IFB: Cherryville Elementary LED Lighting Installation
Project Information
- Bid Title
- IFB: Cherryville Elementary LED Lighting Installation
- Issuing Agency
- Gaston County Public Schools
- Location
- North Carolina
- Published Date
- Feb 4, 2026
- Closing Date
- Feb 26, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- Attachment Preview
-
Gaston County SchoolsGastonia, North CarolinaINVITATION FOR BIDCherryville LED Lighting InstallationFor all questions about this IFB contact:Jeffrey CraneFacility ServicesGaston County Schools941 Osceola StreetGastonia, North Carolina 28054(office)704-810-8828(cell) 704-214-4131jdcrane@gaston.k12.nc.usPre-bid10:00 am Thursday, February 12 2026Bids Due by2:00 pm Friday, February 26 20261OBJECTIVEThe objective of this Invitation for Bid (IFB) is to award a contract for the Cherryville LEDLighting Installation to the vendor offering the highest quality service at the best value.The laws of the State of North Carolina shall prevail concerning all purchases and servicesunder this IFB and subsequent contract(s).Mandatory pre-bid visit… No bid will be accepted from a vendor that does not attend the pre-bid meeting on 10:00 am Thursday, February 12 2026. There will be a sign in sheet. Allbidders will meet at:Cherryville Elementary700 E Academy StreetCherryville, NC 28021Point of Contact- Jeffrey Crane(cell) 704-214-4131(office)704-810-8828SCOPE OF WORK• Replace existing fixtures with LED per audit• Light fixtures must be RAB products. No alternates will be accepted• Install safety wire to light fixture from hard ceiling/bar joist & secure to grid• Rewiring and fixture installation shall meet all local, State and Federal Codes.• Must adhere to all OSHA Safety Requirements.1. Light Fixturesa. If light switches are disabled, they are to be removed. Conductors are to be cappedand labeled, with Panel and Circuit from where it originates, Conductors are to bedisconnected in the first junction box from the switch, label both the junction box andthe conductors on both ends as to where it originates. There Shall be NO UNUSEDENERGIZED CONDUCTORS in the switch box.b. Install the appropriate device cover.c. Label all switches with Panel and circuit from where it originates.2. Panel Circuitsa. If circuits are abandoned, the conductors are to be removed from the breakers, cappedand labeled on both ends of the conductors. Disconnect conductors in the firstjunction box from the panel. Labels shall give point of origination for each conductor.b. Test all light switches and associated circuits.2c. Provide documentation that all light switches and circuits have been tested.Documentation shall include, Device, Location (room#, office, Hallway...etc.), andperson responsible for testing.3. Labelsa. All labels shall be typed.b. Device labels shall be clear with black text.c. Conductors labels shall be white with black text.d. Junction box covers white with black text.4. MC Cablea. Ensure adequate cable whips to fixtures.b. Red Heads shall be installed on both ends of MC cablec. Cables shall be supported above the ceiling grid, with appropriate straps, such asCaddy KX Cable/Conduit Clips; no wire ties.5. Connectsa. Twist wires together before installing wire nuts.b. No stab lock connectors.6. Labor Warranty Honored: 1 year beginning the date of project completion. No tripfees and/or additional invoices for lifts, bucket trucks, or ladders will be accepted byGaston County Schools. Labor warranty begins the day the project is signed offcompleted by Matt Odom or authorized GCS employee.7. If you choose to do your