Addendum No. 2 ITB 23-FAC-0073 Chiller Replacement@ Mary Keller Zervignon School
Project Information
- Bid Title
- Addendum No. 2 ITB 23-FAC-0073 Chiller Replacement@ Mary Keller Zervignon School
- Issuing Agency
- New Orleans Public Schools
- Location
- Louisiana
- Published Date
- Dec 10, 2025
- Closing Date
- Dec 16, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 23-FAC-0073
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Addendum No. 2 ITB 23-FAC-0073 Chiller Replacement@ Mary Keller Zervignon School (12.10.25) - Attachment Preview
-
PIVOTAL , LLC1515 POYDRAS STREET, SUITE 1150NEW ORLEANS, LA. 70112(504) 799-3653ADDEDNDUM # 2CHILLER REPLACEMENT @ MARY KELLER ZERVIGNONOwner: Orleans Parish School Board (OPSB)Program Manager: Manning Architects (Clarence Eugene III – Sr. Project Manager)Project #: ITB23-FAC-0073Date: 12/10/2025Project Location: 3128 Constance Street, New Orleans, LA. 70115POR: Pivotal Engineering LLC, Bassam Rossi Mekari, PE / 225-205-3490I- Answers To Questions/Emails (Questions are in numerical orders,Answers are below each question):NONE THIS ADDENDUMII- Substitutions Requests:As per the front-end bid documents in section 4.3, the following guidelines shall be met:“4.3 Substitutions:4.3.1 The materials, products and equipment described in the Bidding Documents establish a standardof quality, character, type, style, function, dimension, and appearance desired. Equivalent products maybe acceptable, as stated in La. R.S. 38:2212.T(2). It shall be the responsibility of the Architect/Engineer todetermine if a proposed substitution is equivalent. No substitutions shall be allowed after bidding, exceptas may be provided in the Contract Documents.4.3.2 No substitution will be considered unless written request for approval has been submitted by theProposer and has been received by the Architect/Engineer at least seven (7) working days prior to the deadlinefor submission of Bids. (La. R.S. 38:2295.C) Each such request shall include the name of the material orequipment for which it is to be substituted and a complete description of the proposed substitute includingmodel numbers, drawings, cuts, performance and test data and any other information necessary for anevaluation. A statement setting forth any changes in other materials, equipment or work that incorporationof the substitute would require shall be included. It shall be the responsibility of the Proposer to includein his proposal all changes required of the Contract Documents if the proposed substitution is used. Priorapproval is given contingent upon supplier being responsible for any costs which may be necessary tomodify the space or facilities needed to accommodate the materials and equipment approved.4.3.3 If the Architect approves any proposed substitution, such approval will be set forth in anAddendum. Bidders shall not rely upon approvals made in any other manner.”Page 2 of 2Acceptable Substitutions:Equipment1- Chill Water Pump2- Suction Diffuser3- Triple Duty Valve4- Air SeparatorManufacturerTaco Comfort SolutionsTaco Comfort SolutionsTaco Comfort SolutionsTaco Comfort SolutionsTaco Comfort Solutions is acceptable compatible manufacturer. However, as per ourbid specs, proposed equipment must meet at a minimum the following:1- It is contractor s responsibility to ensure that all bid documents are adhered to.2- Specification Section 23 64 23.13 Para 3.02 discusses that proposed manufacturers shallhave a local rep within 10 miles of the job site with qualified HVAC technicians andengineers that can service the provided equipment.3- Equipment must be made in the USA.4- Engineer approval does not allow specification compromises. The contractor remainsresponsible for meeting all equipment specifications.End of Addendum #2Bassam Rossi Mekari, PE - PrincipalBassam Rossi MekariPivotal Engineering
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Bid Number Description Date Issued Bid Open Date/Time 50017-D2600050 Window Replacements Non-Mandatory Pre-Bid
State Government of Louisiana
Bid Due: 7/08/2026
Re-Bid #0004 Chiller Replacement
Bid Number Description Date Issued Bid Open Date/Time 50014-0004 Re-Bid #0004 Chiller Replacement
State Government of Louisiana
Bid Due: 7/22/2026