Railroad and Sherman Traffic Signal
Project Information
- Bid Title
- Railroad and Sherman Traffic Signal
- Issuing Agency
- Fort Morgan
- Location
- Colorado
- Published Date
- Feb 19, 2026
- Closing Date
- Mar 16, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Railroad and Sherman Traffic Signal
Category: Construction Services Status: Open Description: The City of Fort Morgan is accepting sealed Bids for East Railroad Avenue & Sherman Street Traffic Signal until 3:00 p.m. (our clock) on March 18, 2026 at City Hall located at 110 Main Street, Fort Morgan, Colorado 80701. If mailed, the address is PO Box 100, Fort Morgan, CO 80701. If hand delivered, the address is 110 Main Street, Fort Morgan, CO 80701. If emailed, the address is For security reasons, you must enable JavaScript to view this E-mail address..
Project Summary and Bid Document Information: The Contractor shall be responsible for removing the existing traffic signals at the intersection of Railroad Avenue and Sherman Street and for the installation of new traffic signals. Restoration of the project site, including pavement, sidewalk, and landscaping.
A copy of the Bid and associated documentation may be obtained as follows:
- The City website a t www.cityoffortmorgan.com
- City Hall located at 110 Main Street, Fort Morgan
Pre-Bid Meeting: A mandatory pre-bid meeting will be held on March 4, 2026 at 1:30 p.m. at the Planning & Zoning/Building Department located at 110 Sherman Street, Fort Morgan. All prospective Bidders must attend this pre-bid meeting in order for the City to accept their Bid.
Questions: All questions regarding this bid should go to Tom Acre, Director of Public Works. Questions must be in writing and can be e-mailed to For security reasons, you must enable JavaScript to view this E-mail address.. The cut-off date and time for questions is March 10, 2026 at 9:00 a.m. It is the responsibility of the prospective bidders to contact Tom Acre at (970) 370-6560 to verify receipt of questions. Based upon such inquiry, the City may choose to issue an Addendum before and/or after the mandatory pre-bid meeting.
Opening Date: The opening will not be a public bid opening as it will be subject to staff review of costs, schedule, options, qualifications, possible short list and/or interviews.
Publication Date/Time: 2/19/2026 9:30 AM Closing Date/Time: 3/16/2026 3:00 PM Bid Opening Information: Pre-Bid Mtg (mandatory) Pre-bid Meeting: 03/04/2026 Contact Person: Tom Acre, Director of Public Works
tom.acre@cityoffortmorgan.com
(970)370-6560Plan & Spec Available: Please review the Contract Documents and Specifications in the Related Documents section below. Special Requirements: Bids must be properly signed, and any bid addendums acknowledged, by an authorized representative of the company with the legal capacity to bind the company to the contractual agreement. In addition, the authorized representative's signature of the Proposal assures the company's understanding of the City's Procurement Policy. Only Bids properly received will be accepted. Miscellaneous: The City's Procurement Policy is available for review in the Municipal Code, Chapter 4, Article 6, Procurement and Contract Program. The link to this policy can be found on the city's website and in the description above. Related Documents: - Attachment Preview
-
INVITATION TO BIDforEAST RAILROAD AVENUE &SHERMAN STREET TRAFFIC SIGNALin theCITY OF FORT MORGAN, COLORADOFebruary 19, 2026Tom AcreDirector of Public WorksCity of Fort MorganP.O. BOX 100FORT MORGAN, COLORADO 80701(970) 370-6560City of Fort MorganINVITATION TO BIDCity of Fort MorganEast Railroad Avenue & Sherman Street Traffic SignalThe City of Fort Morgan is accepting sealed Bids for East Railroad Avenue & Sherman Street TrafficSignal until 3:00 p.m. (our clock) on March 18, 2026 at City Hall located at 110 Main Street, FortMorgan, Colorado 80701. If mailed, the address is PO Box 100, Fort Morgan, CO 80701. If handdelivered, the address is 110 Main Street, Fort Morgan, CO 80701. If emailed, the address iscfm.bids@cityoffortmorgan.com.Project Summary and Bid Document Information: The Contractor shall be responsible for removingthe existing traffic signals at the intersection of Railroad Avenue and Sherman Street and for theinstallation of new traffic signals. Restoration of the project site, including pavement, sidewalk, andlandscaping.A copy of the Bid and associated documentation may be obtained as follows:1. The City website at www.cityoffortmorgan.com2. City Hall located at 110 Main Street, Fort MorganPre-Bid Meeting: A mandatory pre-bid meeting will be held on March 4, 2026 at 1:30 p.m. at the Planning& Zoning/Building Department located at 110 Sherman Street, Fort