Jordan Hughes
Project Information
- Bid Title
- Jordan Hughes
- Issuing Agency
- Commonwealth of Massachusetts
- Location
- Massachusetts
- Published Date
- Jun 2, 2026
- Closing Date
- Jun 22, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- BD-25-1502-FHA00-01-130096
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Header Information Bid Number:
BD-25-1502-FHA00-01-130096
Description:
Jordan Hughes
Bid Opening Date:
06/22/2026 02:00:00 PM
Purchaser:
Jordan Hughes
Organization:
Fitchburg Housing Authority
Department:
FHA001 - Executive Office
Location:
01 - Executive Office
Fiscal Year:
25
Type Code:
SS
Allow Electronic Quote: Yes
Alternate Id:
Required Date: Available Date
:
06/02/2026 08:29:54 AM Info Contact: Bid Type:
OPEN
Informal Bid Flag:
NoPurchase Method:
Open Market
Pre Bid Conference: Bulletin Desc:
The FITCHBURG HOUSING AUTHORITY, the Awarding Authority, invites sealed bids
from Contractors for the Emergency Structural Repairs 2 at State Aided Development:
Canton Valley (705-2, previously 667-1) in Fitchburg, Massachusetts, in accordance
with the documents prepared by PARE CORPORATION.
Ship-to Address:
Cameron Davis
50 Day Street, Ste#1
Fitchburg, MA 01420
US
Email: cdavis@fitchburgha.org
Phone: (978) 540-4039
Bill-to Address:
Accounts Payable
Fitchburg Housing Authority
50 Day Street, Ste#1
Fitchburg, MA 01420
US
Email: AP@fitchburgha.org
Phone: (774) 519-5573
Print Format:
Bid Print
Required Quote Attachments Desired Attachment Name Description Item Information
Item # 1:
The Project consists of but not limited to:
This project applies to all eight buildings within the development. 23 units are included in
the base scope. Within the units identified, the finish floor is to be replaced. In the
process of replacing the finish floor, the underlayment will be removed as needed to
receive the new flooring and expose any underlying structural deficiencies. The primary
cause of these deficiencies have been identified as water and termite damage in certain
units. Where damage is most severe, this includes replacement of the subfloor planking
and sistering of the joists which have been compromised. The objective is to achieve the
required flatness and an improved level condition for each floor. Where this cannot be
achieved by replacement of the underlayment alone, cementitious self-leveling
underlayment will be required. Scope includes limited wall finishing where framing was
exposed during the structural investigation. Some timber beams accessible through the
crawlspaces have been identified to receive epoxy repair for checking. Wood blocking
under an interior door jamb is included to mitigate defects in the original construction.
Scope includes abatement of any 9"x9" asphalt tiles containing asbestos.
Qty Unit Cost UOM Total Discount Amt. Total Cost This item is narrative
Item # 2:
(
72-13
-
00
)
The Project consists of but not limited to:
This project applies to all eight buildings within the development. 23 units are included in
the base scope. Within the units identified, the finish floor is to be replaced. In the
process of replacing the finish floor, the underlayment will be removed as needed to
receive the new flooring and expose any underlying structural deficiencies. The primary
cause of these deficiencies have been identified as water and termite damage in certain
units. Where damage is most severe, this includes replacement of the subfloor planking
and sistering of the joists which have been compromised. The objective is to achieve the
required flatness and an improved level condition for each floor. Where this cannot be
achieved by replacement of the underlayment alone, cementitious self-leveling
underlayment will be required. Scope includes limited wall finishing where framing was
exposed during the structural investigation. Some timber beams accessible through the
crawlspaces have been identified to receive epoxy repair for checking. Wood blocking
under an interior door jamb is included to mitigate defects in the original construction.
Scope includes abatement of any 9"x9" asphalt tiles containing asbestos.
U N S P S C Code:
72-13-00
General building constructionQty Unit Cost UOM Total Discount Amt. Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RFR 243128 DPH Honorarium Spe...
Bid Solicitation: BD-23-1031-ADMIN-ADM07-86598 Responses Due in 1914 Days, 3 Hours, 7 Minutes Header
Commonwealth of Massachusetts
Bid Due: 6/30/2028
M7 and M8 Hynes Escalators (U04)
Title Detail Important Dates Posted Date Plan Holders M7 and M8 Hynes Escalators
Massachusetts Convention Center Authority
Bid Due: 7/29/2026