Project Description
Number Deadline
SJCDPW-RFP-26-07

Washington Street Improvements (Anteros Avenue to Walker Lane)
•        New curb, gutter and sidewalk on the north and south sides of the street.
•        Reconfigured striping to add buffered bike lanes and parking lanes in each direction.
•        Add ladder-style pedestrian crosswalk markings at Hinkley Ave, Olive Ave, Adelbert Ave, Gertrude Ave, Sinclair Ave, Coolidge Ave, Carroll Ave, Dawes Ave, Wagner Ave, Del Mar Ave, Anthony Ave, and Thelma Ave intersections.
•        Add pedestrian crosswalk striping at the Anteros Ave, Oro Ave, Adrienne Ave, Walker Ave, May Ave, and Walker Ave intersections.
•        Add ADA curb ramps at all intersection corners.
•        Add corner curb extensions (bulb-outs) with ADA curb ramps at each corner of the Oro Ave, Gertrude Ave, Wagner Ave, Adrienne Ave, and Walker Ave intersections.
•        Add a traffic circle at the Carroll Ave intersection.
•        Storm drain pipe and inlet installation, as necessary to complete the storm drainage network
Del Mar Avenue Improvements (Horner Avenue to Washington Street)
•        New curb, gutter, and sidewalk along the east and west sides of the street.
•        Add ADA-compliant curb ramps at intersections, as necessary.
•        Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections.
Horner Avenue Improvements (Del Mar Avenue to Walker Lane)
•        New curb, gutter, and sidewalk along the north side of the street.
•        Add ADA-compliant curb ramps at intersections, as necessary.
•        Walker Lane Improvements (Horner Avenue to Washington Street)
•        New curb, gutter, and sidewalk along the east and west sides of the street.
•        ADA-compliant curb ramps at intersections, as necessary.
•        Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections.

Engineering services estimated duration………………………………………...Twelve (12) months
" data-popup-cssclass="pre-wrap" data-popup-title="Description" style="width:400px; max-width:400px;">The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified consulting firms to undertake, perform, and complete the tasks set forth in Request for Proposals – SJCDPW-RFP-26-07. The selected consulting firm (CONSULTANT) will perform professional and technical engineering services for the Washing Area Complete Streets Project (PROJECT).

CONSULTANT will design and engineer the Washington area neighborhood roadway into a "complete streets" corridor, The PROJECT will include the construction of new sidewalks and buffered bike lanes, as well as enhanced intersections throughout the project area. Improvements will be constructed along Washington Street, Del Mar Avenue, Horner Avenue, and Walker Lane.

Washington Street Improvements (Anteros Avenue to Walker Lane)
•        New curb, gutter and sidewalk on the north and south sides of the street.
•        Reconfigured striping to add buffered bike lanes and parking lanes in each direction.
•        Add ladder-style pedestrian crosswalk markings at Hinkley Ave, Olive Ave, Adelbert Ave, Gertrude Ave, Sinclair Ave, Coolidge Ave, Carroll Ave, Dawes Ave, Wagner Ave, Del Mar Ave, Anthony Ave, and Thelma Ave intersections.
•        Add pedestrian crosswalk striping at the Anteros Ave, Oro Ave, Adrienne Ave, Walker Ave, May Ave, and Walker Ave intersections.
•        Add ADA curb ramps at all intersection corners.
•        Add corner curb extensions (bulb-outs) with ADA curb ramps at each corner of the Oro Ave, Gertrude Ave, Wagner Ave, Adrienne Ave, and Walker Ave intersections.
•        Add a traffic circle at the Carroll Ave intersection.
•        Storm drain pipe and inlet installation, as necessary to complete the storm drainage network
Del Mar Avenue Improvements (Horner Avenue to Washington Street)
•        New curb, gutter, and sidewalk along the east and west sides of the street.
•        Add ADA-compliant curb ramps at intersections, as necessary.
•        Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections.
Horner Avenue Improvements (Del Mar Avenue to Walker Lane)
•        New curb, gutter, and sidewalk along the north side of the street.
•        Add ADA-compliant curb ramps at intersections, as necessary.
•        Walker Lane Improvements (Horner Avenue to Washington Street)
•        New curb, gutter, and sidewalk along the east and west sides of the street.
•        ADA-compliant curb ramps at intersections, as necessary.
•        Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections.

Engineering services estimated duration………………………………………...Twelve (12) months

07/27/2026 11:00 PM UTC
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

RFQ LADWP SIMPLIFIED PURCHASI...

RFQ LADWP SIMPLIFIED PURCHASING PROGRAM (SPP) Status Stage Open Posted 6/1/2026 Bid Due

City of Los Angeles

Bid Due: 6/01/2029

RFQ 10213978 - C-Cure Access ...

Basic Information Title RFQ 10213978 - C-Cure Access Control Systems Agency Department of

State Government of California

Bid Due: 8/24/2026