East Oak Street Child Pedestrian Safety Improvements Project
Project Information
- Bid Title
- East Oak Street Child Pedestrian Safety Improvements Project
- Issuing Agency
- City of Pocatello
- Location
- Idaho
- Published Date
- Apr 29, 2025
- Closing Date
- May 13, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: East Oak Street Child Pedestrian Safety Improvements Project
Category: Public Works—Engineering Status: Open Description: ADVERTISEMENT FOR BIDS
City of Pocatello
Pocatello, ID
E Oak Street Child Pedestrian Safety Improvement ProjectGeneral Notice
City of Pocatello (Owner) is requesting Bids for the construction of the following Project:
E Oak Street Child Pedestrian Safety Improvement Project
Bids for the construction of the Project will be received at the Pocatello City Hall located at 911 N. 7th Avenue, Pocatello, ID 83201 until May 13, 2025 at 2:00 pm local time. At that time the Bids received will be publicly opened and read in the Council Chambers at City Hall.
The Project includes the following Work:
The City of Pocatello has secured funding for a project which includes constructing sidewalk, curb and gutter, bulb outs, and rectangular rapid flashing beacons (RRFB) in front of Greenacres Elementary School on the corner of E Oak Street and Hyde Ave. The project scope includes the removal and disposal of portions of the existing asphalt roadway and Greenacres Elementary parking lot, removal and disposal of portions of the existing sidewalk, forming/pouring of new sidewalk, bulb out, curb ramp, driveways, curb, gutter, and asphalt patch back per plan. Each curb ramp must be inspected by city staff before asphalt patch back is complete. Existing inlets will be removed and new inlets installed at the new curb line and connected to the existing storm sewer pipes. The scope includes installing RRFB assemblies, signs, and pavement markings for the pedestrian crossings. Contractor is also responsible for traffic control through the duration of the project and must adhere to the Manual on Uniform Traffic Control Devices (MUTCD). Pedestrian access must be maintained through the project site at all times. Bids are requested for the following Contract: E Oak Street Child Pedestrian Safety Improvement Project. The Project has an expected duration of 37 days.
Publication Date/Time: 4/29/2025 8:00 AM Closing Date/Time: 5/13/2025 2:00 PM Contact Person: Engineering Department
City of Pocatello
911 N 7th Ave
Pocatello, ID 83201Business Hours: 8 AM - 5PM Related Documents: View Document(s) - Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237310Highway, Street, and Bridge Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
2026 Upper Development, Dam N...
Bid Number: IFP 26-21-2 Bid Title: 2026 Upper Development, Dam No. 1 Rehabilitation
City of Idaho Falls
Bid Due: 7/16/2026
Number Name Status Bid Close Public Bid Opening Resources & Details Bid Results
State Government of Idaho
Bid Due: 7/06/2026