WTP 16-inch Pump Control Valve and BW Tank Altitude Valve Replacement
Project Information
- Bid Title
- WTP 16-inch Pump Control Valve and BW Tank Altitude Valve Replacement
- Issuing Agency
- City of Antioch
- Location
- California
- Published Date
- Jan 5, 2026
- Closing Date
- Feb 5, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFB 720-0205-25A WTP
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: RFB 720-0205-25A WTP
Bid Title: WTP 16-inch Pump Control Valve and BW Tank Altitude Valve Replacement
Category: Public Works Bids Status: Open Description: REQUEST FOR BID, BID NO. 720-0205-25A, WTP 16” PUMP CONTROL VALVE AND BW TANK ALTITUDE VALVE REPLACEMENT
Publication Date/Time: 1/5/2026 12:00 AM Closing Date/Time: 2/5/2026 2:00 PM Related Documents: - Attachment Preview
-
REQUEST FOR BIDBID NO. 720-0205-25AWTP 16” PUMP CONTROLVALVE AND BW TANK ALTITUDEVALVE REPLACEMENTBID DUE DATE: FEBRUARY 5, 2026 at 2 PMRFB CONTRACT & SPECIFICATIONSPage 1 of 1 2KEEP THESE PAGES FOR YOUR RECORDSI. GENERAL CONDITIONS1. General Information - The Public Works Department of the City of Antioch, California, will receive bidresponses at its City Clerk's office located at 200 H Street, Antioch, CA 94509 on February 5, 2026 at 2pm.Questions relating to specifications or technical questions must be submitted via email to Marcus Woodlandat mwoodland@antiochca.gov. Bidders are NOT to pursue City staff by telephone or in person.2. Form of Bid - The bid shall be made on the attached bidder's proposal form. If the form is deemedinadequate, additional information may be submitted with the proposal, via an attachment ofcatalogs, drawings, photographs, or a letter. Letters repeating prices and details from the City'sspecifications must be omitted. Bids shall be made only on the designated bid form, properly executed, andenclosed in a sealed envelope bearing the name of the bidder, the bid number, bid due date, bid title, andDIR number. Forms are available and may be secured by prospective bidders at the City Clerk's office at200 H St. Street, Antioch, CA 94509. Bids shall be written in ink, computer generated, or by typewriter.Mistakes may be crossed out and corrections inserted adjacent thereto and must be initialed in ink by theperson signing the bid. Bids are to be verified before submission as they cannot be corrected or altered orsigned after bids are opened.3. Interpretation of Bids - Should a bidder find discrepancies in, or omissions from the specifications, orshould bidder be in doubt as to their true meaning, bidder shall submit a formal request to the PublicWorks Department for an interpretation thereof prior to the bid opening to the attention of MarcusWoodland at mwoodland@antiochca.gov. The person submitting the request shall be responsible for itsprompt delivery. Any interpretation of, or change in the proposed documents will be made only by anaddendum published on the City’s website, and shall become part of any contract awarded. The City will notbe responsible for any other explanation or interpretations.4. Addenda - Any addenda issued by the City during the time of bidding shall be covered in the bid and shallbe made a part of the contract. It is the bidder's responsibility to check the City of Antioch website, for anyaddenda that may have been issued prior to the bid/proposal due date. (https://www.antiochca.gov/rfps/)5. Bid Opening - Bids shall be delivered to the City Clerk's office located at 200 H St. Antioch, CA 94509 on orbefore the day and hour set for the opening of bids. A bidder may withdraw his bid, either personally or bywritten request, at any time prior to the scheduled time for opening of bids.6. Late Bids - Any bids received after the scheduled time of opening will be clocked in, but will not be opened orconsidered.7. No Bid - If a bid is not made, the bid form must be returned and the reason for not bidding stated; otherwise,the vendor's name will be removed from the bidders list. If a bid is submitted without an amount, it will not beconsidered.8. Award or Rejection - The bid will be awarded to the lowest responsive and responsible bidder offering thebest value to the City and will be announced by way of publishing to the City’s website(https://www.antiochca.gov/rfps/). Best value is based on all factors, including: cost (unit prices and totalprices); contractor’s ability, capacity and skill; ability to perform within the time required; character, integrity,reputation, judgment, experience and efficiency of contractor; quality of contractor’s performance on previouspurchases or contracts, if applicable; and the ability of the contractor to provide future maintenance, repair,parts and services, if applicable. If within the past two years, a contractor has had a contract terminated earlyby the City of Antioch then contractor is disqualified from bidding on any future projects for a two-year periodRFB CONTRACT & SPECIFICATIONSPage 2 of 1 2KEEP THESE PAGES FOR YOUR RECORDSfrom the date of termination.The City reserves the right to reject any or all bids, to accept or reject any one or more items of a bid, or towaive any minor irregularities or informalities in the bid. It is anticipated that all items will be purchased,however the City reserves the right to change quantities prior to the award. Estimated quantities are noguarantee of a certain quantity to be ordered by City. The City reserves the right to make the award to theoverall low bidder, or split the award amongst the bidders. If the bid is on an “all or nothing” basis, this mustbe stated on the bid form.For the purpose of evaluating bids for multiple awards, the sum of $175.00 is considered to be theadministrative cost to the City for issuing and administering each contract awarded. Individual awards will bemade for the items and combinations of items which result in the lowest aggregate price to the City, includingsuch administrative cost.9. Terms and Conditions - The bidder shall not change the wording on the specifications or conditions. Nowords or comments shall be added to the general conditions or detailed specifications. Any explanation oralternative offered shall be set forth in a letter attached to the front cover of the specifications. Alternativeswhich do not substantially comply with the City's specifications cannot be considered. Conditional bids cannotbe accepted.10. Brand Names- The make or brand and grade of the article on which the bid is submitted should be stated onthe bid form.11. Payment Terms - Must be indicated by filling in the proper blanks on the bid form. Cash discounts of less than20 days will be considered net. The standard terms at the City of Antioch are Net 30 days.12. FOB Point - It is understood that the bidder agrees to deliver FOB Destination, with no freight charges to theCity. All costs for packing, delivery, drayage, postage, freight, express, or for any other purpose are to beborne by the bidder.13. Approved Equal – Brand names and numbers, when used, are for reference to indicate the characteror quality desired. The use of the name of a manufacturer, or any special brand or make, in describing anyitem in the bid documents does not restrict bidders to that manufacturer or specific article. An equal of thenamed product will be given due consideration if literature is submitted with the bid showing that the productis of equal or better quality and utility to that specified by the City. Determination of acceptability of any productshall be solely at the City’s discretion.14. Tax - No bid shall include federal excise tax, inasmuch as the City is exempt per published IRS regulationsconcerning state/local governments. The City is obligated to pay applicable state sales or use taxes.15. Samples - When requested, bidders shall submit properly marked samples of the article(s) on which bid ismade to the City. Any sample submitted must be clearly marked in such a manner that the marking is fixed,so that the identification of the sample is assured. Such marking shall state (1) name of bidder, (2) number ofbid, and (3) item number. Samples, when required, must be furnished free of expense to the City, and if notdestroyed by tests, will upon request be returned at bidder's expense unless retained by City for futurecomparison.16. Inspection - All items furnished shall be subject to the inspection of the City, and unsuitable items may berejected. Defective items shall be made good by the vendor in a manner satisfactory to the City.17. Assignment - No assignment by the contractor or any contract to be entered into hereunder or of any partthereof, except of funds to be received thereunder by the contractor, will be recognized by the City unless suchRFB CONTRACT & SPECIFICATIONSPage 3 of 1 2KEEP THESE PAGES FOR YOUR RECORDSassignment has had the prior written approval of the City.18. Warranty - Terms of any warranty offered by the manufacturer or the bidder shall be included with the bid.Contractor warrants all work done and goods provided under this Agreement shall at the minimum: a) meet allconditions of the Agreement; b) shall be free from all defects in design, material and workmanship; and 3) shallbe fit for the purposes intended. If any defects occur within said 12 months following acceptance, Contractorshall be solely responsible for the correction of those defects.19. Timely Delivery – If indicated in the bid form, bidder shall indicate time of delivery as the number of calendardays following receipt of the order by the contractor to receipt of the goods or services by the City. Time ofdelivery may be a consideration in the award.Time is of the essence, and the purchase order is subject to termination for failure to deliver on time. Theacceptance by buyer of later performance with or without objection or reservation shall not waive the right toclaim damage for such breach nor constitute a waiver of the requirements for the timely performance of anyobligation remaining to be performed by the vendor.20. Liquidated Damages - If delivery does not occur on schedule it is understood that the City will suffer damage.It being impractical and infeasible to determine the amount of actual damage, it is agreed that the contractorshall pay to the City the sum of five hundred ($500.00) dollars per day for each calendar day delay in finishingthe contract.21. Termination for Default - The City may, by written notice of default to the vendor/contractor, terminate thecontract in whole or in part should the vendor/contractor fail to make satisfactory progress, fail to deliver withintime specified therein or fail to deliver in strict conformance to specifications and requirements set forth therein.In the event of such termination, the City reserves the right to purchase or obtain the supplies or serviceselsewhere, and the defaulting vendor/contractor shall be liable for the difference between the prices set forthin the terminated order and the actual cost thereof to the City. The prevailing market price shall be consideredthe fair repurchase price. If, after notice of termination of this contract under the provisions of this clause, it isdetermined for any reason that the Contractor was not in default under the provisions of this clause, the rightsand obligations of the parties shall be the same as if the notice of termination had been issued pursuant to theTermination for Convenience clause. The rights and remedies of City provided in this article shall not beexclusive and are in addition to any other rights and remedies provided by law or under resulting order.22. Termination for Convenience - The City may, by written notice stating the extent and effective date, terminateany resulting order for convenience in whole or in part, at any time. The City shall pay the vendor as fullcompensation for performance until such termination the unit or pro rate price for the delivered and