Design Build (DB) North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades, Boston and Cambridge, MA
Project Information
- Bid Title
- Design Build (DB) North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades, Boston and Cambridge, MA
- Issuing Agency
- Massachusetts Bay Transportation Authority
- Location
- Massachusetts
- Published Date
- Jan 28, 2025
- Closing Date
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Design Build (DB) North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades, Boston and Cambridge, MAProject Description
MBTA Contract No. H32CN01
The purpose of the North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades Project is to replace the Draw One Bridge, the Signal Tower A, and associated MBTA track and signal infrastructure. The existing Draw One Bridge consists of two adjacent two-track bridge spans crossing the Charles River. Signal Tower A is located just north of the Draw One Bridge, east of the tracks. Due to the deteriorated condition of the building, a temporary control tower was built in 2018. Conduits below grade connect the temporary control tower to equipment in the adjacent Signal Tower A.
Scope of Work:
The scope of work includes design and construction for:
Staged demolition of the existing draw bridges, approach spans, fendering, and Tower A.
New movable bridge structures carrying six tracks total, including replacement of the north and south trestles and fender system.
Trackwork and associated signals to connect the new bridge tracks to the mainline tracks north of Tower A and the existing station tracks, including reconstruction of direct fixation and platform modifications where required.
Track improvements extending out approximately 1.5 miles from North Station.
Raising and modifying the North Bank Bridge to accommodate the new track alignment.
A new Tower A building, positioned to best serve operation of the proposed new structure. Existing controls would be relocated from the temporary control tower to the new Tower A building.
Replacement of up to three sets of Signal Instrument Houses (SIHs) and upgrades for all wayside devices, cables, and infrastructure serving the existing Draw One Bridge.
New North Station Platform F will be constructed, tying into an existing partial platform, to serve new Station Tracks 11 and 12.
New drainage systems, including water quality structures and new outfalls, on each trestle. - Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
- NAICS 541330Engineering Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RFQ 2027-04 Crew Rate for Cem...
RFQ 2027-04 Crew Rate for Cemetery Internment Prep Work Bid No. 2027-04 2027-04
Town of Winthrop
Road Maintenance Construction...
Road Maintenance Construction FY2027 & FY2028 The original Bid document has been replaced
Town of Spencer
Bid Due: 7/09/2026