WASTEWATER TREATMENT PLANTSECONDARY CLARIFIER REPAIRS
Project Information
- Bid Title
- WASTEWATER TREATMENT PLANTSECONDARY CLARIFIER REPAIRS
- Issuing Agency
- City of Manchester
- Location
- New Hampshire
- Published Date
- Mar 13, 2026
- Closing Date
- Apr 9, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- FY26-270-39
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid # Description Download PDF Bid Opening Addenda Results FY26-270-39 EPD: General Contractor Qualification Statements
Questions: Underwood Engineers, Inc. Steve Smith : 603-230-9898 or via email: ssmith@underwoodengineers.com
Qualifications Due: April 9, 2026 by 4:00 PM to Underwood Engineers - Attachment Preview
-
Timothy J. CloughertyPublic Works DirectorOwen P. Friend-Gray, P.E.Deputy Public Works DirectorRobert J. Robinson, P.E.Chief Sanitation EngineerCITY OF MANCHESTERDepartment of Public WorksEnvironmental Protection DivisionCommissionKathleen Sullivan, ChairArthur Gatzoulis, Co-ChairMark MacKenzieAmber Nicole CannanAndre ParentINVITATION FOR PREQUALIFICATION OF GENERAL CONTRACTORSWASTEWATER TREATMENT PLANTSECONDARY CLARIFIER REPAIRSThe City of Manchester owns and operates a wastewater treatment plant (WWTP) that is a 34 MGDactivated sludge process. The WWTP treats an average of 24 million gallons per day and was originallyconstructed in 1976 with major upgrades in 1993 and 2016. The WWTP has three (3) secondary clarifiers.Two of the clarifiers are original equipment from 1976 and the third is from a large facility upgrade in1991. All three secondary clarifiers were upgraded in 2010. The clarifiers, after 16 years in service, haveexperienced failures of the carbon steel fasteners, hardware and structural members that need replacement.The Clarifier #2 48-inch influent slide gate has failed and cannot be operated and needs to be replaced. Theother two influent clarifier gates will also be replaced under this project. Also, the secondary clarifier 48-inch crossover pipe has no means of isolation and the City wishes for new fabricated steel plates to beinstalled at either end to block the pipe off. All of the work associated with the slide gate replacements andblocking off the crossover pipe will require significant bypass pumping effort to maintain continuous flowthrough the plant. Lastly the City also requires the plant water system isolation 14-inch plug valves to bereplaced. The estimated construction cost of this work is $2.75 million and construction duration is 300calendar days.PREQUALIFICATIONGeneral contractors with extensive experience in wastewater and/or water treatment projects of a similarsize and scope are invited to submit prequalification packages for bidding on the City of Manchester’sWastewater Treatment Plant Secondary Clarifier Repairs Project. Questions should be directed to theCity’s engineer Underwood Engineers, Inc. care of Steve Smith at (603) 230-9898 orssmith@underwoodengineers.com. Sealed Prequalification Statements will be received at the UnderwoodEngineers Concord office until 4:00 PM EST on Thursday, April 9, 2026. Prequalification statementsshall be addressed as follows: Prequalification Statement, Attn: Steve Smith, Underwood Engineers, Inc.,99 North State Street, Concord, New Hampshire 03301.ONLY PREQUALIFIED FIRMS WILL BE ALLOWED TO BID. Project will bid in April 2026 with abid opening in May 2026, and a Notice to Proceed issued for work to begin in August 2026. The right isreserved to waive any informalities in or reject any or all prequalifying Contractors and to acceptprequalified Contractors that are deemed most favorable to the interest of the City of Manchester.City of Manchester, NHDepartment of Public WorksEnvironmental Protection Division300 Winston Street, Manchester, NH 03103(603) 624-6341300 Winston Street • Manchester, New Hampshire 03103 • (603) 624-6595 • FAX: (603) 628-6234E-mail: EPD@manchesternh.gov • Website: www.manchesternh.gov
- Commodity Codes
-
- NAICS 221320Sewage Treatment Facilities
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Z2DB--Pharmacy Hood and Cache...
Follow Z2DB--Pharmacy Hood and Cache Upgrade Active Contract Opportunity Notice ID 36C24126Q0525 Related
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/15/2026
Sale of City Real Estate H000...
number title due date Executive B27003 Sale of City Real Estate H0002-000000 275
City of Dover
Bid Due: 7/15/2026