Solid Waste Pump Station 201 Improvements

Project Information

Bid Title
Solid Waste Pump Station 201 Improvements
Issuing Agency
Pinellas County
Location
Florida
Published Date
Mar 27, 2025
Closing Date
Apr 10, 2025
Government Level
State & Local
Status
Closed
Ref. #
25-0549-RFP-Design-Build
Original Source
Join to Access Full Details
Project Description


Project ID: 25-0549-RFP-Design-Build

Title: Solid Waste Pump Station 201 Improvements

Addenda: 0

Release Date: 3/27/2025

Due Date: 4/10/2025

Post Information
Posted At:Thu, Mar 27, 2025 12:29 PMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

The County intends to contract for design-build services associated with the Solid Waste Pump Station 201 Improvements project. Pinellas County Solid Waste's asset lift station 201 (Pump Station 201) needs improvements. Pump Station 201 at the Solid Waste Disposal Complex is 725 gallons per minute (gpm), 45 horsepower (hp), and a triplex lift station. The lift station utilized Flygt pumps and a Flygt-manufactured control panel. The control panel was designed and fabricated to operate a triplex lift station; however, only two pumps (Pump 1 and Pump 3) were installed in the wet well. The County has determined that a third pump will not be required in the future based on operational flows observed since the lift station was installed. Therefore, Pump 3 cycles two times for every time Pump 1 turns on. The county would like to have the control panel modified to allow Pump 1 and Pump 3 to cycle alternatively to minimize excessive wear and tear to Pump 3 and provide an even lifespan to the two pumps.


Wastewater discharged at the lift station through an 8-inch force main with wastewater flow is measured by an 8-inch magnetic flow meter installed downstream of the valve pit. In general, the lift station is working. However, the magnetic flow meter is not reading correctly, likely due to water sloshing back and forth across it when the pumps are turned off. In addition, the valves before and after the magnetic flow meter are non-operational and will require replacement.

Background

The Memorandum of Understanding (MOU) with the City of Pinellas Park requires the wastewater pH to be within a specific range. Also, the Waste-to-Energy Facility contract requires monitoring and metering of the wastewater discharge from the facility. Wastewater is discharged to the lift station through an 8-inch force main with wastewater flow measured by an 8-in magnetic flow meter installed downstream of the valve pit. The magnetic flow meter is not reading correctly, likely due to water sloshing back and forth across the meter when the pumps de-energize. This water action also negatively affects pH readings. In addition, the valves before and after the magnetic flow meter are non-operational and require replacement. The lift station utilizes Flygt pumps and a Flygt-manufactured control panel. The control panel was originally designed and fabricated to operate as a triplex (three-pump) lift station; however, only two pumps (Pump 1 and Pump 3) were installed.

Timeline
Release Project Date:
March 27, 2025
Question Submission Deadline:
April 4, 2025, 3:00pm
Submission Deadline:
April 10, 2025, 3:00pm
Commodity Codes
  • NAICS 237110Water and Sewer Line and Related Structures Construction
  • NAICS 562111Solid Waste Collection
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Palm River Areas 3, 5 and 6 P...

Project ID: 26-8671 Title: Palm River Areas 3, 5 and 6 Public Utilities

Collier County

Bid Due: 8/10/2026

Pressure Washing Services

Project ID: Title: Pressure Washing Services Addenda: 0 Release Date: 6/24/2026 Due Date:

City of Orlando

Bid Due: 7/30/2026