RFP-Eagles View Elementary Playground & Soccer Field Improvement Project
Project Information
- Bid Title
- RFP-Eagles View Elementary Playground & Soccer Field Improvement Project
- Issuing Agency
- City of Unalaska
- Location
- Alaska
- Published Date
- Mar 27, 2026
- Closing Date
- Apr 13, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
title bid/rfp closing date bid/rfp status files view RFP-Eagles View Elementary Playground & Soccer Field Improvement Project Mon 4/13/26 Open - accepting bids and proposals View Details - Attachment Preview
-
CITY OF UNALASKARequest for ProposalsEagles View Elementary Playground & Soccer Field Improvement ProjectCity of Unalaska- Parks, Culture & Recreation – Eagles View Elementary school1. Project OverviewThe City of Unalaska is requesting proposals from qualified contractors for the Eagles View ElementaryPlayground and Soccer Field Improvement Project.This project will involve the reconfiguration of three (3) existing playground areas into two (2) updatedplaygrounds and the upgrade of the existing soccer field to artificial turf with associated drainage andedging improvements.The goal of this project is to modernize playground facilities, improve safety and accessibility, andprovide a durable all-weather soccer field for school and community use.The project is located at Eagles View Elementary School in Unalaska, Alaska.Substantial completion is required by August 10, 2026.2. Project Scope of WorkThe contractor shall provide all labor, materials, equipment, supervision, and services necessary tocomplete the project in accordance with the project plans, specifications, and manufacturer installationrequirements.Work includes, but is not limited to, the following:Site Protection and Security1. Furnish and install temporary security fencing and site protection measures as necessary toprevent theft, vandalism, or injury during construction.2. Protect existing site infrastructure including fencing, pavement, signage, and structures.The contractor shall be fully responsible for repair or replacement of any site elementsdamaged during construction.1Soccer Field Improvements3. Remove and properly dispose of the organic layer from the existing soccer field.4. Perform grading and preparation of the field subgrade.5. Install subgrade drainage infrastructure in accordance with the project plans.6. Install concrete curb edging and nailer boards required for artificial turf installation.7. Install wear course material in preparation for the installation of owner-supplied artificial turf,which will be installed by others.Playground Site Preparation8. Perform site grading and subgrade preparation for playground areas in accordance with theplans.9. Install required drainage infrastructure, gravel base materials, and curbing.Concrete Work10. Construct new concrete curbing and edging in accordance with the project plans.Playground Equipment Installation11. Layout and install owner-furnished playground equipment and site furnishings in accordancewith:• Project plans• Manufacturer installation requirements• Applicable playground safety standards.Playground Surfacing12. Install owner-furnished interlocking playground tile surfacing in accordance with manufacturerspecifications and project plans.Landscaping and Restoration213. Hydroseed and restore all disturbed lawn areas resulting from construction activities.Material Testing14. Contractor shall provide third-party material testing, including:• Subgrade compaction testing to 95% compaction in 6-inch lifts• Concrete testing for 3500 PSI concrete.Construction Survey15. Contractor shall provide construction surveying and layout services necessary to construct theproject in accordance with the project plans.3. Contractor ResponsibilitiesThe selected contractor shall:• Provide all required labor, supervision, materials, and equipment• Coordinate work with the City of Unalaska and project stakeholders• Follow all manufacturer installation requirements• Comply with all applicable building, safety, and accessibility codes• Maintain a safe and secure work site• Maintain construction schedule to meet the August 10, 2026 completion deadline4. Applicable StandardsAll work shall comply with applicable standards including but not limited to:• ASTM Playground Safety Standards• CPSC Public Playground Safety Handbook• ADA Accessibility Guidelines• Manufacturer installation requirements• Applicable State of Alaska and City of Unalaska construction standards.35. Proposal RequirementsProposals shall include the following:• Contractor qualifications and experience• Relevant playground or park construction projects• Project approach and methodology• Construction schedule• Cost proposal• References for similar completed projects• Proof of required licensing and insurance6. Evaluation CriteriaProposals will be evaluated based on:• Contractor qualifications and experience• Experience with playground installation and site work• Project schedule and ability to meet completion deadline• Cost proposal• References and past project performance7. General notes• All work shall be in conformance with 2020 AK DOT Standard Specifications.• Contractor is responsible for protecting existing pavement, landscaping, and structuresfrom damage during installation and for repairing or replacing site elements damagedduring installation.• Contractor is responsible for providing work area fencing, maintaining pedestrian safety,and providing signage during construction. 2. Utilities: Contractor is responsible forlocating and avoiding existing utilities above and below ground during constructionactivities. It is the contractor's responsibility to order utility locates prior to breakingground and to repair or replace utilities damaged during construction. 3. This drawing4shall not be altered in any way. If changes are required, please contact your GreatWestern Recreation sales representative.• It is the contractor's responsibility to verify and maintain all C.P.S.C. playground safetyrequirements for heights, clearances, and distances related to equipment, safetysurfacing, shade structures, and materials. Installation of concrete curb and bike trail byothers after installation of shade structure.• Smooth out, topsoil, and seed all non-paved areas disturbed during construction.7. Project TimelineRFP Release: March 13, 2026Proposal Deadline: April 13, 2026Contract Award: April 27, 2026Construction Start: June 1, 2026Substantial Completion: August 10, 20268. Submission Instructions and DeadlineProposals must be received by the Unalaska City Clerk no later than 5:00 p.m. Alaska Time on Monday,April 13, 2026. Proposals may be delivered via email, U. S. Mail, other delivery service or by hand delivery.Late submissions will not be considered.City ClerkCity of Unalaska43 Raven WayP. O. Box 610Unalaska, AK 99685Email: emagdaong@unalaska.govCONTACT INFORMATION: For questions or further information about this RFP, please contact:Jolene LongoBusiness and Operations ManagerCity of UnalaskaParks, Culture & RecreationP. O. Box 610Unalaska, Ak 99685(907) 581-12975
- Commodity Codes
-
- NAICS 237990Other Heavy and Civil Engineering Construction
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RFP 26-VSW-MNT-053 Minto Wate...
RFP 26-VSW-MNT-053 Minto Water Source Improvements The State of Alaska, Department of Environmental
State Government of Alaska
Bid Due: 7/20/2026
Construct Household Hazardous...
Project: Construct Household Hazardous Waste Facility Ref. #: 27-001B Type: ITB Status: Open
Matanuska-Susitna Borough
Bid Due: 7/06/2026