RFQ 26-008 Fiber Optic IT Annual Contract
Project Information
- Bid Title
- RFQ 26-008 Fiber Optic IT Annual Contract
- Issuing Agency
- New Smyrna Beach Utilities
- Location
- Florida
- Published Date
- Oct 8, 2025
- Closing Date
- Oct 28, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFQ 26-008
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Main
Agency
City of New Smyrna Beach Utilities Commission
Status
Active
Fiscal Year
2026
Title
RFQ 26-008 Fiber Optic IT Annual Contract
Number
RFQ 26-008
Type
Request for Quotation
Department
Procurement
Online Submissions
Yes
Project EstimatePiggyback Solicitation
No
Insurance Required
Yes
Bid Bond Required
No
Bid Bond Amount
Performance Bond Required
No
Performance Bond Amount
Construction Bond Required
No
Construction Bond Amount
Scope of Services
PRIMARY:
Provide Unit Costs for certain fiber related maintenance, installation, connections, conduit construction and repair, and fiber testing, as listed in the quote tabulation(s) below. This project area will fall within the NSBU’s service area (Map of Fiber System will be made available to successful contractor). The Base Quote Tabulation – Construction Related Improvement will be comprised of scheduled system improvements to conduit, pull boxes and as otherwise listed below. The Alternate Quote Tabulation will be fiber specific connections, testing, and other technical items. The awarded Vendor will be issued an Open Purchase Order by the COMMISSION for work throughout the year as deemed necessary by the COMMISSION. The amount of the award shall not exceed $70,000.00. The quote award may be split between two VENDORS. The term of the award shall be one year. New Smyrna Beach Utilities reserves the right to extend this contract up to three (3) additional one (1) year periods based upon mutual agreement. Monthly/Annual Inspection Services Maintenance Agreement Details: NSBU Has approximately 81,500ft of fiber and Approximately 90 Pull boxes throughout our system
• Monthly Inspections – Visual Inspections
• Check for Tree & vegetation Overgrowth
• Pole Attachment Verification
• ID & Recommend of Pole transfers on new pole sets
• Pole Riser Integrity Inspection
• Verify Height of Cable Slack & Sag
• Check Handhole & Lid Integrity
• Verify Marker Posts are Standing Where Applicable
• Write up report of and visible damages and recommendations to prevent further damage Yearly Inspection Details:
• Includes all items from Monthly Inspections
• Perform Optical Time Domain Reflectometer (OTDR) testing on all dark optical fibers to check for damages
• Inspection of FTP panels to include optical termination and housing inspection
• Inspect all Splice Cases – Aerial & Underground – to check for damage
• Report for any issues found and recommended corrections for the issues Contractor to provide a Detailed Maintenance Pricing Rates schedule with their RFQ Submittal. This pricing schedule should cover everything from Hourly rates of Personnel & Equipment along with detailed Scheduled work rates.
Written quotations must be provided for all work identified as an issue or repairs that need to be made. UCNSB would need to approve the quotation prior to Contractor proceeding with recommended repairs.
VENDOR shall provide insurance, materials, tools, labor, equipment, and supervision to perform all work necessary to complete this scope of work. VENDOR shall submit warranties and a committed response time in days with quote submittal.
Dates(All times are listed as EST )
Broadcast Date
10/8/2025 8:00 AM EST
Question End DateDue Date
10/28/2025 2:30 PM EST
Bid Opening Date
Pre-Bid Meetings
Total: 0 (All times are listed as EST )
Date Time Mandatory Location Shortlist Meeting
Total: 0 (All times are listed as EST )
Date Time Location Documents
Quote/Bid
Quote/Bid Items
Additional Quote/Bid Items FieldsTotal: 33# Required Group Make Model Description Quantity Unit of Measure Price/ Percent Type 1 Replace damaged riser guard or install new riser guard 1 LS Price Service 2 Install or Replace Marker Posts 1 EA Price Service 3 Uncover hand holes or pull boxes (grass, dirt, other materials 1 EA Price Service 4 Replace Pull Boxes 1 EA Price Service 5 Install New Pull Boxes 1 EA Price Service 6 Replace Pull Box Lids 1 EA Price Service 7 Adjust grade of Pull Boxes 1 EA Price Service 8 Locate Overgrown or Missing Pull Boxes 1 EA Price Service 9 Install 2" Conduit 100 FT Price Service 10 Replace or Install Pole Mounting Hardware 1 EA Price Service 11 Maintenance of Traffic 1 LS Price Service 12 Mobilization and Demobilization 1 LS Price Service 13 Emergency Mobilization and Demobilization 1 LS Price Service 14 Install OH 72 Count Fiber as a repair 1 LF Price Service 15 Install OH 24 Count Fiber as a repair 1 LF Price Service 16 Install UG 72 Count Fiber as a repair 1 LF Price Service 17 Install UG 24 Count Fiber as a repair 1 LF Price Service 18 Alternate Quote 0 Price Service 19 Furnish and Install 72 Port Patch Panel and Splice Tray 1 EA Price Service 20 Furnish and Install 24 Port Patch Panel and Splice Tray 1 EA Price Service 21 OTDR Test Fiber upon arrival to job site 1 EA Price Service 22 Disconnect & Temporarily hang Aerial fiber 1 EA Price Service 23 Furnish and Install Slack Loops 1 EA Price Service 24 Attach 72 Count Fiber 1 EA Price Service 25 Final Fiber Cable (OTDR) Test 1 EA Price Service 26 Provide and Install Wall Mount Rack Enclosure 1 EA Price Service 27 Furnish and Install Fiber Optic Pigtails 1 EA Price Service 28 Terminate pigtails into Patch Panel 100 LS Price Service 29 Install OH 72 Count Fiber 1 LF Price Service 30 Install UG 72 Count Fiber 1 LF Price Service 31 Install Pole Mounting Hardware 1 LS Price Service 32 Monthly Inspection 11 EA Price Service 33 Annual Inspection 1 EA Price Service
Delivery Date
None
Required Files to be Uploaded by the Vendor
RF Quote Documentation
Shipping
None
Terms and Conditions
See attached Terms and Conditions
Include Shipping in Price of Items
No
Display Bid Tabulation to Vendors
NoDisplay Vendor Submissions to Vendors
No
View Vendor Submissions while Bid Solicitation is Active
No
Allow Options File to be Updated after Due Date
No
Allow Post Due Date Submission
No
Questions & Answers
Total: 0Question Date Asked Answer Date Answered Commodity Codes
Total: 2
Code Description [962-18] Cable Construction, Installation and Maintenance (Fiber Optic, Communication, Computer, etc.) [838-29] Cable, Fiber Optic w/Interconnecting Components and Accessories (See Class 280 for Other Communications Cable Publications
Total: 0
Publication Date - Commodity Codes
-
- NAICS 237130Power and Communication Line and Related Structures Construction
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RPQ FIBER OPTIC CABLE, PURCHA...
Description: RPQ FIBER OPTIC CABLE, PURCHASE AND DELIVERY, TERM CONTRACT Department: Purchasing Buyer:
Palm Beach County
Bid Due: 3/21/2029
Project ID: Title: Annual Fiber Optic Cabling Addenda: 1 Release Date: 6/3/2026 Due
Alachua County
Bid Due: 7/22/2026