HQ Parking Lot Improvements
Project Information
- Bid Title
- HQ Parking Lot Improvements
- Issuing Agency
- Costa Mesa Sanitary District
- Location
- California
- Published Date
- Mar 16, 2026
- Closing Date
- May 7, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Notice Inviting Bids/Request For Proposal Bid Status Bid Tabulation Awardee HQ Parking Lot Improvements
Status: Open
Due: May 7, 2026 by 10:00 a.m. - Attachment Preview
-
REQUEST FOR PROPOSALByForParking, Landscape, Lighting, & ADA ImprovementsforHeadquarters Parking LotRFP Issued: March 16, 2026Proposal Submission Deadline: May 7, 2026 at 10:00 a.m.Costa Mesa Sanitary District290 Paularino AveCosta Mesa, CA 92626P a g e |2INTRODUCTIONThe Costa Mesa Sanitary District (hereinafter referred to as “The District”) is soliciting proposals fromqualified civil engineering firms, or team of firms to provide general civil, landscaping, lighting,electrical, and ADA improvement design services for the development of plans and specifications forthe parking lot area of District Headquarters, located at 290 Paularino Avenue.DISTRICT HISTORYThe District is an independent special district that was formed in 1944 under the Sanitary District Actof 1923. It is governed by an elected five-member Board of Directors that appoints a general managerto supervise the day-to-day operations of the organization. The District’s boundaries encompass allof theCity of Costa Mesa, portions of Newport Beach, and unincorporated Orange County; serving apopulation of approximately 118,300 and serving close to 4,000 businesses.The District is NOT part of the City of Costa Mesa. The District is a separate legal entity.The District is responsible for residential trash collection, as well as wastewater collection throughoutits service area. As part of the wastewater system, the District manages 224 miles of collectionpipelines and 20 pump stations used to transmit wastewater to the Orange County Sanitation Districtfor treatment and recycling.The District utilizes a combination of public and private services to operate. The private servicesinclude a trash hauler, an attorney, a treasurer, IT support, and the Fats, Oil and Grease (FOG) ControlProgram. The public services include 25 District employees.PURPOSEThe District is seeking proposals from qualified civil engineering firms, or teams, to provide civil,landscape, lighting, electrical, and ADA improvement design services as outlined in the “Scope ofService” below. There is approximately $50,000 in the budget to perform the Scope of Service.The District would like the landscaping to be inviting and welcoming for the public and portray aclean, well-maintained, park-like area for viewing.SCOPE OF SERVICEThe Consultant or Consultant Team (firm/firms) shall provide the detailed scope of service:1. Preliminary Design and Design ServicesConduct study of alternatives, minimum three (3) alternative designs, with order ofmagnitude cost estimate(s) for each alternative design selection, preliminary design, anddesign services for the Headquarters (HQ) parking area. The work will generally consist ofreplacing and/or rehabilitating the parking lot, landscaping improvements that tie into theexisting landscaping, ADA improvements for code compliance, lighting, and electricalimprovements. The proposed work will also include the design of backup building battery(ies)based on the building battery backup study, drainage, storm water, and sustainabilityimprovements.P a g e |3Preliminary Design generally consists of gathering any existing information, interviewing staff,obtaining utility drawings (Edison, Gas Co., Mesa Water District, Storm Drain, public utilities),confirming project goals and project requirements, obtaining City design and developmentstandards & requirements, obtain City plant and/or landscaping palette(s), and developing upto three project alternatives. Provide technical memorandum regarding:• ADA improvements and requirements• Parking requirements and layout(s)• Landscaping and irrigation.• Storm water layoutsEV Charging Rebate ProgramResearch rebate opportunities for constructing and installing Level III dual-port fastcharging stations. Provide a letter-report to the District with determination andrecommendations.Design for the selected alternative. Provide 60% and 90% completed drawings set for reviewby the District. Incorporate 60 % and 90% suggestions and review comments into the finalproduct. Conduct one presentation to the District Citizens Advisory Committee and reviewreceived comments with District staff. Incorporate District Engineer approved CACcomments.Final Design: Provide 100% drawings, construction details, specification and bidding packagefor bidding. Provide at minimum:• Title Sheet• Vicinity map, location map, sheet index, and list of public agencies.