IFB No. 25-37 - GSC SEH Pueblo Office Renovation Addendum No. 4 - Q&As
Project Information
- Bid Title
- IFB No. 25-37 - GSC SEH Pueblo Office Renovation Addendum No. 4 - Q&As
- Issuing Agency
- Pueblo County
- Location
- Colorado
- Published Date
- Nov 26, 2025
- Closing Date
- Dec 4, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- IFB No. 25-37
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
- IFB No. 25-37 - GSC SEH Pueblo Office Renovation Addendum No. 4 - Q&As 237.6 KB
- Attachment Preview
-
PUEBLO COUNTY PURCHASING215 WEST 10TH STREET, ROOM 14PUEBLO, CO 81003Telephone: (719) 583-6097purchasing@pueblocounty.usADDENDUM NO. 4COUNTY OF PUEBLO, COLORADOIFB No. 25-37 - GSC SEH Pueblo Office RenovationDate: November 26, 2025What the Change is being done to the current IFB:1. Questions & AnswersThe proposer shall permanently affix this Addendum No. 4 to the IFB packet so it will besubmitted with the IFB.The undersigned proposer acknowledges receipt of this Addendum No. 4.Received by: _________________________________________Firm Name: ___________________________________________Address: _____________________________________________Date: ________________________________________________Page 1 of 4QUESTIONS1. What is the deck height?+/- 11 Feet.2. What is the existing ACT? We want to be able to accurately match this product.Our intent is so that we can reuse salvaged tiles are much as we can. If more areneeded, they’re to match existing. From previous suite renovation drawings, itwas mentioned that they’re building standard.3. Does the Demountable Partition for the conference room need a header (if so,please provide detail as per 5/A011)?1. If it does require a header, is it above ACT or a soffit? What is theelevation?From further coordination with the manufacturer (Teknion TekVue), the door hasbeen switched to sliding glass door. The demountable partition and door will beowner furnished and will be installed by Teknion to maintain warranty. They willprovide ceiling track for the demountable partition. GC to provide coordinationwith the installed as needed.4. How are we to stock materials for this project?Materials can be held on 1st floor in unfinished/unoccupied space.5. Are we to use the elevator or are we able to remove a window to move materialsin and out?Elevators can be used6. Are we to work normal business hours?Yes, you can work during normal business hours. If you would like to workoutside of normal business hours, Property Manager, Elizabeth Fritch, can getyou access to building7. Is door 103 part of the demountable partition or are we to provide that?Please see question 3.8. If we are to install the demountable partition, please provide information on thesystem.Please see question 3.9. Please provide a full description of glass type GL-1 in frame type F2?1. Is ¼” clear tempered glass acceptable?Yes that is acceptable.10. Where is Panel L5C located in the building? We may need to run new circuits topanel.Page 2 of 4Panel L5C is located in the 5th floor electrical room. See Map provided forQuestion #16.11. Please confirm the 3D signage for the lobby area is by owner.Looks like there was a PDF printing issue, Elevations 4 on A411 is supposed toshow the image of the signage. Please see below. The signage is to be providedand installed by the GC.12. The door schedule is calling for all office, IT and Storage doors to be hollowmetal. Is this correct?Information on schedule is incorrect. Door 101, 102, 104, and 105 are supposedto be a reinstalled of salvaged wood doors.13. Verify if we are to replace the sprinkler pipe with the slip-fit fittings that is locatedin the remodel area?Sprinkler piping within the remodel area shall be modified or adjusted as neededto provide compliant coverage for the new layout per NFPA 13. A full systemredesign is not anticipated. Existing branch lines and sprinkler heads may berelocated, adjusted, or reconfigured to achieve the required coverage. Use ofslip-fit fittings or replacement of existing piping shall follow the delegated fireprotection design prepared, stamped, and sealed by the fire protectionsubcontractor’s engineer of record.14. The architectural drawings indicate that door 103 is in the owner furnisheddemountable partition system. Please confirm whether Door 103 is to befurnished by the contractor per the door schedule, or if it will be provided as partof the owner-furnished demountable partition system.Please see question 3.15. Drawing E101 keynote #3 states that the contractor shall provide floor boxes forthe modular furniture. It was mentioned during discussions at the site visit that anoffice cubicle pole system may be used instead of floor boxes to provide flexibilityfor future modular furniture installation. Please confirm whether the cubicle poleoption is acceptable in lieu of floor boxes,Please provide floor boxes as part of the bid. Once total costs are known, it ispossible these will be replaced with power poles for the cubicles.Page 3 of 416. Could you please provide the location of the electrical panels and electricalrooms?Please see below for electrical room location.17. Panel PP5-1 , keynote 8 on Sheet E101 says it is in the 5th. floor electrical roombut the electrical room is not shown.See Map provided for Question #16.18. Panel AC6 , keynote 9 on Sheet E101 says it is in the 6th. floor electrical roombut the electrical room is not shown.The electrical rooms are stacked above each other on each floor. Therefore, the6th floor electrical room is located directly above the 5th floor electrical room. SeeMap provided for Question #16.19. Panel L5C , no location information provided.Panel L5C is located in the 5th or electrical room. See Map provided for Question#16.Page 4 of 4
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
NIST Boulder Building 2 1330 ...
Follow NIST Boulder Building 2 1330 Fume Hood Replacement Active Contract Opportunity Notice
COMMERCE, DEPARTMENT OF
Bid Due: 7/23/2026
Follow Fence, Remove and Install Active Contract Opportunity Notice ID 1331L526BarbFence Related Notice
Federal Agency
Bid Due: 7/10/2026