Morgan. All prospective Bidders mustattend this pre-bid meeting in order for the City to accept their Bid.Questions: All questions regarding this bid should go to Tom Acre, Director of Public Works. Questionsmust be in writing and can be e-mailed to tom.acre@cityoffortmorgan.com. The cut-off date and time forquestions is March 10, 2026 at 9:00 a.m. It is the responsibility of the prospective bidders to contact TomAcre at (970) 370-6560 to verify receipt of questions. Based upon such inquiry, the City may choose to issuean Addendum before and/or after the mandatory pre-bid meeting.Opening Date: The opening will not be a public bid opening as it will be subject to staff review of costs,schedule, options, qualifications, possible short list and/or interviews.City of Fort MorganInvitation to BidEast Railroad Avenue & Sherman Street Traffic SignalITB-1City of Fort MorganINFORMATION TO BIDDERSCity of Fort MorganEAST RAILROAD AVENUE & SHERMAN STREET TRAFFIC SIGNALI. SCOPE OF WORKThe work primarily consists of:1. The removal of existing four span-wire traffic signals and the installation of four new mast armtraffic signals at the intersection of East Railroad Avenue and Sherman Street in Fort Morgan.The project includes the following elements:A. Removal of Inlet - This item includes removal of the existing inlet. Removal of inlet shallbe completed to the length and elevation designated on the plans. Before any inletremoval or connection work is started, the contractor shall verify the conditions conformto CDOT standard detail M-604-13 for the proposed inlet.B. Removal of Concrete Median Cover Material - Concrete median cover materialdesignated for removal shall be saw-cut to a clean edge, as indicated in the plans, and thematerials shall be disposed of offsite at the Contractor’s expense. No additional paymentwill be made for saw cutting of cover material, it shall be included in the work.C. Removal of sidewalk (Concrete) - Sidewalk designated for removal shall be saw-cut toa clean edge, as indicated in the plans. The sidewalk and base course shall be disposedof offsite at the Contractor’s expense. Concrete shall be removed to a depth sufficient toensure that the proposed sidewalk will be 6 inches thick the proposed curb ramps will be8 inches thick, and the design is compliant with all applicable standards and specifications.No additional payment will be made for saw cutting of sidewalk, it shall be included in thework.D. Removal of Curb and Gutter - Existing gutter designated for removal shall be removedcompletely and disposed of offsite at the Contractor’s expense.E. Removal of Asphalt Mat - Existing asphalt designated for removal on the plans shall beremoved completely and disposed of offsite at the Contractor’s expense. The contractorshall adhere to the sawcut limits specified in the plans for the asphalt removal limits.Asphalt shall be removed to a sufficient depth to ensure that the proposed concretepavement will be 10 inches thick. The contractor shall scarify, recompact, and use excessasphalt millings to prepare the subgrade of the concrete pavement. This work shall beincidental to the Concrete Pavement bid item.F. Removal of Traffic Signal Equipment - Removal of traffic signal equipment shallinclude all existing signal poles, signal heads, span wires, pedestrian push buttons,luminaires, and street signs. Contractor is responsible for returning salvaged equipmentas outlined on the plans.City of Fort MorganInvitation to BidEast Railroad Avenue & Sherman Street Traffic SignalITB-2City of Fort MorganINFORMATION TO BIDDERSCity of Fort MorganEAST RAILROAD AVENUE & SHERMAN STREET TRAFFIC SIGNALG. The sawing of concrete and asphalt pavements and driveways shall be done carefully,and all concrete or asphalt pavement to remain in place which is damaged, due toContractor’s operations, shall be removed and replaced at the Contractor’s expense.Contractor shall furnish, place and maintain all traffic control devices at their expense.H. Sign Panel (Special) - Proposed mast arm mounted street name sign panels shallhave the City of Fort Morgan’s logo and be standard green sign with white lettering.Signs shall be 10” tall, with 9” tall capital lettering and 4” tall lower-case lettering forstreet names and address. Contractor shall confirm the City logo and sign paneldesign conform with the City of Fort Morgan’s standards prior to fabrication requests.I. Backplates - Signal head backplates shall be selected and coordinated between theContractor and the City of Fort Morgan. Backplates shall meet CDOT specificationsand installation.J. Traffic Signal Controller (Type 170) - Traffic signal controller cabinet shall be 336Sand include type 170 controller and shall be a