• Construction Notes• Demolition drawing• Grading, Site Plan, and Drainage• Electrical Drawing(s)• Landscaping/Planting drawing(s)• Hardscape drawing(s)• Irrigation/control drawing• Utility drawing (may be included on Site Plan)• Detail Sheet(s)Provide an initial engineers estimate with the 90% submittal and a final engineers estimatewith the 100-percent submittal.The detailed scope of work (SOW) includes, but is not limited to:B. Pedestrian WalkwayDesign an ADA accessible pedestrian walkway from the public right-of-way to District frontentrance. The District may decide not to proceed with installing the ADA walkway. However,all utilities, irrigation, and/or electrical utilities shall be designed and installed such that thefuture walkway may be placed at a later date, without relocating utilities or piping. Adegraded granite path will be used to reserve the walkway location.P a g e |4C. ADA EntranceDesign an ADA access ramp and front entrance modifications. Remove the existing, ADA non-complaint front entrance and provide compliant ADA access facilities. The existing flagpolewill be replaced and relocated out of the walkway. Provide flagpole lighting.D. Electrical ImprovementsDesign general electrical, lighting, low-voltage, and back-up battery improvements. Abackup battery study has been commissioned, and the concepts and/or study results will beavailable for the Consultants use.E. Electric Vehicle (“EV”) Charging StationsDesign four (4) electric charging stations: two (2) Level II for District use and two (2) Level IIIdual-port fast charging stations for public use. Public stations must be designed to acceptpayment by customers wishing to charge vehicles.F. Repave and Stripe Parking LotRemove and replace asphalt. Consultant must provide a recommended pavement sectionalong with storm drainage capture and/or treatment systems. The goal is also to provideadditional parking stalls (possibly one or two), an employee outdoor lunch space, securityfence for the new lunch area and District employee and district vehicle parking.G. Security Fencing and GateDesign Security fencing and motor-operated gate.H. Remove Existing Landscape and Irrigation SystemRemove and rejuvenate the existing landscape within the parking area and building front(northwesterly side of the HQ building). Rehabilitated and replaced landscaping, irrigation,must integrate into the existing utility system(s). Provide a plan(s) for the selectedlandscaping alternative.2. Bidding ServicesA. Bidding Documents: Prepare and complete bidding package for the District to advertise andbid. The bidding package generally consists of, but not limited to, Plans, Specifications,General Conditions, Agreements, among other required items.B. Bidding Services: Attend Prebid meeting, assist with developing response(s) to contractorquestions and preparation of addendums, modify contract, project, specifications, and othertechnical documents based on pre-bidding questions and required addendums.C. Review for Responsive Bidder: Review bids for responsiveness, check references, contractorlicense, among other Bid-summitted documentation.3. Construction Management and Administration ServicesA. Provide Construction administration generally consists of reviewing shop drawings, responding toContractor requests for information, preparing change order paperwork and justification, constructionmeeting(s), among other administrating assistance.P a g e |5B. Periodic job walk(s) throughout the project and meeting the District Engineer to review constructionconflicts, unknown situations, and develop solutions. In addition, the Consultant shall coordinatemeetings and activities with the District Engineer.C. Provide record drawing/as-built recordsD. Provide complete set of project documentation:a. AutoCADD drawingsb. Microsoft file(s)c. Other Native software files used during the projectd. Set of PDF filese. Two Hard Copy Sets4. MeetingsA. Attend one kick-off meeting with staff to solicit their input on the conceptual plans.B. Attend one meeting with 60% design meeting with staff to review project alternatives and confirmproceeding to design phase.C. Attend a second meeting with the District Engineer to review the 90% design workproduct.D. Attend one meeting with the District’s Citizens Advisory Committee (CAC) meeting tosolicit input on the conceptual plans.E. Attend one Board of Directors study session meeting to solicit input on the conceptualplans.F. Attend one meeting with staff to finalize designs prior to bidding on the project.G. Attend Prebid Meeting with contractors.H. Construction Meeting(s): Kick-off and monthly construction meeting(s),
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Southeast Water Pollution Con...
Bid Details RFP for DB-140 Southeast Water Pollution Control Plant - Secondary Clarifiers
San Francisco Public Utilities Commission
Bid Due: 8/05/2026
Project: TEC Modernization Addition Ref. #: 2026-1683 Type: ITB Status: Open Open Date:
Alameda-Contra Costa Transit District
Bid Due: 7/21/2026