26-009 Prof. Engineering Services - Design of Sidewalk on E Maxwell St from N Hayne St to N 12th Ave
Project Information
- Bid Title
- 26-009 Prof. Engineering Services - Design of Sidewalk on E Maxwell St from N Hayne St to N 12th Ave
- Issuing Agency
- City of Pensacola
- Location
- Florida
- Published Date
- Jan 12, 2026
- Closing Date
- Jan 28, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: 26-009 Prof. Engineering Services - Design of Sidewalk on E Maxwell St from N Hayne St to N 12th Ave
Category: Requests for Qualifications (RFQ) Status: Open Description: Addendum One extends the submittal date to January 28, 2026.
The City of Pensacola is requesting sealed statements of interest and qualifications from professional architectural and engineering firms with experience in the following areas: Conceptual and Schematic Design, Design Development, Production of Contract Documents, Estimating, and other related tasks, with said services being used for the design of a sidewalk on East Maxwell St from N Hayne St to N 12th Ave. Consideration will be given to only those firms that are pursuant to law and that have been prequalified by FDOT to perform Work Type 3.1 Minor Highway Design.
Publication Date/Time: 12/10/2025 8:00 am Closing Date/Time: 1/28/2026 2:30 pm Related Documents: - Attachment Preview
-
CITY OF PENSACOLA, FLORIDAREQUEST FOR QUALIFICATIONSRFQ NO.: 26-009FDOT FPID No: 455241-1PROFESSIONAL ENGINEERING SERVICES FORDESIGN OF SIDEWALK ON EAST MAXWELL STREETFROM NORTH HAYNE STREET TO NORTH 12TH AVENUEThe City of Pensacola is requesting sealed statements of interest and qualificationsfrom professional architectural and engineering firms with experience in the followingareas: Conceptual and Schematic Design, Design Development, Production of ContractDocuments, Estimating, and other related tasks, with said services being used for thedesign of a sidewalk on East Maxwell St from N Hayne St to N 12th Ave. Considerationwill be given to only those firms that are pursuant to law and that have been prequalifiedby FDOT to perform Work Type 3.1 Minor Highway Design.Sealed and complete hardcopy statements of interest and qualifications with onesigned original and five (5) additional copies, plus one (1) complete and identicalelectronic copy (single PDF), must be received no later than January 13, 2026, 2:30P.M., Central time, at the following location.City Hall (lobby)222 West Main StreetPensacola, Florida, 32502Attention: PurchasingThe OUTER PACKAGING of the sealed submittal package shall identify therespondent, the RFQ title, and the RFQ number (whether hand-delivered, mailed, orvia UPS/FedEx or other courier service). Submittals received after closing time will notbe accepted. Multiple submittals from the same entity will not be accepted.Alternatively, electronic responses may be submitted to Demandstar or Central Bidding.Both sites require registration and varying fees for notifications and documentdownloads.Those submittals received will be opened and publicly read the following businessday (January 14, 2026, at 10:00 A.M., Central time) via Microsoft Teams at the followinglink*: Microsoft Teams RFQ opening.Specifications will be posted to the City’s website atwww.cityofpensacola.com/bids.aspx. Addenda will be posted to the City’s website.Proposers are responsible for obtaining addenda and are advised to check thewebsite frequently. There is no cost to view or download documents from the Citywebsite.Page 1 of 30At the conclusion of the selection process, a Notice of Intent to Award will be posted tothe City’s website at www.cityofpensacola.com/bids.aspx. Respondents are advised tocheck the website frequently.Any questions concerning the RFQ should be addressed and submitted in writing nolater than December 30, 2025, at 10:00 A.M., Central time, to:Dedria Lunderman, Purchasing ManagerCity of Pensacola222 W. Main StreetPensacola, FL 32502purchasing@cityofpensacola.comThe City of Pensacola adheres to the Americans with Disabilities Act and will makereasonable accommodations for access to City services, programs, and activities.Please email ADACoordinator@cityofpensacola.com or call (850) 436- 5600. Requestsmust be made at least 48 hours in advance of the event in order to allow the City time toprovide the requested services.This project is federally funded with