2026-2029 Construction Equipment on Structures Submittal Review Term Contract
Project Information
- Bid Title
- 2026-2029 Construction Equipment on Structures Submittal Review Term Contract
- Issuing Agency
- State Government of Montana
- Location
- Montana
- Published Date
- Mar 27, 2026
- Closing Date
- Apr 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 2026-2029
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Title Closes 2026-2029 Construction Equipment on Structures Submittal Review Term Contract 04/15/2026 - Attachment Preview
-
Christopher Dorrington, Director2701 Prospect ▪ PO Box 201001Helena MT 59620-1001Date:March 26, 2026Subject: Request for Proposals2026-2029 Construction Equipment on Structures Submittal Review Term ContractTo Whom It May Concern:The Montana Department of Transportation (MDT) is accepting proposals from consulting firmsinterested in a term contract to provide professional engineering services to review contractorsubmittals for bridge construction equipment on structures. One firm will be selected to performthe work specified herein.MDT intends to establish a term contract to utilize a consultant on an "as-needed" basis for thework described herein. At this time, the intention is to award one (1) agreement that will beapproximately $1,500,000, for a three-year period from June 2026 through June 2029. MDTreserves the right to revise the number of term contracts, the contract values, or contracttimeframes, depending on the responses received. Extension(s) of contracts, by mutualagreement of both parties, may be made at one (1) year intervals, or any interval that isadvantageous to MDT. Contracts, including any renewals, may not exceed a total of five (5)years.Teams may be established as necessary; however, it is expected that the prime consultant will becapable of completing the vast majority of the work, and the proposal must clearly identify theprime for this contract. As a rule, the prime consultant must complete at least 50% of the workfor a specific project or assignment unless written exception is given.Montana professional engineering licensure is required for this work and must be in-hand at thetime your proposal is submitted. If this requirement is not met and clearly identified in theproposal, your proposal will be considered non-responsive.If your firm is interested, please submit a proposal as described herein.Consultant Design BureauPhone: (406) 444–6209Fax: (406) 444–6253An Equal Opportunity EmployerEngineering DivisionTTY: (800) 335–7592Web Page: www.mdt.mt.govSCOPE OF WORKThe scope of work includes providing professional engineering services to review contractorsubmittals for bridge construction equipment on structures, ensuring compliance with contractplans, specifications, MDT standards, and applicable AASHTO guidelines. The work willinclude, but not be limited to, performing independent technical load rating reviews of contractorsubmittals, and reviewing the following: work plans, construction engineering submittals, shopdrawings, working drawings, product data, material certifications, and inspection reports. Adetailed list of summary of work and services required is included in Attachment A of this RFP.LOCATIONVarious – StatewidePROJECT SCHEDULE AND DELIVERABLESThe project schedule will be developed and negotiated separately for each individual term/taskassignment. At this time, it is anticipated that deliverables will generally follow those describedin MDT’s Consultant Activity Descriptions (as applicable):http://www.mdt.mt.gov/other/webdata/external/cdb/ACTIVITY_DESCRIPTIONS/CONSULTANT_DESIGN_2500_MU.PDFSTANDARDS, SPECIFICATIONS, AND POLICIESWork is expected to follow MDT’s various Manuals, Guides, and Policies. These items may befound on MDT’s Design Consulting web page at: http://www.mdt.mt.gov/business/consulting/.PROPOSAL SUBMITTALSubmit one (1) electronic version (Adobe© PDF format) of the proposal. Hard copyproposals will not be accepted.Submit the electronic version by uploading to the State of Montana File Transfer Service (FTS)site, which can be accessed at this link: https://transfer.mt.gov. To upload to FTS, an accountmust be created unless the person who is uploading already has an account. Uploadinginstructions can be accessed at https://transfer.mt.gov/Home/Instructions. When your proposalhas been uploaded, the FTS system will prompt you for an email address to send to. Please sendthis email of your uploaded proposal to the following individuals:Sheryl Tangen: stangen@mt.govKelly Williams: kwilliams@mt.govJoel Pilcher: jpilcher@mt.govThe Department must receive the proposals for this RFP no later than 3:00 PM MST, April15, 2026.Regardless of cause, late proposals will not be accepted and will automatically be disqualifiedfrom further consideration. It shall be solely the vendor's responsibility to assure delivery at thespecified office by the specified time. Offeror may request the State return late proposals atPage 2 of 7vendor’s expense or the State will dispose of late proposals if requested by the offeror. (SeeAdministrative Rules of Montana (ARM) 2.5.509.). If no request is made, late proposals becomethe property of the Department. All proposals submitted on time become the property of theDepartment.The costs for developing and delivering responses to this solicitation are entirely theresponsibility of the offeror. The State is not liable for any expense incurred by the offeror in thepreparation and presentation of this submittal.TENTATIVE RFP/SELECTION SCHEDULEThe anticipated schedule for consultant solicitation and selection for this contract is as follows(subject to change):March 26, 2026: RFP releasedApril 15, 2026:Proposals due to be submitted to MDT Consultant DesignMay 6, 2026:Consultant Selection Board meeting to select consultantThere are three (3) members on the evaluation committee for this RFP (subject to change):1. MDT Bridge staff2. MDT Bridge staff3. MDT Consultant Plans EngineerPROPOSAL CONTENTSThe proposal must contain the information listed in this section. The proposal is limited to five(5) pages, not including the required Appendices. A single cover jacket/title page is allowed ifdesired and will not count in the page limit. Each page is defined as one side of a letter size sheet(no larger than 8 ½” x 11”), minimum font size of 10. Evaluation of information will begin withthe first page immediately following the cover jacket/title page, and every page will be counted,in order, from that point forward, including any table of contents or divider pages the firm wishesto include. Once the page limit is reached, any information included thereafter will be removedand not considered or scored. Please organize