MGT1 Water Mist Fire Protection system replacement
Project Information
- Bid Title
- MGT1 Water Mist Fire Protection system replacement
- Issuing Agency
- City of Lakeland
- Location
- Florida
- Published Date
- Jun 25, 2026
- Closing Date
- Jul 24, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: MGT1 Water Mist Fire Protection system replacement
Addenda: 0
Release Date: 6/25/2026
Due Date: 7/24/2026
MGT1 Water Mist Fire Protection system replacementFollowRequest For ProposalLE - Production - MPPProject ID: 2026-RFP-067Release Date: Thursday, June 25, 2026· Due Date: Friday, July 24, 2026 4:00pmPosted Thursday, June 25, 2026 4:00pmAll dates & times in Eastern TimeDraft Response Events RSVP No Bid28 days, 18 hours, 31 minutesOverview
Post Information
Posted At:Thu, Jun 25, 2026 4:00 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryLakeland Electric intends to replace the existing MGT1 fire suppression system with a self-contained high-pressure water mist fire protection system. The system shall not use electric motor-driven pumps. System operation shall be by stored-pressure nitrogen/water cylinders and electrically supervised solenoid-operated valves.
Actual work completed that would make MGT1 unavailable from 9/13 to 9/19 if possible. We have a planned outage for MGT1 during that period.
Pricing Proposal Line Items (BE SURE TO SUBMIT ATTACHMENT L.)
BackgroundLakeland Electric’s existing MGT1 fire suppression system has reached the end of its reliable service life and requires replacement. The current system contains obsolete components, aging piping, outdated detection and releasing equipment, and legacy hardware that presents increasing maintenance and reliability concerns. Existing fire alarm/releasing control equipment is obsolete and replacement parts are becoming increasingly difficult to obtain.
Lakeland Electric previously evaluated replacement of the system with a new CO₂ suppression system. After further review, the decision was made to pursue a self-contained high-pressure water mist system due to the reduced personnel hazards associated with water mist systems, improved maintainability, reduced recharge complexity, and operational flexibility for a power generation environment.
The project includes replacement of the existing piping, nozzles, temperature detection devices, pull stations, audible/visual notification devices, releasing control panel, and associated suppression hardware. The proposed system shall utilize stored-pressure nitrogen/water cylinders with electrically supervised solenoid-operated valves and shall not utilize electric motor-driven pumps.
Due to the outdoor and industrial environment associated with the MGT1 installation, vendors shall also provide a complete freeze protection solution for all system components exposed to low ambient temperatures. Freeze protection methods may include conditioned enclosures, heat trace systems, cabinet heaters, insulation, or other engineered solutions proposed by the contractor.
The intent of this project is to improve fire protection system reliability, maintainability, personnel safety, code compliance, and long-term supportability while minimizing operational impacts to plant personnel and generating equipment.
Timeline
RFP release:June 25, 2026Pre-Proposal Meeting (Non-Mandatory):July 9, 2026, 10:00amMcIntosh Power Plant 3400 E Lake Parker Drive, Lakeland, FL, 33805. Entry is through gate 8. Meeting will be held on the 3rd floor of the white control room building (Unit 5 Conference room) on the right after entry through gate 8.RFP questions deadline:July 16, 2026, 5:00pmRFP proposal due date:July 24, 2026, 4:00pm - Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Prequalification - Annual Con...
Description: Prequalification - Annual Contract Electrical Services Department: Purchasing Buyer: Jeromy Calderon Solicitation
Palm Beach County
Bid Due: 8/14/2030
CABLING SYSTEMS, INSTALLATION...
Description: CABLING SYSTEMS, INSTALLATION AND REPAIR OF Department: Purchasing Buyer: Bobby Brooks Solicitation
Palm Beach County
Bid Due: 7/18/2029