Lisa Ln. (141st - Bonnie Brae) Waterline Replacement Project, CIP 4124
Project Information
- Bid Title
- Lisa Ln. (141st - Bonnie Brae) Waterline Replacement Project, CIP 4124
- Issuing Agency
- City of Beaverton
- Location
- Oregon
- Published Date
- May 14, 2025
- Closing Date
- Jun 5, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: Lisa Ln. (141st - Bonnie Brae) Waterline Replacement Project, CIP 4124
Addenda: 0
Release Date: 5/14/2025
Due Date: 6/5/2025
OverviewPost InformationPosted At:Wed, May 14, 2025 1:57 PMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:NoSummaryThis project will replace approximately 1,700 feet of 6-inch cast iron water main, originally installed in 1965, with seismically resilient 6-inch ductile iron pipe. The existing cast iron main has experienced several breaks in recent years, exacerbated by corrosive native soils, leading to a significantly shortened service life of both the pipe and fittings.
Recognized as a top replacement priority by Water Operations staff, this project will also include:
-
Replacement of all water service lines between the main and meter
-
Installation of Advanced Metering Infrastructure (AMI) meters
-
Replacement of all fire hydrants within the project limits
BackgroundThe existing 6-inch cast iron water main, installed in 1965, has deteriorated significantly due to corrosive native soils and has experienced frequent breaks in recent years. These failures have led to costly emergency repairs, water service disruptions, and increased maintenance efforts, impacting both operational efficiency and customer reliability.
Recognizing these challenges, Water Operations staff have designated this main as a top priority for replacement. Upgrading to a seismically resilient 6-inch ductile iron pipe will enhance system durability, reduce the risk of future failures, and improve long-term performance in seismic events or shifting ground conditions.
Beyond replacing the mainline infrastructure, this project will also modernize the system by:
-
Upgrading all water service lines between the main and meter
-
Installing Advanced Metering Infrastructure (AMI) meters for improved data accuracy and efficiency
-
Replacing all fire hydrants within the project limits to strengthen emergency response capabilities
By addressing these issues comprehensively, this project will reduce maintenance costs, improve service reliability, and enhance resilience against seismic activity, ensuring a more sustainable and efficient water system for the community.
TimelineITB Released on:May 14, 2025Pre-Bid Conference (Non-Mandatory):May 21, 2025, 10:00amLast Day to Submit Questions:May 29, 2025, 5:00pmQuestion Response Deadline:June 2, 2025, 5:00pmBid Due By:June 5, 2025, 2:00pm -
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
John Day Dam Fish Pump Rehabi...
Follow John Day Dam Fish Pump Rehabilitation Project Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 8/24/2026
Invitation to Bid: Mill Stree...
Bid Number: SE6414 Bid Title: Invitation to Bid: Mill Street Sewer Replacement Category:
City of Grants Pass
Bid Due: 9/03/2026