HVAC Improvements (Phase 1) - To provide HVAC improvements (Phase 1) at a Judicial Branch location in Waterbury, Connecticut.
Project Information
- Bid Title
- HVAC Improvements (Phase 1) - To provide HVAC improvements (Phase 1) at a Judicial Branch location in Waterbury, Connecticut.
- Issuing Agency
- State of Connecticut Judicial Branch
- Location
- Connecticut
- Published Date
- Apr 10, 2026
- Closing Date
- May 14, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 02-2610
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Due Date Bid No Pre-Bid Date Description May 14, 2026
11:30 A.M.02-2610 Apr 22, 2026 HVAC Improvements (Phase 1) - To provide HVAC improvements (Phase 1) at a Judicial Branch location in Waterbury, Connecticut.
MANDATORY PRE-BID CONFERENCE: Wednesday, April 22, 2026 at 11:00 a.m.
BID LIMITED TO DAS PREQUALIFIED VENDORS ONLY
Click Here to View Project Manual
Click Here to View Project Drawings
Commodity Class: 022 - Attachment Preview
-
PROJECT MANUALAPC PHASE 1 IMPROVEMENTSATWATERBURY SUPERIOR COURT400 GRAND STREETWATERBURY, CONNECTICUT 06702HON. RAHEEM L. MULLINSCHIEF JUSTICEHON. ELIZABETH A. BOZZUTOCHIEF COURT ADMINISTRATORSTATE OF CONNECTICUTJUDICIAL BRANCH FACILITIES90 WASHINGTON STREETHARTFORD, CONNECTICUT 06106Judicial Branch PN# JB25-017ENGINEER:H. F. LenzEngineer’s PN# 2025-1648.01January 12, 2026SECTION 00 0105 – SEALS PAGEENGINEER:H. F. Lenz(Seal and Signature)(Seal and Signature)(Seal and Signature)Architect Professional Certi-fication:I hereby certify that thesedocuments were prepared orapproved by me and that I ama duly registered Architect.(Print Consultant Name)License No.Expiration DateStructural Engineer Profes-sional Certification:I hereby certify that thesedocuments were prepared orapproved by me and that I ama duly registered ProfessionalEngineer.(Print Consultant Name)License No.Expiration DateMechanical Engineer Profes-sional Certification:I hereby certify that thesedocuments were prepared orapproved by me and that I ama duly registered ProfessionalEngineer.Scott Kraynak(Print Consultant Name)31314License No.01/31/2026Expiration DateEND OF SECTION 00 0105(Seal and Signature)(Seal and Signature)(Seal and Signature)SEALS PAGESECTION 00 0105PAGE 1 of 1Civil Engineer ProfessionalCertification:I hereby certify that thesedocuments were prepared orapproved by me and that I am aduly registered ProfessionalEngineer.(Print Consultant Name)License No.Expiration DateElectrical Engineer Profes-sional Certification:I hereby certify that thesedocuments were prepared orapproved by me and that I am aduly registered ProfessionalEngineer.Scott Kraynak(Print Consultant Name)31314License No.01/31/2026Expiration DateFire-Protection EngineerProfessional Certification:I hereby certify that thesedocuments were prepared orapproved by me and that I am aduly registered ProfessionalEngineer.