Tulsa Gateway Signage
Project Information
- Bid Title
- Tulsa Gateway Signage
- Issuing Agency
- City of Tulsa
- Location
- Oklahoma
- Published Date
- Jan 9, 2026
- Closing Date
- Jan 21, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- IFB 26-908
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid ID: IFB 26-908 Addendum: 1 Bid Due Date: 1/21/2026 Description: Tulsa Gateway Signage Bid Document: IFB 26-908 + Addendum 1 Tulsa Gateway Signage.pdf Attachments: - Attachment Preview
-
City of TulsaFinance Department1/9/26Invitation for Bid 26-908 Tulsa Gateway SignageAddendum #1Please note the following changes which have been made for clarification to this Invitation for Bid. Thisaddendum must be listed as Addendum #1 on the ACKNOWLEDGMENT OF RECEIPT OFADDENDA/AMENDMENTS of the bid package as verification that you have received and are aware of theinformation contained herein.QUESTIONS/CLARIFICATION/CHANGES:This Addendum No. 1 consisting of 50 items, is hereby made a part of the contractDocuments to the same extent as though it were originally included therein and shallsupersede anything contained in the Plans and Specifications with which it might conflict.This Addendum shall be attached to the Index Sheet of the Contract Documents andsubmitted with bid. Failure to do so shall result in the bid being deemed non-responsive.This Addendum No.1 consists of the followingITEMSSpecification Section 04 72 00 “Cast Stone Masonry”1. Added reference to ASTM C1364 – Architectural Cast Stone in the Precast Panel specifications.2. Removed ”subsection A. Delegated Design.” From Section 2.2 of the Precast Panel specifications.Sheet G-1013. Gateway Triangle designations (i.e., “GT1” and “GT2”) have changed to reflect designationscalled out in geotech report.Sheet G-1024. Sign Operation Verbiage added to Note # 15. Access panel and precast panel shop drawing verbiage moved from note #2 to note #7.6. Operations & instructions manual verbiage added to note #4.7. Clarification added for storage costs on note #6.8. Notes #3 and #7 have been added to the pay item list.9. Access panel (lockable) note moved from note #9 to note #7.Sheet AP-50010. Added “LOCKABLE” verbiage and inch tick marks to access panel callout.11.“BLOCK-OUT FOR ACCESS PANEL OPENING” callout added.12.Callout added for stainless steel corner pins.13.“PRECAST PANELS TO BE INSTALLED BY SITE CONTRACTOR” verbiage removed from note #1.14.Note #3 added.Sheet E-50115.Coordination note added to disconnect to be mounted behind access panel (note #7 “FABRICATION &INSTALLATION PACKAGE NOTES”)16. General note added for electrical contractor working on subsequent package to remain on-site to testand ensure successful operation of lighting components.17.“BY OTHERS” verbiage added to concrete pad callout (GATEWAY SIGN FLOODLIGHT DIAGRAM)IFB 26-908 | Tulsa Gateway Signage | Issue Date: 12/08/202518. “OR APPROVED EQUAL” verbiage added to linear floodlight callout (GATEWAY SIGN FLOODLIGHTDAIGRAM.19.Coordination note added for disconnect to be mounted behind access panel (GATEWAY SIGNELECTRICAL POWER DIAGRAM)Sheet PG-50020. Preferred acrylic brand designated in callouts (or approved equal)21. Revised note # 1 regarding notice to fire department.22. Revised note #2 as it relates to additional payment not being made for site restoration work.23.Added notes #3 and #4.Sheet PG-50124.Saddle locations and dimensions added to section views.25.“Mitered” verbiage removed from “welded Corners” callout (section B) “Ref STRUCTURAL DWGS” textadded.26.“See Sheet PG-504” callout updated to “See sheet PG-503” (section B).Sheet PG-50227.“B” section cut added to Elevation ‘A’.28. Revised note #1 regarding notice to fire department.29. Revised note #2 as it relates to additional payment not being made for site work.30. Added notes #3 and #4.Sheet PG-50331.Dimension string added between lettering on Elevation ‘B’.32.Removed note #1 regarding notice to fire department.33.Revises note #2 as it relates to additional payment not being made for site work.34.Added notes #3 and #4.Sheet PG-50435.Clarified callout referencing fastening access for rain cap. Removed overhang tolerance (Section ‘A’).36.Revised dimension string and added 24” dia. Base pipe to Plain View ‘B’.37.Revised note #1 regarding notice to fire department.38.Revised note #2 as it relates to payment not being made for site work.39.Added notes #3 and #4.Sheet PG-50540.Revised note #1 regarding notice to fire department.41.Revised note #2 as it relates to payment not being made for site work.42.Added notes #3 and #4.Sheet S-500A43.