CONTRACT NO. C211 - FEMA SANDY POWER SUPPLY AND PLANT WIDE PROJECT
Project Information
- Bid Title
- CONTRACT NO. C211 - FEMA SANDY POWER SUPPLY AND PLANT WIDE PROJECT
- Issuing Agency
- Bergen County
- Location
- New Jersey
- Published Date
- Feb 4, 2026
- Closing Date
- Mar 25, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- BCUA-25-C211
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project: CONTRACT NO. C211 - FEMA SANDY POWER SUPPLY AND PLANT WIDE PROJECTRef. #: BCUA-25-C211Department: BC Utilities AuthorityType: RFBStatus:OpenOpen Date: Dec 24th 2025, 9:00 AM ESTQuestions Due Date: Feb 23rd 2026, 3:00 PM ESTClose Date: Mar 25th 2026, 3:00 PM EDT
Project Description: A. The Work is located in Little Ferry, New Jersey at the Bergen County Utilities Authority Little Ferry Water Pollution Control Facility (BCUA LFWPCF) near the intersection of Empire Blvd and Mehrhof Road.
B. The Work to be performed under Contract No. C211 – FEMA Sandy Power Supply and Plant Wide Project includes, furnishing all labor, materials, equipment and incidentals required to complete the Power Supply, Floodwall and Plantwide Improvements in their entirety as shown on the Contract Documents and as specified herein.
C. This project consists of restoration and mitigation of power supply and plantwide systems throughout the Little Ferry Water Pollution Control Facilities. The power supply flood mitigation measures also include elevating, replacing and flood proofing major electrical components and constructing elevated platforms above the 500 year flood elevation at the Main Switchyard, Main Switchgear Building, six critical Substations (No. 1 through 6), replacing existing feeders, existing cables and existing duct banks, constructing a second story on and reinforcing the Main Switchgear building, constructing parallel duct bank, and performing other related activities like installation of fencing, gates, stairs, and concrete pads.
D. The proposed plantwide scope of work includes the installation of flood walls and flood barriers, dry flood proofing wall apertures, sealing pipe penetrations, raising and replacing existing electrical equipment, and replacing mechanical equipment with submersible type equipment which are all better suited for future flooding conditions. This work impacts the following locations: Main Pump Buildings No. 1 and 2, Primary Sludge Pumping Stations No. 1 through 4, Grit Building, Secondary Sludge Pumping Stations No. 1 through 4, Dewatering Building, Sludge Storage Building, the Control Building, the Administrative Building, Pipe Galleries, and the Lagoon Pumping Station.
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 335999All Other Miscellaneous Electrical Equipment and Component Manufacturing
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Environmental Commission Spec...
Bid Title: Environmental Commission Special Meeting February 20, 2026 Category: Environmental Commission Notices
Township of Millburn
Bid Due: 12/31/2026
Follow Alert Generator Active Contract Opportunity Notice ID W50S8F26QA017 Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Bid Due: 7/14/2026