Charging Infrastructure Deployment Incentive Program
Project Information
- Bid Title
- Charging Infrastructure Deployment Incentive Program
- Issuing Agency
- South Coast Air Quality Management District
- Location
- California
- Published Date
- Aug 2, 2025
- Closing Date
- Nov 28, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- PA2026-03
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number Title Bidder's Conference Closing Date Contact Person Document PA2026-03 None 11/28/2025
12:00 PMInvest Clean -infrastructure
(909) 396-2000PA2026-03
- Attachment Preview
-
Program Announcement#PA2026-03Charging Infrastructure Deployment IncentiveProgramAccepting Applications: August 15, 2025, at 12 PM PTSubmission Deadline: November 28, 2025, at 12 PM PTPA2026-03In July 2024, U.S. EPA awarded funds to the South Coast Air Quality Management District(South Coast AQMD) to implement INVEST CLEAN in Los Angeles-Long Beach-Anaheim andRiverside-San Bernardino-Ontario Metropolitan Statistical Areas (MSAs). The two MSAsinclude the following four counties: Los Angeles, Orange, Riverside, and San Bernardino.INVEST CLEAN targets the limiting factors and challenges to the electrification transformationof the Southern California goods movement corridor.INVEST CLEAN comprises four incentive measures to modernize the goods movement sectors.South Coast AQMD is soliciting applications under each individual measure. This ProgramAnnouncement (PA) is to solicit projects1 under Measure 1: Charging Infrastructure DeploymentIncentive Program (Program). This Program will provide incentive funding to support thedevelopment of fast charging infrastructure that facilitates the timely deployment of battery-electric medium and heavy-duty vehicles, as defined in Table 1, including Class 4 to 8 goodsmovement vehicles in the region.SECTION I – OVERVIEW & ELIGIBILITY REQUIREMENTSThe total incentive funding for this measure is $178,500,000. All applications will be evaluatedbased on the criteria set forth in this PA, which align with the INVEST CLEAN Workplanapproved by EPA and the Terms and Conditions of the EPA grant.WHO:WHAT:HOW:WHEN:Entities directly responsible for planning, designing, constructing, and operating acharging station. Applicants can be charging station developers and operators,fleet operators, truck stop operators, and distribution centers.Rebate-based incentives to offset the cost of eligible charging equipment thatdirectly supports Class 4 to 8 medium heavy duty (MHD) and heavy heavy duty(HHD) goods movement vehicles. The funding amount is determined based onthe output of the charging system of the stations.All applications must follow the instructions provided in South Coast AQMD’sGrants Management System (GMS). Failure to adhere to the instructions may because for rejection of the application without evaluation. The Application Portalcan be found on South Coast AQMD’s INVEST CLEAN programpage:(https://www.aqmd.gov/investclean).Applications can be submitted starting August 15, 2025, at 12 PM PT and closeson November 28, 2025, at 12 PM PTApplication evaluation is anticipated to start in November 2025, followed byRebate Agreement (“Agreement”) execution starting early 2026.Charging stations should be commissioned by March 2028, and all awardees willbe required to operate the funded equipment for a minimum of five years.1 “Project” refers to the proposed charging infrastructure at one location1PA2026-03ItemIssue PA2026-03Applications OpenDeadline to Submit ApplicationAgreement ExecutionPerformance and usage trackingDateAugust 1, 2025August 15, 2025, at 12 PM PTNovember 28, 2025, at 12 PM PTJanuary 2026 through August 2027Commencing after DeploymentALL APPLICATIONS MUST BE RECEIVED VIA SOUTH COAST AQMD’SONLINE GRANT MANAGEMENT SYSTEM (GMS)GENERAL PROGRAM INFORMATIONFunding under this PA is rebate-based. Rebates will be provided on a cost-reimbursement basisin accordance with the fully executed agreement for the charging station(s) (see Section V for thegeneral agreement terms). Charging equipment and associated components that support thecharging of Vehicle Classes, as defined in Table 1, and potentially the installation costs of theequipment are eligible for a rebate. Please see the ELIGIBLE EQUIPMENT AND COSTSection below for further details.Table 1- Vehicle Weight Classes & CategoriesVehicle ClassGVWR CategoryClass 414,001-16,000 lbsClass 516,001-19,500 lbsClass 619,501-26,000 lbsClass 726,001-33,000 lbsClass 8>33,001 lbsThe rebate amount is determined by the total charging capacity of the chargers included in theapplication and the total purchase cost of the eligible equipment (tax and certain fees may beincluded). Each charging location can receive up to $700 per kilowatt (kW) installed chargingcapacity for