SBC 166-009-01-2025 Renovations to Floyd Stadium Addendum #3
Project Information
- Bid Title
- SBC 166-009-01-2025 Renovations to Floyd Stadium Addendum #3
- Issuing Agency
- Middle Tennessee State University
- Location
- Tennessee
- Published Date
- Jan 12, 2026
- Closing Date
- Feb 11, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
SBC 166-009-01-2025 Renovations to Floyd Stadium RFP for CMGC
- MTSU Renovations to Floyd Stadium Standard Documents
- Proposal Transmittal
- Technical Proposal & Evaluation Guide
- See new Cost Proposal
- Addendums
- Attachment Preview
-
Campus PlanningMTSU Box 44 – Holmes Building1672 Greenland DriveMurfreesboro, TN 37132615-898-2411Middle Tennessee State UniversityCampus PlanningJanuary 9, 2026ADDENDUM NO. 3SBC Project No. 166-009-01-2025CMRenovations to Floyd StadiumRequest for ProposalsTo All Prospective Proposers:Middle Tennessee State University is issuing Addendum No. 3 for the above-referenced project. Thisaddendum becomes a part of the Request for Proposals and modifies the original documents as notedbelow. All proposers must acknowledge receipt of this addendum in their proposal response.Purpose of this Addendum:To inform all proposers of the attached Pre-Proposal Conference Agenda, In-Person Attendees at thePre-Proposal Conference and those online. Included are questions generated at the Pre-ProposalConference.Attached Pre-Proposal In Person Attendance sheet (1 page), On-Line Attendance List (1Page) and Pre-Proposal Agenda (2 pages) MTSU outline of area in stadium SEE ATTACHED PDF WITHAPPROXIMATE AREASQUESTIONS DURING THE PRE-PROPOSAL CONFERENCE:1. Total sq/ft. of the project?a. It is not an enclosed space; however SECTION ‘A’ IS APPROX. 21,450 SF AND SECTION ‘B’IS APPROX. 28,820 SF2. Are Photos allowed in the submittal?a. MTSU will allow photographs in section B.2, B.3, and C.3.3. Can preliminary DRAWINGS be provided?a. We are at the early stages of the design process, and detailed drawings are not yetavailable. An image illustrating the general scope of work is attached (see WestGrandstand diagram). The final configuration will be determined through the completeddesign and will be based on meeting the bid target, enhancing the fan experience, andachieving the project deadline.4. 6.3 Attachment B.2 does items 4 & 5 does this pertain to this project?Campus PlanningMTSU Box 44 – Holmes Building1672 Greenland DriveMurfreesboro, TN 37132615-898-2411a. Strike items Skills Training 5. Industry, Production, Manufacturing, Equipment or ProcessCentric.5. What is the Construction Access to the project site?a. There are 4 gate areas at each corner of the field. The replacement area is located onthe west side of the stadium. The playing surface was recently replaced and will need tobe protected and put back into playing condition. Truck access to the stadium is limited.Previous projects have used the southeastern gate for field level access due to theexisting concrete apron in that location. All construction staging and campuscoordination will need to be confirmed by MTSU prior to start of construction.END OF ADDENDUM #3Addendum #3 dated December 19, 2025 is posted on:https://www.mtsu.edu/campusplanning/RFPQ.phpSincerely,Jamie BrewerDirector of Project ManagementCampus PlanningMiddle Tennessee State UniversityPre-proposal Conference January 7, 2026RFP for CM/GC on the RENOVATIONS TO FLOYD STADIUM166/009-01-2025cmProposal deadline Feb 11, 2026 at 2pmATTENDEES:First NameAllisonAshleyCrystalGreggHustonJackJasonJeffMarkMeghanMikeNickStephanieKeithSteveLast NameSalisburyAyubBurnesRiddleParkhurstKeenanLarkinsCasellaCorradoLewisDavisBuehringRivasEmail-1allison.salisbury@bartonmalow.comashley.ayub@bartonmalow.comcburnes@denark.comGriddle@weoneil.comjackk@structural-rs.comjlarkins@orionbldg.comJcasella@gilmc.comMcorrado@bulley.commlewis@rgandersoncompany.comMdavis@pc-const.comnickb@structural-rs.comstephanie.rivas@bartonmalow.comread.ai meeting notesread.ai meeting notesEmail-2wrothermel@denark.comTiacabone@weoneil.comBball@orionbldg.comStacie@pc-const.comCompany NameBarton MalowBarton MalowDenarkW.E. O'Neil ConstructionStructural Restoration SolutionsOrion Building Corp.Gilbert McLaughlin Casella Arch.Bulley & Andrews Rock CityRG Anderson ContractosP&C ConstructionStructural Restoration SolutionsBarton MalowPRE-PROPOSAL CONFERENCE – January 7, 2026RFP for a CM/GC on theRenovations to Floyd StadiumMTSUSBC No. 166/009-01-2025CMMEETING AGENDA / HANDOUT1. Introductions.2. Attendees to respond by email to Jamie.brewer@mtsu.edu to document attendancefor today’s Pre-Proposal Conference. Proposers documented will receive a copy ofthe attendance roster, Conference Notes, and RFP Addenda.3. Notice of Intent to Propose Deadline is January 14, 2026 (Wednesday)4. Access to the RFP via Web Page: https://www.mtsu.edu/campusplanning/RFPQ.php5. RFP Pre-Proposal Conference1. The purpose of the conference is to discuss the RFP scope of services andcontract requirements. While questions will be entertained, the oral response toany question at the conference shall be considered tentative and non-binding withregard to this RFP.2. RFP comments may be made by email to the RFP Coordinator by 4:30 p.m. onJanuary 21, 2026.6. Final issuance of Addenda by posting on the Web site is targeted to occur by 4:30p.m. on January 28, 2026.7. Project description is on page 44 of CM/GC RFP– Project Narrative andDocumentation.8. Standard areas of pre-construction phase services listed below:1. Review Project Information and Develop Procedures2. Administer Meetings and Provide Key CM/GC Personnel Participation3. Provide Consultation4. Prepare Schedules (1. The pre-construction phase schedule and (2) the preliminaryconstruction schedule5. Review Construction Feasibility6. Develop Project Construction Cost Model and Estimate7. Provide Value Analysis8. Review Construction Documents9. Develop Subcontractor Qualification Requirements and Subcontractor List10. Conduct Subcontract Bidding11. Provide a Guaranteed Maximum Price (GMP)12. Support Incomplete Project Design Activities9. Proposal Requirements and Process, RFP Section 3, Pages 7-8A proposal in response to this RFP shall consist of the following Three documents1
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Category* Solicitation Name Addenda Engineer/Architect Contact Pre-bid Meeting Bid Opening Date & Time
City of Kingsport
Bid Due: 7/10/2026