RFB Queets Generations Building Electric Vehicle Charging Equipment Installation
Project Information
- Bid Title
- RFB Queets Generations Building Electric Vehicle Charging Equipment Installation
- Issuing Agency
- Quinault Indian Nation
- Location
- Washington
- Published Date
- Jun 1, 2026
- Closing Date
- Jun 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: RFB Queets Generations Building Electric Vehicle Charging Equipment Installation
Category: Tribal Employment Rights Ordinance (TERO) Status: Open Description: The Quinault Indian Nation is seeking bids to install 4 Level II EV charging stations at the Queets Generations Building at 691 Jackson Heights Drive Forks, WA 98331. Contractor will provide all labor, materials and equipment.
SEE RELATED DOCUMENT BELOW
Publication Date/Time: 6/1/2026 12:00 AM Closing Date/Time: 6/15/2026 3:00 PM Contact Person: Due date: June 15, 2026, at 3:00 PM local time. Please send bids by e-mail to bids@quinault.org attention Cora Pope. Bids must be submitted by 3PM on Monday June 15, 2026. Late bids will be rejected.
Bidders should provide point-of-contact information including email to Lauren Macfarland, Environmental Protection Manager. Appointments for site visit or questions regarding this project can be made by calling the below contact.
Lauren Macfarland, Environmental Protection Manager
360.276.8211 Ext. 7332
360.640.5283
lauren.macfarland@quinault.org
Related Documents: - Attachment Preview
-
QUINAULT INDIAN NATIONOwnerPO Box 189, 1214 AALIS DriveTaholah, WA 98587REQUEST FOR BIDSLocation and legal address:EV Charging Stations Install691 Jackson Heights DriveForks, WA 98331The Quinault Indian Nation is seeking bids to install 4 Level II Electric Vehicle Charging Stations at theQuai’Tso Building in Queets. Contractor will provide all labor, materials and equipment. This is a fixed bidproject.Basic Scope• Contractor shall visit the site to become familiar with the project.• Contractor shall field verify all conditions• Set up any temporary safety barriers if needed• Install 4 Electric Vehicle Charging Stations• Clean up and haul all debris / material to approved landfill.• Provide network services (hard-wired)• Provide maintenance service contractEquipment Specification RequirementsEquipment must:Follow the Department of Ecology’s guidelines:https://apps.ecology.wa.gov/publications/summarypages/2402025.html• Be networked.• Include user interfaces that are legible in both daytime and nighttime conditions.• Be certified to operate outdoors and in extreme weather conditions.• Be certified by the Underwriters Laboratories, Inc. (UL), ETL listed or an equivalent certification.• Include adequate cord length, protection, and storage.• Have a minimum one-year manufacturer’s warranty. (Ecology encourages applicants to explore alonger warranty, when possible.)• Be installed by a qualified licensed professional according to all federal, state, and local rules,including applicable permitting and inspection requirements.• Meet Society of Automotive Engineers (SAE) J-1772 standard for EV charging plug connector andoperational requirements. Alternatives may be considered by Ecology.• Be capable of providing electric power at each plug at a minimum 9.0 kW (approximately 240V @40A).• Be Open Charge Point Protocol (OCPP) compatibleSubmission MethodDue date: June 15, 2026, at 3:00 PM local time.Please send bids by e-mail to bids@quinault.org attention Cora Pope. Bids must be submitted by 3PM onMonday June 15, 2026. Late bids will be rejected.Bidders should provide point-of-contact information including email to Lauren Macfarland, EnvironmentalProtection Manager. Appointments for site visit or questions regarding this project can be made by calling thebelow contact.Lauren Macfarland, Environmental Protection Manager360.276.8211 Ext. 7332360.640.5283lauren.macfarland@quinault.orgEvaluation CriteriaAll responses shall be evaluated with respect to the completeness of the information provided, support for allclaims made, and the overall approach taken. The following criteria shall be utilized in the technical evaluationof the consultant’s proposal.1. Firm Qualifications2. Experience with similar projects involving tribal, local government and/or other governmentalagencies, as well as regional experience3. Scope of services with clear project completion timelines, wages, and fee schedule for a fixed pricebid. Required completion date for project: April 30, 2027Reference Documents1. Exhibit A - AIA Document A105-2017 – Standard Short Form of Agreement Between Owner andContractor (Stipulated Fixed Sum)2. Exhibit B – Debarment FormMiscellaneous• Quinault TERO Prevailing Wages apply• Performance/Payment Bond is not required for this projectThis RFB does not commit QIN to award a contract, to pay any costs incurred in preparation of a response tothis invitation, or to procure or contract for services or supplies. Bidders will not offer any gratuities, favors oranything of monetary value to any employee, officer, or agent of the Nation for the purpose of influencingfavorable disposition toward either their proposal or any other proposal submitted as a result of this RFB. Allproposals submitted hereunder become the exclusive property of the Nation. The Nation reserves the right toaccept all or part of the bid, or to decline the whole bid.The successful bidder will sign the attached Contract documents, sign a Certification and Debarment Form,provide a W-9, submit certifications of required insurance coverage, and obtain a Quinault Indian Nationbusiness licenses for all firms/subcontractors doing work on the Quinault Reservation. Subcontracts must beapproved by the Quinault Indian Nation. The terms and conditions in the Quinault Indian Nation Contract maynot be amended, and bidder agrees to the terms and conditions set forth within.SafetyAt a minimum. all workers performing on-site construction work shall wear high visibility safety vests, hardhats and appropriate footwear, and shall wear safety goggles and gloves as appropriate