assistance from the Florida Department ofTransportation (FDOT). By submitting a letter of response, the Consultant certifies thatthey are in compliance with FDOT Procedure No. 375-030-006 (Restriction onConsultants Eligibility to Compete for Department Contracts) and that no principal ispresently suspended, proposed for debarment, declared ineligible or voluntarilyexcluded from participation on this transaction by any Federal Department or Agency.The City reserves the right to accept or reject any or all submittals, to waive anysubmittal informalities and to re-advertise for submittals when deemed in the bestinterest of the City.Attest:Ericka L. BurnettCity ClerkCITY OF PENSACOLAD. C. ReevesMayorThe City of Pensacola provides equal access in employment and public services.*Participation in a Microsoft Teams meeting requires a microphone and speakers;however, webcams are optional. Participants may join the meeting either via aPC or Smartphone. Please be sure to check the system requirements at thefollowing link: Microsoft Teams System Requirements Check.)SECURITY NOTICEVisitors to City Hall are required to stay in the lobby unless otherwisedirected.Late submittals will not be accepted.Page 2 of 30RFQ, SUBMITTAL AND EVALUATION SCHEDULE (all dates subject to change)Advertise RFQDeadline for QuestionsDeadline Date for Receipt of SubmittalsDistribution of MaterialsWritten Submittal Ranking/ShortlistingOral Presentations/Recommendation for Contract AwardFinal Scores & Ranking Submitted to FDOT for ReviewRankings Presented to City Council for Selection and Approval to beginNegotiations12/10/2512/30/2501/13/2601/20/2601/29/2602/18/2602/19/2602/26/26INSTRUCTIONS AND GENERAL SPECIFICATIONSA. Sealed responses must be submitted in the proposal format outlined as part ofthese Instructions and General Specifications. Proposal documents include at aminimum:• Response in stated format• Required forms (included in Exhibit A)• Acknowledgement of addendaA. Submittals must be typed or printed. All corrections made by the respondent priorto the opening must be initialed and dated by the respondent. No changes orcorrections will be allowed after submittals are opened.B. The City of Pensacola is not liable for any costs incurred by any interested partyin responding to this RFQ.C. Notwithstanding anything else stated herein, the City reserves the right to modifythe RFQ documents, including the Agreement, by issuing addenda to be postedon the City’s website.D. These instructions, specifications, and statements accompanying the RFQ, theRFQ itself, and any addendum issued, shall be included in the Agreement that willbe entered into for this service.E. By responding to this solicitation, each Respondent warrants that it has not andwill not employ or retain any company or person, other than a bona fide employeeworking solely for the firm, to solicit or secure an agreement pursuant to thissolicitation and that it has not and will not pay or agree to pay any person,company, corporation, individual or firm, other than a bona fide employee workingsolely for the firm, any fee, commission, percentage, gift, or other considerationcontingent upon or resulting from the award or making of an agreement.Page 3 of 30City of PensacolaRequest for QualificationsDesign of Sidewalk on East Maxwell Streetfrom North Hayne Street to North 12th AvenueSection A PurposePensacola is the westernmost city in the Florida Panhandle and is situated on thenorthern Gulf Coast. It is the intent of this solicitation to select a firm to provide designengineering services for the design of an ADA accessible 6’ sidewalk with highemphasis crosswalks on East Maxwell Street for approximately 0.57 miles from NorthHayne Street to North 12th Avenue. The sidewalk will be located on the north sidewithin the City right-of-way (ROW). Due to ROW constraints on the western terminus,lane narrowing and curb reconstruction may need to occur to accommodate pedestrianfacilities. The western terminus also intersects with the north on-ramp onto Interstate110. As such, additional analysis of intersection geometry and realignment to ensuretraffic flow may be necessary.Section BScope of Service RequiredThe City, in conformance with the Consultants’ Competitive Negotiations Act (CCNA),Florida Statutes Section 287.055, and the purchasing policies and procedures