Pond 13 Levee Improvements at NTP
Project Information
- Bid Title
- Pond 13 Levee Improvements at NTP
- Issuing Agency
- Terrebonne Parish
- Location
- Louisiana
- Published Date
- Dec 10, 2025
- Closing Date
- Jan 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- Bid 24-POL-21
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number Description Closing Date Related Documents
Bid 24-POL-21
Pond 13 Levee Improvements at NTP
01/15/2026 2:00 pm
Specifications
Plans
- Attachment Preview
-
Pond 13 Levee Improvements at the North Treatment PlantTPCG Project No. 24-POL-21T. Baker Smith Project No. 2024.0445TERREBONNE PARISH CONSOLIDATED GOVERNMENTPROJECT MANUALFORPARISH PROJECT NO. 24-POL-21POND 13 LEVEE IMPROVEMENTSAT THE NORTH TREATMENT PLANTJASON W. BERGERON- PARISH PRESIDENTTERREBONNE PARISH COUNCIL MEMBERSBRIEN PLEDGER(1)CARL “CARLEE” HARDING(2)CLAYTON “C.J.” VOISIN, JR.(3)JOHN AMEDEÉ(4)CHARLES “KEVIN” CHAMPAGNE(5)CLYDE HAMNER(6)DANIEL “DANNY” BABIN(7)“KIM” CHAUVIN(8)STEVE TROSCLAIR(9)Prepared By:T. Baker Smith, LLC12/2/2025Jack Denton Graham IV, P.E.LA License No. 46385Pond 13 Levee Improvements at the North Treatment PlantTPCG Project No. 24-POL-21T. Baker Smith Project No. 2024.0445GENERAL TABLE OF CONTENTSPage No.SECTION A - INVITATION TO BIDDERS............................................................................ A-4SECTION B - INSTRUCTION TO BIDDERS .........................................................................B-11.0 Defined Terms .........................................................................................B-12.0 Copies of Bidding Documents .................................................................B-23.0 Examination of Contract Documents and Site.........................................B-24.0 Interpretations and Addenda ....................................................................B-45.0 Bid Security .............................................................................................B-56.0 Contract Time ..........................................................................................B-57.0 Liquidated Damages ................................................................................B-68.0 Substitute Material and Equipment of "Or-Equal" Items ........................B-69.0 Proposal Document Forms.......................................................................B-610.0 Preparation and Submission of Bids ........................................................B-611.0 Modification and Withdrawal of Bids .....................................................B-812.0 Opening of Bids .......................................................................................B-413.0 Bids to Remain Open ...............................................................................B-914.0 Award of Contract....................................................................................B-9SECTION C – PROPOSAL FORMS.........................................................................................C-1Louisiana Uniform Public Works Bid Form........................................................C-1Unit Price Form....................................................................................................C-2SECTION D -Low Bidder Additional Information and Documentation ................................. D-115.0 Due Within 10 Days From Opening Of Bid ........................................... D-116.0 Due Within 10 Days Of Receipt Of Notice Of Award ........................... D-4E-Verification Form (Sample) ............................................................................ D-5Criminal Attestation Affidavit (Sample) ............................................................ D-6SECTION E- PERMITSSECTION F - STANDARD FORM OF AGREEMENT BETWEENOWNER AND CONTRACTOR ......................................................................... F-1Article 1 Work .................................................................................................. F-1Article 2 Engineer ............................................................................................. F-1Article 3 Contract Time .................................................................................... F-1Article 4 Contract Price..................................................................................... F-2Article 5 Payment Procedure ............................................................................ F-2Article 6 Contractor's Representations.............................................................. F-3Article 7 Miscellaneous .................................................................................... F-3Article 8 Contract Documents........................................................................... F-4SECTION G - CONTRACTOR'S AFFIDAVIT ....................................................................... G-1iPond 13 Levee Improvements at the North Treatment PlantTPCG Project No. 24-POL-21T. Baker Smith Project No. 2024.0445SECTION H - PERFORMANCE BOND ................................................................................. H-1SECTION I - GENERAL CONDITIONS................................................................................... I-1Article 1 Definitions........................................................................................ I-1Article 2 Preliminary Matters ......................................................................... I-4Article 3 Contract Documents; Intent, Amending, Re-use ............................. I-6Article 4 Availability of Lands; Physical Conditions Ref. Points .................. I-8Article 5 Bonds and Insurance ......................................................................I-13Article 6 Contractor's Responsibilities......................................................... 1-23Article 7 Other Work .................................................................................... I-34Article 8 Owner's Responsibilities ................................................................ I-36Article 9 Engineer's Status During Construction .......................................... I-37Article 10 Changes in the Work......................................................................I-40Article 11 Change in Contract Price ............................................................... I-42Article 12 Change of Contract Time...............................................................I-49Article 13 Warranty and Guarantee; Test & Inspections;Correction, Removal or Acceptance of Defective Work ...............I-51Article 14 Payments to Contractor and Completion ....................................... I-55Article 15 Suspension of Work & Termination .............................................. I-61Article 16 Dispute Resolution.........................................................................I-64Article 17 Miscellaneous ................................................................................ I-65Exhibit "B" Quality Control Daily Reports ....................................................... I-67SECTION J – SPECIAL PROVISIONS.....................................................................................J-11.1Location of Work.............................................................................J-11.2Work to be Done..............................................................................J-11.3Construction Access and Transportation .........................................J-11.4Flood Protection...............................................................................J-11.5Definition of Applicable Separate Specifications............................J-11.6Sanitary Arrangements.....................................................................J-21.7Construction Stakes, Lines & Guides ..............................................J-21.8Changes in Elevation and Locations................................................J-31.9Protection of Public Facilities..........................................................J-31.10Cleaning Site....................................................................................J-41.11Limits of Construction .....................................................................J-41.12Health and Safety Plan and Inspections...........................................J-41.13Work Plan ........................................................................................J-51.14Progress Schedule ............................................................................J-51.15Daily Progress Reports ....................................................................J-61.16Addresses for Document Delivery...................................................J-61.17Commencement and Completion of Work ......................................J-61.18Submittals ........................................................................................J-71.19As-Built Drawings ...........................................................................J-71.20Quantities for Payment ....................................................................J-81.21Bonds and Insurance ........................................................................J-8iiPond 13 Levee Improvements at the North Treatment PlantTPCG Project No. 24-POL-21T. Baker Smith Project No. 2024.04451.22Borrow Source .................................................................................J-81.23Aggregates .......................................................................................J-81.24Other Requirements .........................................................................J-81.25Hurricane Plan .................................................................................J-8SECTION K – TECHNICAL SPECIFICATIONS ................................................................... K-1Section 001 Mobilization ................................................................................... K-2Section 002 Degrassing/Preparation of Existing Embankment ......................... K-3Section 003 Removal of Structures and Obstructions ....................................... K-4Section 004 Reserved......................................................................................... K-6Section 005 Reinforced Structural Concrete...................................................... K-7Section 006 Class II Base Course ...................................................................... K-8Section 007 Steel Pipe Barriers.......................................................................... K-9Section 008 PZ-22 Sheet Pile .......................................................................... K-10Section 009 Embankment ................................................................................ K-11Section 010 Seeding and Fertilizing ................................................................ K-16Section 011 Aggregate Surface Course ........................................................... K-19Section 012 Class “D” Geotextile Fabric......................................................... K-21Section 013 Construction Layout..................................................................... K-23Section 014 Construction Site Survey ............................................................. K-25iiiPPoonndd 1133 LLeevveeee IImmpprroovveemmeennttss aatt tthhee NNoorrtthh TTrreeaattmmeenntt PPllaannttTTPPCCGG PPrroojjeecctt NNoo.. 2244--PPOOLL--2211TT.. BBaakkeerr SSmmiitthh PPrroojjeecctt NNoo.. 22002244..00444455SECTION AINVITATION TO BIDDERS
- Commodity Codes
-
- NAICS 237990Other Heavy and Civil Engineering Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Bid Number Description Date Issued Bid Open Date/Time 50017-D2600050 Window Replacements Non-Mandatory Pre-Bid
State Government of Louisiana
Bid Due: 7/08/2026
Re-Bid #0004 Chiller Replacement
Bid Number Description Date Issued Bid Open Date/Time 50014-0004 Re-Bid #0004 Chiller Replacement
State Government of Louisiana
Bid Due: 7/22/2026