUCTIONDRIVE WITH 6" STONESSMHIN= 805.8OUT 805.7DISTURBANCELIMITDs1Ds2DuSd2-F24" RCP18" RCPDISTURBANCELIMIT795795Sd1-SC-POP795SSMHTOP= 800.0OUT 790.25IN= 790.4OVERHEAD POWERCONSTRUCTION SEQUENCE (INTERMEDIATE PHASE A)1. MAINTAIN ALL INSTALLED BMP'S. REMOVE SEDIMENT ASREQUIRED.2. BUILD STONE PAD FOR GEO-PIER INSTALLATION.3. MAINTAIN DUST CONTROL AND PLACE TEMPORARY MULCHAND/OR GRASSING AS NEEDED.NOTE: AT THE END OF EACH DAY, CONSTRUCT A SAFETY FENCEAROUND ALL SEDIMENT BASINS OR TRAPS, DITCHES, TRENCHES,HOLES, ETC. WITH 2:1 OR STEEPER SLOPES AND A DEPTH GREATERTHAN 24".GA PROFESSIONAL ENGINEER NO.26730LEVEL II CERTIFIED DESIGNPROFESSIONAL NO. 8688JOB NO. RAE 24-018DATE10/20/25DRAWN BYSRRREVISIONSRAERICHARDS & ASSOCIATES ENGINEERING, INC.CIVIL ENGINEERING + LAND PLANNINGP.O. BOX 220, CHATSWORTH, GA 30705(706) 616-5906C RICHARDS & ASSOC. ENGINEERING, INC.DRAWING TITLEINTERMEDIATE ASOIL EROSIONSEDIMENTATIONAND POLLUTIONCONTROL PLANSHEET NO.C2GRAPHIC SCALE300153060( IN FEET )1 inch = 30 ft.TOP= 777.3INV= 758.65SSMHHYD24" RCP18" RSCPd2-PSWMHTOP=782.6OUT 768.5IN= 773.5IN= 768.6TOP=776.7OUT= 772.7Sd2-PTOP=779.7OUT= 774.042" RCP785SSMHTOP= 791.0OUT 768.85IN= 769TOP=780.2INV = 775Sd2-P785790WATER VALVE794.67Ds1Ds2Du785790APPROX. LOCATION WATER LINESWAUGH STREET 84' R/WSd1-S8" SAN SEWER LINEC-POP790WATER VALVECwCoTOP 802.27IN 796.27OUT 796.17SSMHDs1Ds2Du790790WCwW W APPROX. LOCATION WATER LINESWATER VALVETOP=792.9OUT 775.9Sd2-P795TOP=797.3INV= 790.65Sd2-PFLAGPOLEBOOKRETURNBOXXSd2-FFFFFRETAINER WALLS795WATER VALVEC.C. FLUMETWO STORY BUILDING36" RCPSd2-PTOP= 781.2INV= 776.818" RCP785FSFd2-PTOP= 782.2INV= 780.1524" RCPSd2-FTOP= 783.3INV= 780.0RIP RAP DITCHXSd1-NSFILTREXX790Sd2-P790Sd1-NSFILTREXXSd2-PX790Sd1-SC-POP805Cr18' WIDE CONSTRUCTIONDRIVE WITH 6" STONESSMHIN= 805.8OUT 805.7DISTURBANCELIMITDs1Ds2DuSd2-F24" RCP18" RCPDISTURBANCELIMIT795795Sd1-SC-POP795SSMHTOP= 800.0OUT 790.25IN= 790.4OVERHEAD POWERCONSTRUCTION SEQUENCE (INTERMEDIATE PHASE B)1. MAINTAIN ALL INSTALLED BMP'S. REMOVE SEDIMENT ASREQUIRED.2. INSTALL STORM SEWER.3. CONSTRUCT BUILDING.4. MAINTAIN DUST CONTROL AND PLACE TEMPORARY MULCHAND/OR GRASSING AS NEEDED.NOTE: AT THE END OF EACH DAY, CONSTRUCT A SAFETY FENCEAROUND ALL SEDIMENT BASINS OR TRAPS, DITCHES, TRENCHES,HOLES, ETC. WITH 2:1 OR STEEPER SLOPES AND A DEPTH GREATERTHAN 24".GA PROFESSIONAL ENGINEER NO.26730LEVEL II CERTIFIED DESIGNPROFESSIONAL NO. 8688JOB NO. RAE 24-018DATE10/20/25DRAWN BYSRRREVISIONSRAERICHARDS & ASSOCIATES ENGINEERING, INC.CIVIL ENGINEERING + LAND PLANNINGP.O. BOX 220, CHATSWORTH, GA 30705(706) 616-5906C RICHARDS & ASSOC. ENGINEERING, INC.DRAWING TITLEINTERMEDIATE BSOIL EROSIONSEDIMENTATIONAND POLLUTIONCONTROL PLANSHEET NO.C3GRAPHIC SCALE300153060( IN FEET )1 inch = 30 ft.TOP= 777.3INV= 758.65SSMHHYD24" RCP18" RCPSWMHTOP=782.6OUT 768.5IN= 773.5IN= 768.6TOP=776.7OUT= 772.7TOP=779.7OUT= 774.042" RCP785SSMHTOP= 791.0OUT 768.85IN= 769TOP=780.2INV = 775785790WATER VALVE794.67785Ds3790APPROX. LOCATION WATER LINESWAUGH STREET 84' R/W8" SAN SEWER LINEWATER VALVE790795TOP 802.27IN 796.27OUT 796.17SSMH790790Ds3WW W APPROX. LOCATION WATER