Pre-qualification: State Route 85 Noise Reduction (Phase 2) Project
Project Information
- Bid Title
- Pre-qualification: State Route 85 Noise Reduction (Phase 2) Project
- Issuing Agency
- Santa Clara Valley Transportation Authority
- Location
- California
- Published Date
- Oct 8, 2024
- Closing Date
- Nov 5, 2024
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- C24218
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID: C24218
Title: Pre-qualification: State Route 85 Noise Reduction (Phase 2) Project
Addenda: 0
Release Date: 10/8/2024
Due Date: 11/5/2024
OverviewPost InformationPosted At:Tue, Oct 8, 2024 8:00 AMSealed Bid Process:NoPrivate Bid:NoSummaryThe SR 85 freeway was constructed in two different eras: the northern portion of the corridor was constructed
in the 1960s (north of I-280) and the southern portion of the corridor was constructed in the early 1990s
(south of I-280). Per the Santa Clara County Ordinance, Sec. B17-5.4, trucks were banned on SR 85 south of I-
280 when the newer southern portion of the corridor was opened to traffic to eliminate the additional noise
that truck traffic would generate. However, as traffic volumes have continued to increase on SR 85, noise
levels have increased too, and adjacent communities have requested better noise abatement. Caltrans has
developed new acoustic measurement techniques and studied options to better reduce noise levels.BackgroundIn 2006, VTA completed a high precision diamond grinding and grooving project on SR 85 between SR 87 and
I-280 (after the public responded favorably to a 0.88-mile test section), to conduct tire/pavement interface
noise evaluations that compared existing longitudinal tined surfaces to the new diamond ground and grooved
textured surfaces. The goal of the project was to remove the roadway’s existing longitudinal tining that was
generating noise levels that were greater than desired.
To address current traffic noise concerns along SR 85, VTA is working with Caltrans and cities along the SR 85
corridor to study, analyze, and implement noise reduction treatments through a three-phase Noise Reduction
Program. Phase 1 was the initial study phase that recommendeded the specific treatments to reduce the
amount of noise generated and identified five demonstation locations to construct the additional noise
reduction measures. This Phase 2 Project, the demonstration phase, consist of constructing the noise
reduction measures at the five demonstration locations and completing a before and after noise level study
to determine how much of a reduction was achieved and the cost to achieve that level of noise reduction. A
potential future Phase 3 project would be the construction of these same noise reduction measures on
significantly longer segements of SR 85 and possibly even corridor wide. These three phases make up the
entire State Route 85 Noise Reduction Program.TimelinePre-Qual Publication Date:October 8, 2024Question Submission Deadline:November 5, 2024, 2:00pmApplication Submission Deadline:November 5, 2024, 5:00pm - Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 541330Engineering Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
146217 Santa Ynez PS & Astori...
146217 - 146217 Santa Ynez PS & Astoria PS- Disconnect Switch Status Stage
City of Los Angeles
Bid Due: 7/09/2026
RODENT BAIT STATIONS SERVICES...
Project ID: Title: RODENT BAIT STATIONS SERVICES FOR ANAHEIM RESORT DISTRICT Addenda: 0
City of Anaheim
Bid Due: 7/22/2026