“A” designation given to sheet numbers for Fabrication and Install Package.44.Steel fabrication general notes separated from Foundation general notes (separate design package)Sheet S-501A45.Steel construction special inspections tables split from Concrete and Soils special inspection tables.46.‘A’ designation given to sheet numbers for fabrication and Install package.Sheet S-50247.Structural steel and yield strength notes moved from note # 4 to General Notes sheet.48.“BY OTHERS” verbiage removed from “SIGN CABINET” label (Sign Detail 1)49.Leader removed from 24” stub pipe (“RE: SITEWORK PACKAGE” label, Sign Detail 1)50.Weld Callouts Updated (Detail 4)All other provisions of the Plans and Specifications shall remain in full force and effect.Additional ChangeIn addition to the changes listed above, the Submission Due Date has beenextended from January 14, 2026 to Wednesday, January 21, 2026 at 5:00pm.IFB Rev 02/20242IFB 26-908 | Tulsa Gateway Signage | Issue Date: 12/08/2025Invitation for Bid (IFB)26-908Supplies or Services Requested: Tulsa Gateway SignageDepartment: Public WorksNIGP Commodity Code(s): 305-71, 306-71, 557-62, 557-63, 559-70, 801-60,801-66, 801-85, 906-57, 936-74, 962-79Solicitation ScheduleEVENTIFB Issue DateDATE12/08/2025Pre-Bid ConferenceVirtual – email buyer for invitationDeadline for QuestionsSubmitted to assigned buyer via email.Bid Submission DateEither mailed or delivered to City Clerk address. Bidsare open the day after the due date.Thursday, Dec. 18, 20259:30AM – 10:30AM CT1/05/202610 Days prior to IFB due date01/21/2026If You have any questions or need additional information, contact the Assigned Buyer:Donny Tiemann | dtiemann@cityoftulsa.orgAll questions should be emailed with IFB 26-908 on the subject line.Submit Bids (sealed) to:City of Tulsa – City Clerk’s Office175 E. 2ND St., Suite 260Tulsa, OK 74103Bids (2 total:1 original, 1 copy) must be sealed and either mailed or delivered.Write the Bid Number, Supplies or Service requested (as listed above) and BidOpening Date on the lower left corner of the outside of Your Bid envelope. Feelfree to use included packing slip. No faxed or emailed Bids will be considered.Barring certain circumstances (Section III-5), Bids received after the stated dateand time will not be accepted and will be returned to the Bidder unopened.IFB Rev 02/20243IFB 26-908 | Tulsa Gateway Signage | Issue Date: 12/08/2025I. STATEMENT OF PURPOSE:1. Overview and GoalsThe goal of this solicitation is to secure a source to purchase and install Tulsa Gateway Signage.2. Term of ContractThe City intends to award a one-year annual contract. The City may offer the Seller the opportunityfor additional one-year terms. The City also reserves the right to make multiple or partial awards. Todo business with the City, You must agree to the terms and conditions of the City’s standardPurchase Agreement, indicated by Your Authorized Agent’s signature on the Purchase Agreement.Capitalized terms used in this IFB and not defined in the Purchase Agreement shall have themeanings as ascribed to them in Title 6, Chapter 4 of the Tulsa Revised Ordinances.The entire Invitation for Bid (IFB), including any additional information submitted by Bidder andAccepted by City will be included as part of the Agreement between Seller and City. All sheets ofthis IFB (including Sections I-VI) must be submitted.Authorized AgentSeveral parts of the Bid (Affidavits, Purchase Agreement) must be signed by an “AuthorizedAgent.” An Authorized Agent means an agent who is legally authorized to bind the Seller under thelaw of the state in which the Seller is legally organized. For instance, under Oklahoma law, theAuthorized Agent for each of the following types of entities is as stated below:o Corporations – the president, board chair or board vice chair (or the vice president if the corporationwas formed in Oklahoma) can sign; others can sign if they have and provide the City with (i) a