South Cross Bayou Replacement of Generator Controls and Switchgear (GEN2) (PID 004906A) - STEP 1

Project Information

Bid Title
South Cross Bayou Replacement of Generator Controls and Switchgear (GEN2) (PID 004906A) - STEP 1
Issuing Agency
Pinellas County
Location
Florida
Published Date
Feb 28, 2026
Closing Date
Mar 19, 2026
Government Level
State & Local
Status
Closed
Ref. #
26-0256-ITB-C
Original Source
Join to Access Full Details
Project Description


Project ID: 26-0256-ITB-C

Title: South Cross Bayou Replacement of Generator Controls and Switchgear (GEN2) (PID 004906A) - STEP 1

Addenda: 0

Release Date: 2/27/2026

Due Date: 3/19/2026

Follow
South Cross Bayou Replacement of Generator Controls and Switchgear (GEN2) (PID 004906A) - STEP 1
Invitation to Bid - Construction (ITB-C)
UTILITIES
91200 , 91359 , 91391 , 91438 , 94100 , 94172
Project ID: 26-0256-ITB-C
Release Date: Friday, February 27, 2026
ยท Due Date: Thursday, March 19, 2026 3:00pm
Posted Friday, February 27, 2026 3:58pm
All dates & times in Eastern Time
Draft Response Events RSVP No Bid19 days, 11 hours, 57 minutes


Post Information

Posted At:Fri, Feb 27, 2026 3:58 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The work to be performed under these Contract Documents consists of the removal and replacement of four (4) 3200 ampere draw out generator circuit breakers and six (6) 2000 ampere draw out feeder circuit breakers in two (2) 277/480 volt, 3-phase, 4-wire switchgear lineups, each with a 6000-ampere main bus rating. The switchgear lineups and circuit breaker cells shall be reconditioned and modified, as required, for the new circuit breaker installations. Additionally, the work shall include the removal of six (6) free-standing, floor-mounted, generator/engine control cabinets and the control components contained within these cabinets. The installation work is located at the Pinellas County South Cross Bayou Advanced Water Reclamation Facility (SCBAWRF). The work shall be inclusive of all equipment, materials and work required for operational systems that are complete and fully tested.



Background

The existing Electrical Switchgear has more than three decades of useful life at SCBAWRF. The system has exceeded its useful service life, is located in a highly corrosive environment, and needs to be replaced. This overall project is a four (4) year program to replace all twelve (12) electrical switchgear infrastructure components at the SCBAWRF. This specific project will serve as Phase 1 of the overall programmed work. Following the Phase 1 work, will be the remaining phases until all twelve (12) electrical switchgear infrastructure units at SCBAWRF are replaced. The complete work is programmed to be completed in four (4) years.



Timeline

Issue Date:
February 27, 2026
Site Visit / Pre-Conference Information (Non-Mandatory):
March 11, 2026, 9:00am
South Cross Bayou Advanced Water Reclamation Facility
7401 54th Avenue North, St. Petersburg, FL 33709
Step 1 Question Submission Deadline:
March 12, 2026, 3:00pm
Step 1 Qualification Submission Deadline:
March 19, 2026, 3:00pm
Step 2 Bid Submission Deadline:
March 31, 2026, 3:00pm
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

High Voltage Electrical Subst...

Main Agency Kissimmee Utility Authority Status Active Fiscal Year 2026 Primary Contact Sheila

Polk County Public Schools Facilities and Operations

Bid Due: 8/04/2026

High Voltage Electrical Subst...

Main Agency Kissimmee Utility Authority Status Active Fiscal Year 2026 Primary Contact Sheila

Brevard County School Board

Bid Due: 8/04/2026