own audit, this must be done prior to bid closing. You willneed to arrange this with the school. An escort will be required to provide access toclosets and closed off areas.8. Contractor has 10 business days to address any issues and schedule repair for anyrequests received regarding repair, damaged fixtures, and/or reported outagesfound needing to be repaired/replaced for warranty. There must be clearcommunication between the project manager and school staff to coordinate repairsin a timely manner.9. The warranty for material shall be 3 years or 50,000-100,000 hours per noted on thematerial spec sheet.Upon entering a facility, the contractor or their employees will notify the facility personnel oftheir presence and purpose. All such personnel will sign into the visitor managementsystem, have identification and wear distinctive uniform clothing.Gaston Co. Schools - CHERRYVILLE ELEMENTARYRoomnumber/AreaADMINOFFICESENTRANCEMAIN OFFICEExistingQty.ExistingequipmentProposed Proposed equipmentQty.302x4 FLUORESCENT30FIXTURE42X4 FLUORESCENT4FIXTUREST34FA-2X4T34FA-2X4Notes3BATH12L 4' STRIPFIXTURE1GUS17-4HALLWAY52X4 FluorescentFixture5T34FA-2X421x4 FluorescentFixture HARDCEILING2T34FA-1x4RETROFIT PANEL1RMKPANEL KITS 1x4BLACK28' 2L STRIPFIXTURE8STRP4HTEACHER WORK84L 8' METAL STRIPAREAFIXTURE8STRP4HRESTROOM2A19 SURFACE MT.FIXTURE2CRVAS-11-R-16-9CCT-UNV-WCOPY ROOM22L 4' SURFACE MTWRAP2SMPFA1X4RT45UNVTW END TO END MOUNTINGHALLWAY32L 4' SURFACE MTWRAP3SMPFA1X4RT45UNVTWMECHANICALKITCHEN42L 4' STRIP4FIXTURE152X4 FLUORESCENT15FIXTUREGUS17-4T34FA-2X4202L 4' SURFACE MTWRAP20SMPFA1X4RT45UNVTWINNER KITCHENOUTSIDEKITCHEN DOOR252L VAPOR TIGHTFIXTURES END TOEND2A19 SURFACE MT.FIXTURE25SMPFA1X4RT45UNVTW END TO END MOUNTING2CRVAS-11-R-16-9CCT-UNV-WBLUE DOOR2A19 JELLY JARFIXTURES2A19-14-9CCT-DIM2VBR100PMAIN GYM14HIBAY FIXTURES14H17SB BLACK122L 8' STRIPFIXTURES24GUS17-4END TO END MOUNTINGMRS. HAYCLOSET142L 4' STRIPFIXTURES END TOEND1A19 SURFACE MT.FIXTURE14STRP4H1CRVAS-11-R-16-9CCT-UNV-WMS. HUBERT142L 4' STRIPFIXTURES END TOEND14STRP4HEND TO END MOUNTINGCLOSET1A19 SURFACE MT.FIXTURE1CRVAS-11-R-16-9CCT-UNV-W4HALLWAYLONGHUGHESWILLISHALLWAYHENDRICKTHOMASKISERLACKEYHARRILLREADING LABSTORAGEWORKROOM72l 4' SURFACE MT.FIXTURE7T34FA-2X2INSTALL 2X2FIXTURE INEXISTING GRID -REMOVE WRAPFIXTURES142L 4' SURFACE MT.14STRP4HFIXTUREEND TO END MOUNTING1A19 SURFACE MT.FIXTURE1CRVAS-11-R-16-9CCT-UNV-W142l 4' SURFACE MT.FIXTURE14STRP4HEND TO END MOUNTING1A19 SURFACE MT.FIXTURE1CRVAS-11-R-16-9CCT-UNV-W142l 4' SURFACE MT.FIXTURE14STRP4HEND TO END MOUNTING1A19 SURFACE MT.FIXTURE1CRVAS-11-R-16-9CCT-UNV-W152L 4' SURFACE MT.15SMPFA1X4RT45UNVTW END TO END MOUNTINGFIXTURE142L 4' SURFACE MT.14STRP4HFIXTUREEND TO END MOUNTING1A19 SURFACE MT.FIXTURE1CRVAS-11-R-16-9CCT-UNV-W142L 4' SURFACE MT.14STRP4HFIXTUREEND TO END MOUNTING1A19 SURFACE MT.FIXTURE1CRVAS-11-R-16-9CCT-UNV-W142L 4' SURFACE MT.14STRP4HFIXTUREEND TO END MOUNTING1A19 SURFACE MT.FIXTURE1CRVAS-11-R-16-9CCT-UNV-W142L 4' Surface Mt.Wrap END TO END14STRP4H1A19 SURFACE MT.FIXTURE1CRVAS-11-R-16-9CCT-UNV-W42X4 FLUORESCENT4FIXTURET34FA-2X4152X4 FLUORSCENTFIXTURE15T34FA-2X442X4 FLUORESCENT4FIXTURET34FA-2X422X4 FLUORESCENT2FIXTURET34FA-2X4SERVER ROOM2A19 SURFACE MT.FIXTURE2CRVAS-11-R-16-9CCT-UNV-W5
- Commodity Codes
-
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
- NAICS 335122Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
10-IFB-224345971-YB - Dorton ...
Solicitation Number: Doc2243456971 Project Title: 10-IFB-224345971-YB - Dorton Waterfall Stage Light and Sound
State Government of North Carolina
Bid Due: 7/08/2026