corporateresolution giving them authority to bind the Seller, and (ii) a recent certificate of secretary indicatingthe authority is still valid and was in full force and effect on the date of the signature. (See IFB SectionVI for sample of a Certificate of Secretary)o General Partnerships – any partner can sign to bind all partners.o Limited Partnerships – the general partner must sign.o Individuals – no additional authorization is required, but signatures must be witnessed and notarized.o Sole Proprietorship – the owner can sign. Any other person can sign if s/he provides a recent Powerof Attorney, signed by the owner, authorizing him/her to bind the sole proprietorship.o Limited Liability Company (LLC) – any manager of the LLC elected by the members of the LLC, orany member signing as manager of the LLC. All other signers will need a Consent of Members signedby all the Members of the LLC authorizing their signature on or up to 30 days before the date of theirsignature. (See Section VI for sample of a Consent of Members)Entities organized in states other than Oklahoma must follow the law of the state in which they areorganized.IFB Rev 02/20244IFB 26-908 | Tulsa Gateway Signage | Issue Date: 12/08/2025II. SCOPE OF SERVICES AND SPECIFICATIONS1. Scope of ServicesThe City is requesting Bids for Tulsa Gateway Signage, comprised of two installations within thecorporate limits of the City of Tulsa, to include fabrication of signs and sign receiving sleeves,storage, delivery, installation, power connection, and coordination with footing installer.Seller QualificationsExperience in large-scale commercial sign fabrication and installation, including electrical andlighting. Must be able to secure the services of a professional engineer, licensed in the State ofOklahoma, to perform structural engineering services and to sign and seal associated documents.Delivery RequirementsAll prices quoted shall be based on delivery F.O.B. Tulsa, Oklahoma or to any other points as maybe designated in the Specifications, with all charges prepaid by Seller to the actual point of delivery.Bids must state the number of Days required for delivery under normal conditions.Absolutely no items over 500lbs. may be directly shipped to the City requiring the City personnel tounload from the shipping truck or trailer. The City carries no responsibility for any damages incurredduring an unloading occurrence. All unloading shall be the responsibility of the Seller and/or shippingentity.Additional Supply-Specific Delivery RequirementsWest Sign Location: This sign will be placed at 3770 S. Southwest Boulevard, Tulsa.East Sign Location: The sign will be placed near the highway on the eastern side of City ownedproperty south of 1003 N. 129 E Ave and north of I-244. Tulsa County Assessor Parcel ID 90433-04-33-65915.Site Restoration to pre-project or better conditions following delivery and installation is required.SPECIAL PROVISION: INTERNAL MILESTONEA. Seller shall complete fabrication and delivery to footing contractor of 24” stub-out pipewithin fourteen (14) calendar days of the notice-to-proceed date. If the Seller fails to meetthis internal milestone, then the Seller agrees to pay the City, not as a penalty, but asliquidated damages for such breach of Contract, the sum of two thousand five hundreddollars ($2,500.00) for each and every calendar day of failure to complete this work afterthe specified time. The said amount is fixed and agreed upon because of the impracticabilityand extreme difficulty of fixing and ascertaining the actual damage the City would in suchevent sustain. It is expressly understood and agreed that the said time for completion of thework described herein is a reasonable time for the completion of same.2. SpecificationsThe Bid must meet or exceed the following Specifications.***See attached EXHIBIT ‘B’ for project locations and specifications.IFB Rev 02/20245
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Core and Distribution Routers...
Core and Distribution Routers - OSU-Stillwater Provide Core and Distribution Routers - OSU-Stillwater
Oklahoma State University
Bid Due: 7/14/2026
Event Name SW1010 Adobe Software Business Unit Mgmt and Enterprise Services Event ID
State Government of Oklahoma
Bid Due: 7/14/2026