LINESWATER VALVETOP=792.9OUT 775.9FFFFRETAINER WALLS795Ds3WATER VALVEC.C. FLUMETWO STORY BUILDING795TOP=797.3INV= 790.65FLAGPOLE36" RCPBOOKRETURNBOXTOP= 781.2INV= 776.818" RCPFFTOP= 782.2INV= 780.1578524" RCPTOP= 783.3INV= 780.0RIP RAP DITCH790Ds324" RCP805SSMHIN= 805.8OUT 805.7DISTURBANCELIMIT18" RCP790DISTURBANCELIMIT795790Ds3795795SSMHTOP= 800.0OUT 790.25IN= 790.4OVERHEAD POWERCONSTRUCTION SEQUENCE (FINAL PHASE)1. MAINTAIN ALL INSTALLED BMP'S. REMOVE SEDIMENT ASREQUIRED. MAINTAIN MONITORING PROGRAM.2. COMPLETE GRADING OPERATIONS AND STABILIZE ALL DISTURBEDAREAS WITH THE APPROPRIATE PERMANENT VEGETATION OROTHER SURFACE TREATMENT. INSTALL MATTING ON ALL PONDSLOPES AND 4" OF STRAW ON ALL OTHER DISTURBED AREAS.3. REMOVE CONCRETE WASHOUT BASIN. STABILIZE THE AREAWITH THE APPROPRIATE PERMANENT VEGETATION.4. ONCE FINAL STABILIZATION HAS BEEN ACHIEVED IN ALL OTHERAREAS, REMOVE PERIMETER SILT FENCE AND CONSTRUCTIONEXITS. STABILIZE THESE AREAS WITH THE APPROPRIATEPERMANENT VEGETATION. BY DEFINITION, FINAL STABILIZATIONMEANS THAT ALL SOIL DISTURBING ACTIVITIES AT THE SITEHAVE BEEN COMPLETED, AND THAT FOR UNPAVED AREAS ANDAREAS NOT COVERED BY PERMANENT STRUCTURES AND AREASLOCATED OUTSIDE THE WASTE DISPOSAL LIMITS OF A LANDFILLCELL THAT HAS BEEN CERTIFIED BY EPD FOR WASTE DISPOSAL,100% OF THE SOIL SURFACE IS UNIFORMLY COVERED INPERMANENT VEGETATION WITH A DENSITY OF 70% OR GREATER,OR LANDSCAPED ACCORDING TO THE PLAN (UNIFORMLYCOVERED WITH LANDSCAPING MATERIALS IN PLANNEDLANDSCAPED AREAS), OR EQUIVALENT PERMANENTSTABILIZATION MEASURES AS DEFINED IN THE MANUAL(EXCLUDING A CROP OF ANNUAL VEGETATION AND SEEDING OFTARGET CROP PERENNIALS APPROPRIATE FOR THE REGION).NOTE: AT THE END OF EACH DAY, CONSTRUCT A SAFETY FENCEAROUND ALL SEDIMENT BASINS OR TRAPS, DITCHES, TRENCHES,HOLES, ETC. WITH 2:1 OR STEEPER SLOPES AND A DEPTH GREATERTHAN 24".ACTIVITY SCHEDULEMONTHS FROM START OF CONSTRUCTION123456CLEARINGFOR BMPsSEDIMENTCONTROLMAINTAINEROSION CONTROLEARTHWORKBUILDINGCONSTRUCTIONTEMPORARYGRASSINGFINAL GRASSLANDSCAPEPAVINGREMOVAL OFTEMPORARY BMPsCONSTRUCTION SCHEDULED TO BEGIN ON XXAND BE COMPLETED ON OR BEFORE XXGA PROFESSIONAL ENGINEER NO.26730LEVEL II CERTIFIED DESIGNPROFESSIONAL NO. 8688JOB NO. RAE 24-018DATE10/20/25DRAWN BYSRRREVISIONSRAERICHARDS & ASSOCIATES ENGINEERING, INC.CIVIL ENGINEERING + LAND PLANNINGP.O. BOX 220, CHATSWORTH, GA 30705(706) 616-5906C RICHARDS & ASSOC. ENGINEERING, INC.DRAWING TITLEFINAL PHASESOIL EROSIONSEDIMENTATIONAND POLLUTIONCONTROL PLANSHEET NO.C4
- Commodity Codes
-
- NAICS 541330Engineering Services
- NAICS 541611Administrative Management and General Management Consulting Services
- NAICS 541990All Other Professional, Scientific, and Technical Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
2026-10 PAVEMENT MANAGEMENT P...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-75050-NONST-2026-000000057
State Government of Georgia
Bid Due: 8/25/2026
2026-10 - PAVEMENT MANAGEMENT...
2026-10 - PAVEMENT MANAGEMENT PROJECT Download Specifications: 2026-10 Paving Management program bid packet.pdf
City of Sandersville
Bid Due: 8/25/2026