CITY OF LAKEWAY
ITB No. 26-1001
Butler Rough Hollow Park Improvements
Pre-Bid Conference – February 27, 2026
Questions and Answers
Question 1:
Who holds coordination responsibility between the playground equipment
vendor and the shotcrete installation, including final geometry approval and
tolerances?
Answer 1:
Coordination shall be between the Contractor and the Playground Equipment
Vendor. Reference the Plans & Specifications for Contractor scope. Shotcrete is
to be completed by the Contractor with coordination on the Playground Vendor
for the final geometric approval.
Question 2: Is the site expected to be balanced, or should bidders anticipate
import/export of material?
Answer 2:
Reference the Unit Pricing Form for the quantities of import/export material
(embankment, excavation, and embankment imported).
Question 3: Will the Geotechnical Report be provided?
Answer 3: Yes. The Geotechnical Report will be provided in an Addendum.
Question 4: LCRA has authorization to modify and add erosion control measures during
the project. How will added costs or increases be handled?
Answer 4:
Lower Colorado River Authority (LCRA) has reviewed the project documents and
does not anticipate changes to erosion control requirements. Paul Duncan
confirmed during the site visit that LCRA will not be inspecting the site throughout
construction as it is not in their jurisdiction.
Question 5: Have all utilities been verified in the field, or should bidders include pothole
and conflict investigation in their bid?
Answer 5:
The Contractor will be responsible for all utility locates before beginning any work.
Record drawing is in the survey.
Question 6: Is there an RFI deadline? I did not see one in the RFP.
ITB No. 26-1001 – Butler/Rough Hollow Park Improvements
Page 1
Answer 6:
Questions regarding ITB No. 26-1001 must be received no later than seven (7)
working days prior to the closing date of the Bid.
Question 7: What is the permitting requirement on the Contractor’s side?
Answer 7:
Please see Supplemental General Conditions/00810, Article 6.
Contractors Responsibility, Supplemental General Conditions/00810
Site Development
Building Development and Services
LCRA has granted plan approval but may have other permit requirements; please
coordinate.
Site Development Permit will be provided upon award of bid. Building Permits
are not required for the proposed structures.
Question 8: Will materials testing and inspection services be provided by the Owner, or
included in the Contractor’s scope?
Answer 8: It is the Contractor’s scope.
Question 9: Was there a required planting establishment period and maintenance?
Answer 9:
Reference the planting notes that are on the last sheet of the Planting Plan and the
Planting Specification.
Question 10: Will the City provide the estimated budget funding for this project?
Answer 10: The City does not release estimated budget funding amounts for projects.
Question 11: What items were purchased by the Owner and must be installed by the
Contractor?
Answer 11:
The items purchased directly by the Owner and the Contractor shall be responsible
for installation:
Site Furnishings:
Benches
Tables
Trash Receptacles
Bike Racks
Bike Repair Station
Sports Field Equipment:
Backstop
Baseball Bases
Player Benches
Soccer Goals
ITB No. 26-1001 – Butler/Rough Hollow Park Improvements
Page 2
The Contractor shall coordinate construction sequencing with the City and the
associated vendors.
Additionally, the Contractor shall prepare the following areas as required by vendor
and plans:
Playground
Ninja Course
Restroom (Reference Corworth “Client’s Scope of Work” Document
included in Addendum)
Pavilion
Solar Pole Lights
Mountain Bike Park
Preparation may include grading, concrete pads, shotcrete, or footings. Reference
the plans and specifications. It is recommended that the Contractor reach out to
the Vendors listed to clarify the preparation that is required for these items and
include it in scope.
Question 12: Are the quantities of the Owner purchased items provided in the
solicitation?
Answer 12:
References to Owner-purchased equipment currently appear in Section 00020
(Page 1) and Section 01010 – Summary of Work.
