DOUBLE WALL INSULATED DUCTING

Project Information

Bid Title
DOUBLE WALL INSULATED DUCTING
Issuing Agency
DEPT OF DEFENSE
Location
Oklahoma
Published Date
Sep 21, 2026
Closing Date
Sep 29, 2026
Government Level
Federal
Status
Closed
Ref. #
W911S226U4509
Original Source
Join to Access Full Details
Set Aside
Total Small Business Set-Aside (FAR 19.5)
Project Description
Follow
DOUBLE WALL INSULATED DUCTING
Active
Contract Opportunity
Notice ID
W911S226U4509
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
AMC
Sub Command
ACC
Sub Command 2
MISSION INSTALLATION CONTRACTING COMMAND
Sub Command 3
419TH CSB
Office
W6QM MICC-FT DRUM
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
  • Original Published Date: Sep 21, 2026 02:25 pm CDT
  • Original Date Offers Due: Sep 29, 2026 10:00 am CDT
  • Inactive Policy: Manual
  • Original Inactive Date: Sep 21, 2027
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 4520 - SPACE AND WATER HEATING EQUIPMENT
  • NAICS Code:
    • 332322 - Sheet Metal Work Manufacturing
  • Place of Performance:
    McAlester Army Ammunition Plant; 1 C-Tree Road, Building 6; McAlester, OK 74501 74501
Description
Salient Characteristics for the Dual-Wall Insulated Aluminum Spiral Duct System: 1. Dual-Wall Spiral Pipe Part Code: 39230 Description: Straight dual-wall, insulated spiral duct pipe. Inside Diameter: 30 inches Outside Diameter: 34 inches Wall Thickness: 0.040 inches for both inner and outer walls. Material: Aluminum. Insulation: 2-inch thick fiberglass with a density of 1.5 lbs/cu. ft. Spacers: Internal I-beam spacers every 8 inches to maintain duct separation. Quantity: 140 feet 2. 90-Degree Elbow Part Code: 3923090 Description: 90-degree bend for the duct system. Construction: 5-piece gored elbow. Inside Diameter: 30 inches Outside Diameter: 34 inches Bend Radius: 45-inch centerline radius. Material: 0.040-inch aluminum. Insulation: 2-inch thick fiberglass with a density of 1.5 lbs/cu. ft. Quantity: 4 3. 45-Degree Elbow Part Code: 3923045 Description: 45-degree bend for the duct system. Construction: 3-piece gored elbow. Inside Diameter: 30 inches Outside Diameter: 34 inches Bend Radius: 45-inch centerline radius. Material: 0.040-inch aluminum. Insulation: 2-inch thick fiberglass with a density of 1.5 lbs/cu. ft. Quantity: 2 4. Reducing Lateral Cross Fitting Part Code: 3012523 Description: A cross-shaped fitting that reduces the main duct size and has two branches. Main Inlet/Outlet: Reduces from 30 inches to 28 inches. Branches: Two 12-inch diameter branches at a 45-degree angle. Material: 0.040-inch aluminum. Quantity: 1 5. Flange System for Main Pipe Part Code: 302406 Description: Connection system (AccuFlange) for joining the 30 x34 dual-wall pipe and elbows. Function: Must be factory-installed on pipe and elbow ends for proper alignment and connection. Material: Aluminum. Quantity: 41 6. Clamp for Connections Part Code: 34241 Description: 34-inch QuickDraw clamp to secure the outer flange connections. Sealing: Must have a built-in self-sealing rubber gasket to ensure an airtight seal. Material: Aluminum. Quantity: 21 7. Flange for 28-inch Port Part Code: 286G Description: 28-inch aluminum flange. Function: Must be factory-installed on the 28-inch outlet of the reducing cross fitting. Quantity: 1 8. Flange for 12-inch Ports Part Code: 126G Description: 12-inch aluminum flange. Function: Must be factory-installed on the two 12-inch branches of the reducing cross fitting. Quantity: 2
Attachments/Links
Contact Information
Contracting Office Address
  • MICC FORT DRUM 4205 PO VALLEY RD
  • FORT DRUM , NY 13602-5220
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Sep 21, 2026 02:25 pm CDTCombined Synopsis/Solicitation (Original)
Commodity Codes
  • FSC 45Plumbing, Heating, and Sanitation Equipment
  • NAICS 332322Sheet Metal Work Manufacturing
Related bids
Sep 22, 2026[Combined Synopsis/Solicitation (Updated)] DOUBLE WALL INSULATED DUCTING
Sep 23, 2026[Combined Synopsis/Solicitation (Updated)] DOUBLE WALL INSULATED DUCTING
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.