your proposal in the same order and numberingformat as shown below, which will assist MDT in reviewing your proposal:Questions1) Team QualificationsProvide a discussion on how the team you propose to use for this project (includingsubconsultants, if used) is best qualified to respond to the requirements of this project.Discussion should focus on the requirements for this specific project, particularly yourteam’s expertise and experience, as it relates to the work described in the “Scope ofWork” section above. Provide examples of previous related project experience as itrelates to these services. Identify professional licensure of staff that satisfy therequirements for this contract. Include an organizational chart of your team for thisproject. Also briefly discuss your compatibility of systems, software, and equipment (i.e.CADD software, word processing software, etc.), and experience with these systems,software, and equipment. The Department’s standard design software is Autodesk®technology included in the Architecture, Engineering & Construction (AEC) Collection.Page 3 of 7Describe any special equipment or software you intend to use. Resumes may beconsidered as supplemental information for scoring this question.2) Approach to Task AssignmentsTransportation work has many challenging aspects, and the development and delivery ofa successful work product that addresses and mitigates specific challenges is of utmostinterest to MDT. Discuss the challenges you foresee as they relate to this type of work,your strategy for addressing these challenges, and your specific experience inimplementing the strategies identified. Describe your quality assurance/quality controlprocess. Provide a discussion on your overall strategy for delivering work in a timelymanner, including fast-tracked or emergency tasks and changing priorities.Appendix A: ResumesInclude brief resumes for the key personnel to be assigned to the contract. Resumes arelimited to one (1) page per person.Appendix B: Cover Page FormInclude a completed version of MDT’s standard cover page form, available at the followinglocation:http://www.mdt.mt.gov/other/webdata/external/cdb/MDT-CDB-002-Proposal-SOQ-Cover-Sheet.pdfInformation presented in the cover page form will not be considered in proposal scoring.Appendix C: ReferencesSubmit references that includes a minimum of five (5) separate contracts from the pastthree (3) years. If applicable, you may submit multiple contracts for a single client. Eachcontract must pertain to work similar to the proposed scope of services. Include clientname, a currently employed primary contact person, an alternative contact person,corresponding valid phone numbers and emails for both contacts, a range of contract value,and a brief description of the work performed. If MDT needs to use these references for thePast Performance Score (as described in the “Evaluation of Proposals” section below) andis unable to contact the required number of references after a reasonable effort, the firmwill receive a zero for the missing reference(s).EVALUATION OF PROPOSALSAll proposals will be evaluated in accordance with the following factors:1) Team Qualifications (100 points possible)2) Approach to Task Assignments (50 points possible)3) Record of past performance (30 points possible)a) If two (2) or more MDT evaluations specific to the discipline for this contract areavailable for the consultant, the average score of these evaluations will be used.Evaluations for Project Management & Overall Performance will also be included.b) If fewer than two (2) MDT evaluations specific to the discipline for this contract areavailable for the consultant, but there are two (2) or more MDT evaluations areavailable for other work disciplines, the consultant’s current overall past performancescore from MDT evaluations will be used.Page 4 of 7c) If there is only one (1) MDT evaluation available for the consultant, the record of pastperformance score will be an average of the MDT evaluation and one (1) referencecheck from the references provided in the unbound attachment.d) If no MDT evaluations are available, the average score of two (2) reference checksfrom the references provided in the unbound attachment will be used for this score.Regardless of partnership/teaming relationships, the past performance of the primeconsultant will be the past performance scored that will be used for this score.All Proposals will be evaluated using the following basic scoring methodology:o Outstanding/Exceptional response: 90-100% of the available pointso Good response: 70-90% of the available pointso Average response: 50-70% of the available pointso Poor response: 30-50% of the available pointso Qualifications not clearly met: 0-30% of the available pointsFollowing the review, evaluation, and rating of all proposals, the final results will be presented tothe Consultant Selection Board at the MDT Headquarters Building. At this time, the ConsultantSelection Board will select the most qualified firm for TERM CONTRACT. The Board mayconsider any proposal scoring within 2% of another proposal as equally qualified and take intoaccount its knowledge of the firms’ workload, past performance, and familiarity with the specificwork to be performed in selecting the most-qualified consultant.COMPENSATION AND PAYMENTThis contract will be administered on a cost-plus-fixed-fee or specific-rates-of-compensationbasis and MDT will make that determination on the assignment level. The contract will have anegotiated cost ceiling to ensure cost control. The cost ceiling does not ensure or imply that theConsultant is entitled to that entire amount. Only actual incurred hours and costs arecompensable.Upon selection, certain financial information from the selected Consultant will be required aspart of the contract agreement.Specific Rates of CompensationWhen the specific-rates-of-compensation method is used for a term assignment,Consultant will be required to provide the specific rates of compensation for each staffmember that will perform work for the project. Rates may be developed by the individualor by job classification. Each rate is built by assembling the known and documentedactual elements of direct salary, indirect cost rate, and fee into an agreed upon hourlyrate. Overtime is compensable, so long as it is in accordance with Firm policies, as wellas state and federal regulations.All individuals working on the specific assignment must be listed in the term assignmentproposal with individual specific rate of compensation. If additional staff are proposed toPage 5 of 7
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 541330Engineering Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.