BID# 26-002 RFP DC3 Burke Drive Pavement Project
Project Information
- Bid Title
- BID# 26-002 RFP DC3 Burke Drive Pavement Project
- Issuing Agency
- Dodge City Community College
- Location
- Kansas
- Published Date
- Nov 10, 2025
- Closing Date
- Dec 2, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- BID# 26-002
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- BID# 26-002 RFP DC3 Burke Drive Pavement Project
- Attachment Preview
-
November 10, 2025To Whom It May Concern:Dodge City Community College is requesting sealed bid proposals for BID# 26-002 RFP DC3 Burke DrivePavement Project.Project Context:This project will be comprised of the removal of the existing asphalt pavement and replacement with concretepavement on Burke Drive at Dodge City Community College. Along with; curb and guttering, ADA sidewalk ramps,and sidewalk replacement (shown as Alt. 1). All contractors will submit bids following specifications as called out inthe SMH Consultants Burke Drive Replacement Documents.All contractors will submit bids as followed;1. As called out in SMH Consultants Burke Drive Replacement Documents at 8-inch-thick concrete pavementroadway.2. As called out in SMH Consultants Burke Drive Replacement Documents with revision of 7-inch-thickconcrete pavement roadway.3. Separate additional cost as called out in SMH Consultant Burke Drive Replacement Documents of “ALT #1– REPLACE 4’ CONCRETE SIDEWALK 10’ WIDE.”Note:Project start date called out as mid-May is negotiable if DC3 agrees with appropriate phasing.Sincerely,Andrew NolanPurchasing OfficeDodge City Community CollegeEncl: Specifications for BID# 26-002, DCCC information for BID# 26-002and Business Reply Label for BID# 26-002 (Please mark with your return address)Please include a business card with updated contact information in the packet.Contact Jared Stevens with questions or for additional information regarding this proposal or to schedule a sitevisit of Burke Drive.Jared StevensDirector of Facilities & OperationsDodge City Community College2501 North 14th AvenueDodge City, KS 67801-2399Email: JStevens@dc3.eduIt is anticipated that a recommendation will be submitted for board approval on December 9th, 2025.Deadlines:Bid OutBid receipt deadlineBid Opening Santa Fe Conference Room in the Administration BuildingBoard of Trustees MeetingNotification of successful bidder (Pending BOT Approval)November 10th, 2025December 2nd, 2025, by 5:00 PMDecember 3rd, 2025 @ 11:00 AMDecember 9th, 2025December 10th, 2025Please allow for the length of time it may take to send your bid through the USPS to meet the deadline for the bids.You may also submit bid packets by email to bids@dc3.edu by 5:00 PM December 2nd, 2025.The bid information and updates will be posted on the Dodge City Community College website, addresslisted below.https://dc3.edu/bid-requests-projectsContinued On Next PageMinimum Specifications for RFP DC3 Burke Drive Pavement ProjectGeneral Information:• Removal of existing asphalt as needed.• All dirt work must be included in the total project cost.• List total project cost.SMH ConsultantsBurke Drive ReplaceImages of SMH Consultants Burke Drive Replacement Documents PDF below.For onsite inspections to take measurements, contact Jared Stevens for an appointment.All specified items are preferred, but if unable to quote for the specified item, vender can, with notification, include asubstitute for an equivalent item.Other Bid Specifications and Conditions:1. All bid quotations to be valid for ninety (90) days.2. DCCC reserves the right to split up the items to different vendors.3. Please note any bid specifications exceptions.4. Items should be available within thirty (30) days of issuance of Purchase Order.5. Include freight costs for on-campus delivery on a separate line.Please allow for the length of time it may take to send your bid through the USPS to meet the deadline for the bids.Contact Jared Stevens with questions or for additional information.Jared StevensDirector of Facilities and OperationsDodge City Community CollegeCell - 620-338-3747jstevens@dc3.eduNotification of the successful bidder will be announced after the December 9th, 2025, DC3 Board of Trustees Meeting.
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RFP Accessible Parking Develo...
RFP Accessible Parking Development & Accessible Railings Improvements Marion County is seeking proposals
Marion County
Bid Due: 7/16/2026
Boat Ramp Replacement Project...
Follow Boat Ramp Replacement Project at Kirwin NWR Active Contract Opportunity Notice ID
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/31/2026