RFP: Parking Guidance System Addendum One
Project Information
- Bid Title
- RFP: Parking Guidance System Addendum One
- Issuing Agency
- Birmingham Airport Authority
- Location
- Alabama
- Published Date
- Mar 20, 2026
- Closing Date
- Apr 30, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
RFP: Parking Guidance System Addendum One (03/20/2026)RFP: Parking Guidance System Addendum Attachment (03/20/2026)
- Attachment Preview
-
REQUEST FOR PROPOSALSADDENDUM NUMBER ONE (1)DATE: March 20, 2026PROJECT:RFP Automated Parking Guidance SystemBirmingham-Shuttleworth International AirportBirmingham, AlabamaFrom:Birmingham Airport Authority (BAA)5900 Messer Airport HighwayBirmingham, Alabama 35212To:All ParticipantsGeneral:This addendum will form a part of the RFP and modifies the original Request forProposal (RFP) document. The following changes take precedence over items in theRFP. Portion of the RFP not changed by this Addendum remains in effect. Recipients ofthe Addendum are advised to provide this Addendum to anyone to whom they furtherdistribute without the BAA’s knowledge.Participants in this RFP are required to acknowledge receipt of this Addendum in theirproposal. Failure to do so may subject Proposer for disqualification.ADDITIONAL INFORMATION/CLARIFICATIONS/ATTCHMENTSDESCRIBED BELOW:The BAA includes as an attachment the Minimum Requirements for the parking guidancesystem and the Cost Proposal Spreadsheet.Please note that the Cost Proposal Spreadsheet has three tabs. First Tab labeled based bidand alternate, second tab labeled rooftop project cost, and third tab labeled kiosk cost.We are asking that you send in the cost broken down between the base bid, alternate bid,cost for the rooftop PGS, and a separate cost for the Kiosk using the cost spreadsheetprovided.The due date for proposal submittal has been extended until 2:00 PM CT on April30, 2026.1. Question: While the base specification references a camera-based system and BidAlternate #1 references ultrasonic, would the Authority consider a wireless, in-groundmagnetic sensor–based solution as an alternative?Answer: Affirm, alternate solutions will be considered for non-camera-basedsystems; ultrasonic was an example of a possible alternate.2. Question: Given the parking structure's size and complexity, several moving partsrequire careful coordination. With the site walk on March 12th and the questiondeadline on March 19th, the turnaround time after receiving responses will be quitelimited. This does not provide sufficient time to fully confirm the system design,coordinate with our installer for accurate pricing, and prepare the five required hardcopies for submission and shipping. Would it be possible to grant an extension for theproposal submission deadline? Additional time would help ensure a thorough andaccurate proposal.Answer: The deadline for submittal has been extended. The new due date for bids isApril 30, 2026.3. Question: For the single-space camera sensors, when you state a CCTV feature, arereferring to the ability to watch 30 – 60 second video clips of movement within thatparking space? For example, the video clip of the vehicle parking. Or are you seekinga 24/7 feed from all the camera sensors?Answer: 24/7 feed with 30-day recording/ storage capabilities.4. Will BAA accept a cloud-hosted solution?Answer: No5. Question: With a cloud-hosted solution, a server is still required to keep all thecomputing on the local network and the results are pushed to the cloud. This increasesthe system's performance and speed. Will BAA still want to provide the on-edgeserver if the proposer provides the required specifications?Answer: Cloud hosted solutions will not be accepted6. Question: Will BAA provide the storage server? Or is the proposer required toprovide the storage server?Answer: The Proposer is required to provide.7. Question: Can you confirm they want a 30-day retention period for the LPR imagesand videos?Answer: Yes. 30-day retention is required.8. Question: Can you mark the exact location of the data/communication room insidethe parking structure?Answer: Yes, drawing is provided9. Question: Is there an existing fiber cable from the server location inside the airportbuilding to the data/communication room inside the parking garage that we can use?Or will a new fiber cable need installation? If we must install a new fiber cable, isthere an existing conduit pathway we can use?Answer: Yes, there is single mode fiber that can be utilized.10. Question: Is there a safe and secure storage onsite for the parking system materials?Answer: Affirm, will be discussed with contract award winner11. Question: Can you mark the exact locations of the two roadway signs?Answer: Affirm, drawing is provided12. Question: Is there existing fiber at the two roadway sign locations?Answer: No13. Question: Will BAA accept cellular network for the two roadway signs?Answer: No14. Question: What is the voltage at the existing light posts in the outdoor areas and onthe rooftop?Answer: 480V15. Question: There's an area on the rooftop without light posts (four light posts aremissing). Can you confirm the airport will install new light posts in that area?Otherwise, there is nothing around to mount equipment for occupancy detection forthose spaces.Answer: Yes16. Question: Can you confirm if the oversized vehicle entrance will remain? Should theproposer plan to install a monument sign at this location?Answer: Negative, no signage at the oversized entrance17. Question: Can you confirm that the two main entrances to the parking garage are onlevel 1 and level 3? Is that where BAA wants to install two monument signs?Answer: Affirm. Overhead signage will be on Messer Airport Highway18. Question: At the level 3 entrance, can the proposer remove an existing bollard on thecurb to install the monument sign?Answer: That will be taken into consideration when reviewing the proposed location,but it is possible.19. Question: Can you mark the locations of the areas with the 6' - 2" clearance heightand the 6' - 8" clearance height?Answer: That will be part of the contractors’ surveying efforts.20. Question: Do you prefer to have the Find-Your-Car kiosks in the airport or inside thegarage? If inside the airport is preferred, is there an existing pathway to run fiber?Answer: In the airport – negative, no current pathway21. Question: Proper understands the scope for the digital exit signage, but wants toconfirm the scope of the static vehicle traffic signs found on page 13. Scope states,provide fixed signs that include unchanging traffic patterns such as: no left turn, donot enter, entrance, exit, etc. Does the BAA want the proposer to source and installstatic traffic signs throughout the garage?Answer: Negative; they would need to be integrated with the guidance signage. Theairport would need to approve any proposed signage concepts during the designprocess.22. Question: Proposer would like to add the digital exit sign locations on a set ofdrawings for BAA. Adding drawings may cause the document to exceed the 25-pagelimit. Is BAA open to receiving a longer proposal which includes drawings providingthe proposed digital exit sign locations?Answer: Affirm, that would be approved23. Question: Due to the scope and complexity of the project, we respectfully requestconsideration of a three-week extension to the proposal submission deadline. Thisadditional time would allow our team to perform a more detailed technical and costevaluation so that we can provide a comprehensive and highly competitive proposalthat best supports the project’s objectives.Answer: Approved24. Question: Will the airport be providing the network switches needed in the garage?Answer: No, the Proposer will provide network switches25. Question: Does the Airport have the required size and messaging for the signage onMesser Airport Hwy?Answer: Negative, that would be for the contractor to determine based on theviewing distance needed. Though, the airport would need to approve any proposedsignage concepts during the design process.26. Question: The RFP mentions lighting in the Scope of Services, please elaborate?Will the contractor be required to provide lighting for the project?Answer: Negative, just the lights as they pertain to the guidance system colors foroccupied, open, handicapped, etc. spaces.27. Question: Is performance and payment bonding required?
- Commodity Codes
-
- NAICS 541330Engineering Services
- NAICS 812930Parking Lots and Garages
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
248751 ADT Equipment, VRS Lak...
Sourcing Project Number: SRC0000034421 Solicitation Label: 248751 ADT Equipment, VRS Lakeshore RQ26*361025 Status:
State Government of Alabama
Bid Due: 7/06/2026