for the work task theyare undertaking. Given the uncertain nature of the home and property, the Contractor should assume thatasbestos and other potentially harmful substances are present and wear appropriate respirators and/or masks.The Contractor shall furnish a copy of its safety plan prior to mobilization to site.Nation’s Tribal Employment (TERO)The Nation’s Tribal Employment Right Ordinance (TERO) provides the Nation’s Indian Preference policy thatapplies to this contract—see attached. Other TERO requirements include submission of a Compliance Plan andpayment of a fee prior to commencing work on the Quinault Indian Reservation. Every Contractor with aContract Sum of $10,000 or more, or more than one contract in a 12- month period and the aggregate sum ofthose contracts is $10,000 or more, shall pay a one-time fee of 1.75% of the total Contract Sum. Such fee shallbe paid by the Contractor. Contact Evelyn Kalama 360-276-8211 ext. 4805 EKalama@quinault.orgInsurance RequirementsContractor is required to provide proof of current Worker’s Compensation insurance with Washington State statutory limitsend Employer’s liability insurance. Minimum coverage $1,000,000 per occurrence. Contractor will provide proof ofCommercial General Liability Insurance stating adequate coverage for project. Carrier shall be rated A.M. Best’s Insurancerating of at least A or better. Minimum coverage: General Liability $1,000,000 per occurrence / $2,000,000 aggregate; ExcessLiability $5,000,000 per occurrence / $5,000,000 aggregate. Policies need to list site location, project name, city and state, andshall name the following parties as Additionally Insured and named Certificate Holders: Quinault Indian Nation, its electedofficials, officers, employees.Contractor shall carry Automotive Liability Insurance. Minimum coverage $1,000,000 combined single limit for hired andnon-owned vehicles with Personal Protection Insurance and Property Protection Insurance.PermitsContractor shall be responsible for all permitting and compliance with Quinault Indian Nation tribal codes priorto commencing work.RetainageThe Nation shall hold back a retainage in the amount of five percent (5%) of any and all payments made to theContractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessaryreleases from the State Department of Revenue and the State Department of Labor and Industries, and untilsettlement of any liens filed under chapter 60.28 RCW, whichever is later.BID SCHEDULENOTE: BIDS shall not include Washington State and local sales tax on all items delivered to the site on theQuinault Indian Reservation. Washington State B&O taxes do not apply to construction charges performedwithin the boundaries of the Quinault Indian Reservation. All other applicable taxes and fees may apply.BIDDERS ARE ADVISED TO REFER TO THE WASHINGTON STATE, DEPARTMENT OF REVENUE,INDIAN TAX GUIDE AT:http://dor.wa.gov/content/findtaxesandrates/retailsalestax/indians/indiantaxguide/default.aspx.The undersigned certify that they have examined the location of the project, and read and thoroughlyunderstand the plans, specifications, and contract governing the work embraced in this improvement or asmuch thereof as can be completed with the money available, in accordance with the said plans, specifications,contract, and the following schedule:BIDDER agrees to perform all the work described in the CONTRACT DOCUMENTS for the following lumpsum: NOTE: BIDS shall include all other applicable fees.ITEMBase BidDESCRIPTIONInstall 4 Level-II EV Charging Stations $AMOUNTTotal$Calendar day to CompleteDaysName of FirmNOTE: If bidder is a corporation, write State of Incorporation; if a partnership, give full names and addressesof all parties below.Signed by,Officials CapacityPrint NameAddressFederal Tax ID #Email address: __________________________®AIA Document A105® – 2017Standard Short Form of Agreement Between Owner andContractorAGREEMENT made as of the « » day of « » in the year « »(In words, indicate day, month and year.)BETWEEN the Owner:(Name, legal status, address and other information)« Quinault Indian Nation »« federally-recognized Indian tribe »«1214 Aalis Dr. »«PO Box 189 »« Taholah, WA 98587 »and the Contractor:(Name, legal status, address and other information)« »« »«»«»«»for the following Project:(Name, location and detailed description)Installation of 4 Level II Electric Vehicle Charging Stations at the Queets GenerationsBuilding«»«»The Architect:(Name, legal status, address and other information)In lieu of an Architech being named, the Owner’s Representative will perform theseduties«»«»«»The Owner and Contractor agree as follows.ADDITIONS AND DELETIONS:The author of this documenthas added informationneeded for its completion.The author may also haverevised the text of theoriginal AIA standard form.An Additions and DeletionsReport that notes addedinformation as well asrevisions to the standardform text is available fromthe author and should bereviewed.This document has importantlegal consequences.Consultation with anattorney is encouraged withrespect to its completionor modification.ELECTRONIC COPYING of anyportion of this AIA® Documentto another electronic file isprohibited and constitutes aviolation of copyright lawsas set forth in the footer ofthis document.AIA Document A105 – 2017. Copyright © 1993, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “AmericanInstitute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. Thisdraft was produced at 12:56:15 ET on 05/28/2026 under Order No.3104241570 which expires on 12/31/2026, is not for resale, is licensed for1one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.User Notes:(1752660057)
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
BID - DCYF - Echo Glen Emerge...
Project: BID - DCYF - Echo Glen Emergency Generator Project - REBID -
State Government of Washington
Bid Due: 7/07/2026
DCYF - Echo Glen Emergency Ge...
Solicitation Close Date: 07/07/26 Title: DCYF - Echo Glen Emergency Generator Project -
State Government of Washington
Bid Due: 7/07/2026