RFP: Atkinson Elementary HVAC Changeout Phase 2
Project Information
- Bid Title
- RFP: Atkinson Elementary HVAC Changeout Phase 2
- Issuing Agency
- County of Henderson
- Location
- North Carolina
- Published Date
- May 6, 2026
- Closing Date
- Jun 3, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Title Bid/RFP Closing Date Bid/RFP Status Files View Bid Awarded To RFP: Atkinson Elementary HVAC Changeout Phase 2 Wed 6/3/26
Open - accepting bids and proposalsView Details - Attachment Preview
-
Henderson County Capital Projects100 N. King St., Project ManagementHendersonville, North Carolina 28792___________________________________________________________________________________Memorandum To: Interested Qualified BiddersFrom:Subject:Bryan RhodesHC Capital Projects DirectorBrian CottonHC Capital Projects SuperintendentRonnie KilbyHC Capital Projects Project CoordinatorChad DillonHenderson County Public Schools Director of FacilitiesRequest for Proposals:Atkinson Elementary HVAC Changeout Phase 2Date:5/6/2026Mandatory Pre-Bid Meeting:Thursday, May 21 @ 10amAtkinson Elementary School2510 Old Kanuga Rd.Hendersonville, NC 28739Proposals are due:Wednesday, June 3 @ 1:00pmHenderson County Government OfficesAttention: Bryan Rhodes100 North King Street Project Management SuiteHendersonville, NC 28792Location of Work:Atkinson Elementary School2510 Old Kanuga Rd.Hendersonville, NC 28739Last Day for Questions:Wednesday, May 27 @ 4:00pm.Questions must be sent via email toBrian Cotton @ bcotton@hendersoncountync.govSealed hard copy bids will be received from bidders by Henderson County at the Henderson CountyGovernment Offices, 100 North King Street, Project Management Suite, Hendersonville, NorthCarolina 28792 until Wednesday, June 3 @ 1:00pm.***It is the sole responsibility of the vendor that its bid reaches Henderson County by thedesignated date and time indicated above.***Page 1 of 6Henderson County Capital Projects100 N. King St., Project ManagementHendersonville, North Carolina 28792___________________________________________________________________________________Scope of Work:o Replacement of Current P-Tac style HVAC units with units and materials per engineereddrawings attached.o Existing HVAC equipment is to stay in service until the new units are fully functional.o New HVAC units to be installed in the corridor section per engineered drawingsattached.o Factory commission and Start-up of the units is mandatory.o Factory inspection and Handover inspection with written documentation from thefactory and all start up documentation is required for final payment on this project.o Upon completion of the new HVAC systems in each classroom, existing HVAC units musthave hot water lines capped. The caps must be soldered or pro-pressed. Any othermeans of isolation will not be accepted. (Please see plans for alternate #1)o The wiring to each unit needs to be terminated in the nearest junction box and allexisting conduit and wiring to be removed by the contractor.o The recovered units are to be removed and disposed of in a legal manner.o All recovered R-22 refrigerant will be returned to Henderson County Public Schools.HCPS Maintenance Department will provide the needed recovery tanks for therecovered refrigerant.o Upon removal of the existing HVAC units, wall openings must be secured immediately.Temporary covers must be watertight and rodent proof upon leaving the site.Temporary covers must be secured from inside the of the building.o The base bid for permanent wall enclosures will be: 8-inch block laid in the opening,waterproofed, finished and painted to match the existing finish as listed on thedrawings.o Interior finish of block to be flush with existing wall and painted to match the existing.Substantial completion date of this project is ____________________________________Page 2 of 6Henderson County Capital Projects100 N. King St., Project ManagementHendersonville, North Carolina 28792___________________________________________________________________________________o Liquidated damages of $1,000 per day will be applied, per day past the date ofsubstantial completion. Liquidated damages will be determined upon contractorperformance and shall not be applied to any delays due to procurement of needed unitsor materials for this project.GENERAL:Henderson County requests proposals to provide a turnkey project inclusive of all labor, materials,traffic control, supervision, disposal fees, permits and inspections for the replacement of AtkinsonElementary HVAC changeout Phase 2. This work is to take place in coordination with HendersonCounty Public School Systems schedule. This may require work to be done in the evenings andweekends. All work that must take place in classrooms must be scheduled for after school oron weekends. End of Grade testing schedules will be provided to the awarded contractor. Contractoris to meet or exceed all requirements and specifications outlined in the RFP and Pre-bid.The attached DPI approved drawings show phase 1 and Phase 2. Phase 1 drawings are included toshow the location of needed carbon monoxide detectors throughout the project and for Contractorreference of mechanical, electrical and structural work previously completed.PHASE 2 drawings and the carbon monoxide detectors detailed in plans: E-101, E-102, E-103,E-104, E-105, E-106, and E-107 will be the base bid.Job Specifics:Atkinson Elementary HVAC Changeout Phase 2 is to be bid by a North Carolina GeneralContractor. License must be included in bid packageSub list and Schedule are to be included in bid package.Atkinson Elementary School is a fully operating school site. All work that needs to be done in aclassroom space will have to be done after hours or on weekends.Bi-Weekly reports from contractor required.The roof penetrations for this