equipment rebates or the total eligible cost of the project, whichever is lower.To be eligible for the equipment rebate, applicants must have at least one electric vehicleinfrastructure training program EVITP2-certified electrician on the installation crew of thefunded charging infrastructure, unless the project is required to meet PUC code 740.20 in whichadditional EVITP certified technicians are required to oversee the project. In addition, inalignment with California Public Contract Code 2601, at least 60 percent of the skilledjourneypersons employed to perform installation of the eligible equipment by every contractor2 Assembly Bill 841 (Ting, Chapter 372, Statutes of 2020)2PA2026-03and each of its subcontractors at every tier are graduates of a joint labor-managementapprenticeship program for EV infrastructure installation.3South Coast AQMD staff can connect awardees with a local training program if training isneeded on charging, operating, and maintaining charging equipment. Costs of training will not bededucted from the rebate.PROJECT COSTApplicants must provide cost information that specifies the amount of funding requested and thebasis for that request by including vendor quotes in the application. More than one quote isencouraged to determine the best cost estimate. Applicants need to inform vendors of the timeframe of the award process so that vendors can estimate prices based on the future/projectedorder/purchase date – this is important since funding requests and awards may not be revisedafter the Program closing date. When selecting vendors, applicants must ensure the materials willmeet Build American Buy America (BABA) provisions, see SECTION II – FUNDING &CONDITIONS.Purchase orders or other purchase commitments shall not be placed until after the award hasbeen approved by South Coast AQMD. Placing the equipment purchase order before theagreement is executed is at the risk of the applicants.Additionally, please provide only the costs directly related to the installation of the equipment.Any costs related to design, engineering, overhead or any other indirect costs are not eligible.REBATE AMOUNTEach charging station location is eligible to receive up to $700 per kW for the procurement costof eligible equipment, including tax and fees, and potentially associated installation costs. Therebates will be issued on a per-location basis. The rebate amount for an eligible project isdetermined by the total power rating that the chargers can provide during the operation of allproposed chargers. For example, a project with 10 charging connections each rated at 360kWwould have a total charging capacity of 3,600 kW, which can potentially receive a total rebate ofup to $2,520,000 or the total procurement cost of eligible equipment and potentially the cost ofinstalling the eligible equipment, whichever amount is lower.ELIGIBLE APPLICANTThe applicant must meet the following requirements to be eligible for a rebate:• Applicant must demonstrate land ownership on which the project will be located, or control itthrough a long-term lease, easement, or other legal arrangement, for the duration of theproject life.• Applicant must propose the charging station(s) within the boundaries of the two MSAs.3 Tax credits may be available: https://www.irs.gov/credits-deductions/prevailing-wage-and-apprenticeship-requirements & https://www.irs.gov/credits-deductions/alternative-fuel-vehicle-refueling-property-credit.3PA2026-03ELIGIBLE EQUIPMENT AND COSTFunding is available for DC Fast Chargers (DCFC) equipment where each connector mustsupport a power output of at least 250 kW. The DCFC-enabling equipment or components thatenable the function or are essential to the operation of the DCFC are also eligible as part of therebate. Potentially, associated installation costs of the eligible equipment can qualify for therebate. Installation costs must be solely for the eligible equipment. Any indirect installation costsare not eligible.The site where the DCFCs are installed must support Class 4 - 8 vehicles, which are defined inTable 1 above.4
- Commodity Codes
-
- NAICS 541330Engineering Services
- NAICS 541611Administrative Management and General Management Consulting Services
- NAICS 541618Other Management Consulting Services
- NAICS 541690Other Scientific and Technical Consulting Services
- NAICS 541990All Other Professional, Scientific, and Technical Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
EXT MOH | Sunnydale Phase 4 I...
EXT MOH | Sunnydale Phase 4 Infra (Demo & Abtmnt) Format : Sell
City and County of San Francisco
Bid Due: 7/27/2026
Galileo Academy of Science an...
Invitatin for bids: Galileo Academy of Science and Technology, Bay Street - Elevator
San Francisco Unified School District
Bid Due: 8/11/2026