acceptedportion, and a reasonable amount, as costs of termination, not otherwise recoverable from other sources bythe contractor as approved by the City, with respect to the undelivered or unaccepted portion of the order,provided compensation hereunder shall in no event exceed the total price. In no event shall the City be liablefor any loss of profits on the resulting order or portion thereof so terminated. The rights and remedies of Cityprovided in this article shall not be exclusive and are in addition to any other rights and remedies provided bylaw or under resulting order.23. Fiscal Year - Obligation for payment of any contract beyond the current fiscal year end is contingent upon theavailability of funding from which payment can be made. No legal liability shall arise for payment beyond June30 of the calendar year unless funds are made available for such performance.24. Equal Opportunity - Contractor shall not discriminate, on the basis of a person’s race, religion, color, nationalorigin, age, physical or mental handicap or disability, medical condition, marital status, sex, or sexualorientation or any other prohibited basis under federal or state law, against any employee, applicant forRFB CONTRACT & SPECIFICATIONSPage 4 of 1 2KEEP THESE PAGES FOR YOUR RECORDSemployment, subcontractor, bidder for a subcontract, or participant in, recipient of, or applicant for any servicesor programs provided by Contractor under this Agreement. Contractor shall comply with all applicable federal,state, and local laws, policies, rules, and requirements related to equal opportunity and nondiscrimination inemployment, contracting, and the provision of any services that are the subject of this Agreement, includingbut not limited to the satisfaction of any positive obligations required of Contractor thereby.Contractor shall include the provisions of this Subsection in any subcontract approved by the ContractAdministrator or this Agreement.25. Business License – The City of Antioch requires that any contractor doing business within the city limits musthold a valid City of Antioch Business License prior to merchandise delivery (by vendor) or services provided.26. Governing Law - This contract shall be construed and interpreted according to the laws of the State ofCalifornia with venue for any action under this Agreement in Contra Costa County, California.27. Liabilities -- Contractor shall indemnify, save and hold harmless from and defend the City, its officers, agentsand employees, against any and all claims, costs, demands, causes of action, suits, losses, expense or liabilityarising from, or alleged to have arisen, from any acts or omissions of Contractor, its agents, sub-contractors,officials or employees, in connection with the execution of the work covered by this Agreement, as it may beamended, except for the sole negligence or willful misconduct of City. This indemnification includes any claimthat the materials or equipment provided under this Agreement, or any tool, article or process used inmanufacture of such tools or equipment, constitutes an infringement of any patent issued by the United States.This entire indemnification provision shall survive termination or cancellation of this Agreement.28. Right to Audit -- The City of Antioch reserves the right to verify, by examination of vendors’ records, allinvoiced amounts when firm prices are not set forth in the purchase agreement.29. Assignment -- In submitting a bid to a public purchasing body, the bidder offers and agrees that if the bid isaccepted, it will assign to the purchasing body all rights, title and interest in and to all causes of action it mayhave under Section 4 of the Clayton Act (1 5 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2(commencing with Section 16700) of part 2 of Division 7 of the Business and Professions Code), arising fromthe purchases of goods, materials, or services by the bidder for sale to the purchasing body pursuant to thebid. Such assignment shall be made and become effective at the time the purchasing body tenders finalpayment to the bidder.30. Surety Bonds – The Bidder is required to submit a bidder’s bond if included on the Bid Form. Unless statedto the contrary in the Detailed Specifications, Contractor is required to provide the following surety bonds froman admitted and authorized surety in California in the full amount of the work to be performed:• Payment Bond• Performance Bond31. Prevailing Wage - Where labor is required for public work as part of this contract, pursuant to the provisionsof the Labor Code of the State of California, contractors shall pay no less than the minimum wages establishedby the Director of the Department of Industrial Relations of the State of California.To the extent applicable, Contractor shall comply with the requirements of the California Labor Codeincluding but not limited to hours of labor, nondiscrimination, payroll records, apprentices, workers'compensation and prevailing wages.No less than the general prevailing rate of per diem wages, and not less than the general prevailing rate ofper diem wages for holidays and overtime work, for each craft, classification or type of worker needed toexecute the work under this Agreement shall be paid to all workers, laborers and mechanics employed in theRFB CONTRACT & SPECIFICATIONSPage 5 of 1 2KEEP THESE PAGES FOR YOUR RECORDS
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
- NAICS 332911Industrial Valve Manufacturing
- NAICS 423830Industrial Machinery and Equipment Merchant Wholesalers
- NAICS 811310Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Westlake Relief Drain (WRD) R...
SZC14383 - Westlake Relief Drain (WRD) Rehabilitation Unit 5 - Ferndale to Obama
City of Los Angeles
Bid Due: 7/15/2026
J85 VALVE BUTTERFLY, NSN: 481...
Follow J85 VALVE BUTTERFLY, NSN: 4810-00-866-8132OK, PN: 123335-3 Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 7/15/2026