project must be completed by a local Carlisle Certified Roofingcompany. All of the roofing at Atkinson Elementary School is under warranty. All neededcorrespondence with the manufacture to ensure that the work for this project does not voidthe warranty must be documented. All roofing for this project is at the expense of the awardedcontractor. Any damage that occurs from unsealed penetrations made during this project willbe the responsibility of the awarded contractor.Page 3 of 6Henderson County Capital Projects100 N. King St., Project ManagementHendersonville, North Carolina 28792___________________________________________________________________________________As detailed in the plans, carbon monoxide detectors must be installed and integrated into theexisting fire alarm system for both phase 1 and 2. The existing fire panel is an Edwards I Opanel. All work done involving the fire alarm system must be completed by a certifiedEdwards fire panel technician and an Edwards Fire Alarm dealer. All work done must bedocumented and turned in at the end of this project. All fire alarm work for this project will beat the expense of the awarded contractor.Site Conditions:o Awarded Contractor is mandated to provide, a Superintendent onsite, for the duration of time,while work it being performed.o All Subs will be Tier 1 with a state issued ID. Everyone working on this project will be requiredto sign in daily at the front office and receive a visitor badge. This is part of our school safetyprotocol and is not negotiable.o If there is any risk of debris falling during the cutting of the roofing or removal of roofing forcurbing, the Contractor will be required to build a temporary roof type structure over theequipment to protect it. This will be at the Contractor’s expense.o The building will be occupied. Contractors and sub-contractors are limited to the work areasassociated with work being done.o Contractor will not be allowed to work on Graduation Day. The date of Graduation will beprovided to the Contractor well in advance for scheduling.o A 120 volt/ 20 amp/ single phase circuit will be provided by the owner for power tools. Anyelectrical needs beyond this are the responsibility of the Contractor.o Cranes, lifts, hoists and temporary storage pods for supplies may be parked at a designated areaof the parking lot. HCPS will not be responsible for the security of this equipment or stored items.o If the Contractor requires a dumpster, this will be the responsibility of the Contractor. Thecontractor will not be allowed to use HCPS dumpsters. Space for a contractor provided dumpsterwill be provided at a designated area to be discussed during the Pre-bid.o Sanitary facilities will not be available at the job site. The contractor will not be allowed to userestrooms inside the buildings. The Contractor shall be responsible for the provision andmaintenance of portable toilets. A convenient location will be provided at a designated area tobe discussed during the Pre-bid.o Smoking is not permitted on the job site or the HCPS campus.o Contractor is required to ensure all workers are wearing proper P.P.E. (Hard hat, safetyglasses, gloves, Hi-vis clothing etc.) during construction and following all required OSHAguidelines.o Any damage to walkways, pads, patios, and foliage will be the responsibility of the Contractorto repair or replace at his expense.o All utility interruptions are to be scheduled with the Director of Facilities. This includes timeswhich the fire notification may need to be taken offline for work.Page 4 of 6Henderson County Capital Projects100 N. King St., Project ManagementHendersonville, North Carolina 28792___________________________________________________________________________________o Communication with students is not permitted. Shirts are required at all timeso Weapons are prohibited on school property. It is the policy of Henderson County PublicSchools that the campus shall be free of unauthorized weapons. No Contractor, subcontractoror employee, while on campus, shall carry or encourage another person to carry, whetheropenly or concealed an unauthorized weapon as defined by G.S 14-284.1.Project will be awarded based on total Base BidTOTAL BASE BID$_____________________Base Bid as specified in Engineered drawings.Add alternate #1- Removal of accessible existing hot water lines in the hallways and classrooms. Allinaccessible lines to be capped using soldered or pressed caps.Add alternate #1.$ _______________________1. All applicable licensure with North Carolina.2. General Workday Schedule for “all anticipated workday start and completions” or stoppage.3. Warranty on all above work4. Proposals to be in the form of a proposed contract signed by the bidder and ready for theCounty’s approval.5. Include a copy of COI and W-9 form.6. Proposals should include a lump sum price for the base bid work with separate pricing for eachalternate listed.7. Contractor is required to price all alternates as well as base bid price.8. Include all applicable taxes in proposal. Henderson County is not tax exempt.9. Payment and Performance bond for 100% of the base bid are required for proposals over$300,000.00.10. Bid bond is required on proposals over $500,000.00, in an amount equal to but not less than fivepercent (5%) of the gross amount of the bid.11. Include the appropriate MWBE affidavits with the proposals over $300,000.00.Page 5 of 6
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
PRB.37212 - CONSTRUCTION OF D...
PRB.37212,51830.2.11.08,Helene POC PRB.37212 - CONSTRUCTION OF DESIGN BID BUILD BRIDGE REPLACEMENT ON PRIVATE
Division of Highways
Bid Due: 7/15/2026
Carmel and Mooreland Farms Ro...
Project: Carmel and Mooreland Farms Road Sidewalk Gap Ref. #: 269-2026-238 Department: City
City of Charlotte
Bid Due: 7/23/2026