McCain ATC Flex or approvedequivalent. The proposed traffic signal will be raised at a minimum of 12” above thefinished sidewalk surface. Contractor shall comply with dimensions and specificationsoutlined in the plans for the raised foundation.II. GENERAL INSTRUCTIONS1. Authorized Representative. All Bids must be properly signed by an authorizedrepresentative of the company with the legal capacity to bind the company to the contractualagreement.2. Withdrawal. Bid(s) may be withdrawn up to the date and time set for closing upon written,faxed or e-mailed notice to the City. Negligence upon part of the Bidder in preparing theirBid(s) shall not constitute a right to withdraw a Bid(s) subsequent to the Bid opening. Aconditional or unqualified Bid may be cause for rejection.3. Acceptance of Bid. Only bids properly received will be accepted. Any Bid received after thetime and date specified shall not be considered.4. Conflict of Interest and Good Faith: Respondents must declare among their teamany business entity or individual who is associated with, or is in any way likely, to createa conflict of interest, a perception of conflict of interest or whether there are anycircumstances whereby any member of Council or any officer or employee of the Citywould gain any pecuniary interest, direct or indirect.City of Fort MorganInvitation to BidEast Railroad Avenue & Sherman Street Traffic SignalITB-3City of Fort MorganINFORMATION TO BIDDERSCity of Fort MorganEAST RAILROAD AVENUE & SHERMAN STREET TRAFFIC SIGNALFailure to comply with this provision may result in disqualification of your Bid from the RFBprocess or, if the City becomes aware of breach of this provision after the detailed Bid hasbeen requested, disqualification from the further processes.5. Investigation of Qualifications. The City may make such investigations as it deemsnecessary to determine the ability of the Bidder to perform the work, and the Bidder shallfurnish to the City all such information and data for this purpose as the City may request.The City reserves the right to reject any Bid if the evidence submitted by, or investigation of,such Bidder fails to satisfy the City that such Bidder is properly qualified to carry out theobligations of the Contract and to complete the work contemplated herein.6. Time for Contract Award. Should there be any reason why the Contract cannot be awardedwithin the specified period; the time may be extended by mutual agreement between theCity and the Bidders. Notwithstanding the foregoing, nothing herein shall be construed toobligate the City to award a Contract to any Bidder should the City determine that it is in itsbest interest to do otherwise.7. Permits: The Contractor is required to obtain all necessary City of Fort Morgan permits. Allfees will be waived.8. Bid Bond. Each bidder must deposit with his/her bids a security in the amount, form andsubject to the conditions provided in the Information for Bidders.9. Performance and Payment Bond. The awarded Contractor must provide a Performanceand Payment Bond, in the amount of one hundred percent (100%) of the next acceptableBid Price, with a corporate surety approved by the Owner, will be required for the faithfulperformance of the Contract; provided the Bid Price exceeds $10,000.00.10. Maintenance Bond. The awarded Contractor must provide a two-year, 20% MaintenanceBond or Letter of Credit to cover defective workmanship as required for this project.11. Confidentiality and Privacy: Information provided to a Respondent by the City or acquired bya Respondent by way of further enquiries or through investigation is confidential. Suchinformation shall not be used or disclosed in any way without the prior written authorization ofthe City. The Respondent shall not make any statement of fact or opinion regarding any aspectof the RFB and any subsequent proposal to the media or any member of the public without theprior written authorization of the City.To the extent permitted, the City shall treat all submissions as confidential. However, theRespondent is advised that any information contained in any submission may be released ifrequired by City policy or procedures, by other authorities having jurisdiction, or by law, suchas the Colorado Open Records Act.City of Fort MorganInvitation to BidEast Railroad Avenue & Sherman Street Traffic SignalITB-4
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Description: restoration services Department: DMVA - Department of Military and Veterans Affairs Buyer:
State Government of Colorado
Bid Due: 7/18/2026
CTF FMCC Fire Alarm Improveme...
Description: CTF FMCC Fire Alarm Improvements RFQ TBD CMS208671 Department: DOC - Penitentiary
State Government of Colorado
Bid Due: 8/19/2026