(Print Consultant Name)License No.Expiration DateH. F. Lenz2025-1648.01JUDICIAL BRANCHAPC PHASE 1 IMPROVEMENTSJB25-017SECTION 00 0110 – TABLE OF CONTENTSSection No.Title00 00 0000 01 0500 01 1000 01 1500 01 20Project Manual CoverSeals PageTable of ContentsList of Drawing SheetsProject Team List01 10 0001 21 0001 22 0001 23 0001 25 0001 26 0001 29 0001 31 0001 32 0001 32 1001 33 0001 35 1601 40 0001 40 0101 50 0001 60 0001 73 0001 77 0001 78 2301 78 39DIVISION 01 GENERAL REQUIREMENTSSummary of WorkAllowancesUnit PricesAlternatesSubstitution ProceduresContract Modification ProceduresPayment ProceduresProject Management and CoordinationConstruction Progress DocumentationPhotographic DocumentationSubmittal ProcedureAlteration Project ProceduresQuality RequirementsStatement of Special InspectionsTemporary Facilities and ControlsProduct RequirementsExecutionCloseout ProceduresOperation and Maintenance DataProject Record Documents02 41 19DIVISION 02 EXISTING CONDITIONSSelective DemolitionTABLE OF CONTENTSSECTION 00 0110PAGE 1 of 2Page Count Not Used1□1□2□1□1□5□3□-X-X4□3□5□10□7□3□8□6□7□-X10□7□10□6□9□4□5H. F. Lenz2025-1648.01JUDICIAL BRANCHAPC PHASE 1 IMPROVEMENTSJB25-01707 84 1307 84 4307 92 00DIVISION 07THERMAL AND MOISTURE PROTECTIONPenetration FirestoppingJoint FirestoppingJoint SealantsTABLE OF CONTENTSSECTION 00 0110PAGE 2 of 2656DIVISION 23 - HVAC23 05 00 Common Work Results for HVAC6723 05 13 Common Motor Requirements HVAC Equipment723 05 16 Expansion Fittings and Loops for HVAC Piping1423 05 19 Meters and Gages for HVAC Piping823 05 29 Hangers & Supports HVAC Piping Ducts & Equipment2023 05 48 Vibration Controls for HVAC1423 05 53 Identification for HVAC823 05 93 Testing Adjusting and Balancing for HVAC4623 07 19 HVAC Piping Insulation2323 08 00 Commissioning for HVAC and Plumbing1323 09 00 Instrumentation and Control for HVAC11623 23 00 Refrigerant Piping1523 67 00 Variable Frequency Motor Controllers or Drives1523 81 23 Computer Room Air Conditioners and Condensers13DIVISION 26 ELECTRICAL26 05 00 Common Work Results for Electrical3426 05 19 Low Voltage Electrical Power Conductors Cables726 05 26 Grounding and Bonding for Electrical526 05 29 Hangers and Supports for Electrical726 05 33 Raceways and Boxes for Electrical1226 05 44 Sleeves and Sleeve Seals for Electrical426 05 53 Identification for Electrical526 27 26 Wiring Devices926 28 16 Enclosed Switches and Circuit Breakers4END OF SECTION 00 0110H. F. Lenz2025-1648.01JUDICIAL BRANCHAPC PHASE 1 IMPROVEMENTSJB25-017SECTION 00 0115 – LIST OF DRAWING SHEETSGENERAL PROJECT INFORMATIONCover SheetPLUMBINGP201Data Center Floor Plans Demo and New Work PlumbingMECHANICALM001 General Notes, Symbols MechanicalM002 Abbreviations MechanicalM101 Ground and Data Center Floor Plans Demolition MechanicalM201 Ground and Data Center Floor Plans New Work MechanicalM601 Details MechanicalM701 Schedules MechanicalELECTRICALE001Legend, Abbreviations, and General Notes ElectricalE101Ground / Second Floor Plans Demolition ElectricalE201Ground / Second Floor Plans New Work ElectricalE701Panel SchedulesDRAWING LISTSECTION 00 0115PAGE 1 of 1END OF SECTION 00 0115H. F. Lenz2025-1648.01JUDICIAL BRANCHAPC PHASE 1 IMPROVEMENTSJB25-017
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
New Haven Harbor Improvement ...
Follow New Haven Harbor Improvement Dredging, New Haven, CT Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 7/10/2026
Merryall Road Roadway Reconst...
Project ID: Title: Merryall Road Roadway Reconstruction & Improvement Project, State Project #0095-0261
Town of New Milford
Bid Due: 7/16/2026