Manufacturer or Vendor contact information, Model Numbers, etc. are provided
on sheet L3.00 in the Construction Document set.
Quantities of Site Furnishings & Sports Equipment provided below:
Benches (5)
Tables (5 non-ADA, 4 ADA)
Trash Receptacles (7)
Bike Racks (1)
Bike Repair Station (1)
Backstop (1)
Baseball Bases (1 Home Plate & 1 set of 3 bases)
Player Benches (6)
Soccer Goals (2)
The Unit Pricing Form includes a Lump Sum “Site Furnishings Installation” (Site
Amenities Item 7) for the unit price of the Site Furnishings and Sports Equipment
installation. The quantities provided should be used to inform the unit pricing
figure.
Question 13: What are the construction hours for this project?
Answer 13: Per City of Lakeway Code of Ordinance No. 24.02.202, construction is permitted:
Monday through Friday: 7:00 a.m. – 7:00 p.m.
ITB No. 26-1001 – Butler/Rough Hollow Park Improvements
Page 3
Contractors are not permitted to work on Saturdays or Sundays without prior City
approval. If approved:
Saturday and Sunday: 8:00 a.m. – 7:00 p.m.
Weekend work must be approved at least three (3) days in advance by the City of
Lakeway Building Development Services Department and the Parks and
Recreation Department.
General Conditions, Page 5 of 50, will be amended to reflect these hours.
Questions received during the Site Visit.:
Question: 14. What are the sedimentation and erosion issues?
Answer 14:
This area has rough terrain and steep slopes. The Contractor must control the
erosion at all times as the creek below filters to Rough Hollow Cove, and it flows
directly to Lake Travis; therefore, strict compliance with all applicable water quality
and environmental regulations is required. A Water Quality Pond is located within
the project area and shall be protected at all times. Weekly inspection reports are
required for all sedimentation and erosion controls.
Question 15. Where can we stockpile trees and brush cutting?
Answer 15:
Brush removal must be hauled off and trees removed or limbs may be shredded as
mulch spread on site under preserved trees on site or must be hauled off. Free
storage of stockpiles of brush and trees is not permitted. Any oak tree limbs that
are pruned area to cut clean and painted immediately (reference plans and
specifications).
Question 16: Where to park equipment and vehicles?
Answer 16:
Lot 30 LPG Tank Site is a separate lot and is not City property. Do not park on
private property. Construction equipment and personal vehicles are prohibited
from parking in that area, unless you have approval from the property owner. Do
not park on private property unless you have approval from the property owner.
There is only one entrance to the park. Every hour, the street must be swept and
cleaned. Because of the close proximity of the school, depending on the stage of
the project, there may be a time when the City may limit the vehicles to allow
school buses to navigate the streets.
ITB No. 26-1001 – Butler/Rough Hollow Park Improvements
Page 4
Question 17: Any restrictions for drone use?
Answer 17: Contractor’s requesting to use a drone should email the Purchasing Coordinator.
An email will be sent to the Communication Director for approval.
Question 18: Use of Water and where to have a water meter installed?
Answer 18:
All coordination and compliance with MUD 13 requirements shall be the
responsibility of the Contract. Contractors must contact MUD 13 to coordinate
water service, meter installation and wastewater. MUD 13 maintains its own
requirements. Reference the drawings set for the proposed water meter location.
Question 19: How many acres is this park?
Answer 19: The project area is approximately 9.5 acres.
ITB No. 26-1001 – Butler/Rough Hollow Park Improvements
Page 5
Commodity Codes
  • NAICS 236220Commercial and Institutional Building Construction
  • NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Polos

Polos Solicitation ID: IW256684 Due Date: 7/16/2026 Due Time: 3:00 PM Agency/Texas SmartBuy

State Government of Texas

Bid Due: 7/16/2026

Food Service - Ice Machines

Food Service - Ice Machines Solicitation ID: 26014L31 Due Date: 8/6/2026 Due Time:

State Government of Texas

Bid Due: 8/06/2026