of theCity of Pensacola, is soliciting statements of interest and qualifications from qualifiedprofessional engineering firms interested in providing professional services for thisproject, including the development of design plans, specifications, cost estimates, andcontract documents.The Work provided by the engineering firm may consist of the following:1. Surveying1. Prepare route survey for the construction limits as identified in the projectlimits map.2. Locate all above ground features and improvements.3. Collect topographic data and perform cross sections or profiles as neededto prepare the design of the sidewalk and lane repurposing.4. Identify which utilities exist within the corridor during the survey phase bycalling Sunshine 811. A copy of the Sunshine 811 “design” ticket listing allutility owners within the project limits shall be provided within 10 days ofthe Notice to Proceed (NTP)5. Under Ground Utilities - Designation includes 2-dimensional collection ofexisting utilities and selected 3-dimensional verification as needed fordesignation. Location includes non- destructive excavation to determinesize, type and location of existing utility, as necessary for final 3-dimensional verification. Survey includes collection of data on points asneeded for designates and locates.Page 4 of 306. Perform field location (2-dimensional) of maintained R/W limits as definedby respective authorities.7. Perform field location (2-dimensional) of jurisdiction limits as defined byrespective authorities.2. Geotechnical Investigation1. Perform field work and laboratory investigations as needed to guidedesign and ensure all infrastructure is structurally sound andconstructable.3. Engineering1. Perform design and prepare plans for corridor improvements along theproject limits as identified in the FDOT Program Agreement. All work shallbe prepared with English units in accordance with the latest editions ofstandards and requirements utilized by the FDOT which include, but arenot limited to, publications such as:A. The Florida Green BookB. The Florida Department of Transportation Design Manual (FDM).C. The FDOT Standard Plans for Road and Bridge Construction.D. The Manual on Uniform Traffic Control Devices (MUTCD).E. The Americans with Disabilities Act (ADA).2. Prepare Traffic Control Plan as necessary to accommodate construction ofsidewalk.3. Prepare design documentation and provide all the services necessary tofulfill the design of the project including, plan and profiles, curb details,cross sections, signing & pavement, and signalization.4. Perform a Field Review with plans in hand after 60% Review commentsare received by City and FDOT.5. Develop accurate quantities and the supporting documentation incomputation booklets.6. Prepare contract documents, technical specifications and plans.7. Identify all existing utilities in the plans. Coordinate with all utilitycompanies during the design process. Distribute all plans, conflictmatrixes and changes to affected utility owners. Make sure thisinformation is properly coordinated and documented. Certify that allnecessary arrangements for utility work on this project have been madeand will not conflict with the physical construction schedule.8. Field Reviews: The Consultant shall make as many trips to the projectsite as required to obtain necessary data for all elements of the project.9. Technical Meetings: The Consultant shall attend all technical meetingsnecessary to execute the Scope of Services of this contract. TheConsultant shall prepare, and submit to the City’s Project Manager forreview, the meeting minutes for all meetings attended by them. Themeeting minutes are due within five (5) days of attending the meeting.10. Quality Assurance Quality Control (QAQC): It is the Consultant'sresponsibility to independently and continually QC their plans and otherPage 5 of 30
- Commodity Codes
-
- NAICS 541330Engineering Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
DIVISION OF REAL ESTATE DEVEL...
Notice: 30750278 Notice of Bid/Request for Proposal Department: DEPARTMENT OF MANAGEMENT SERVICES View
Florida Department of State
Bid Due: 9/01/2026
Advertisement Detail Department of Transportation Invitation to Negotiate Sponsor-A-Highway Program Advertisement Number: ITN-DOT-07/08-8001-SM-TQ/A3
State Government of Florida
Bid Due: 7/08/2080