Lakeland Electric - Unit 5 - 2026 Fall Outage Contract Services
Project Information
- Bid Title
- Lakeland Electric - Unit 5 - 2026 Fall Outage Contract Services
- Issuing Agency
- City of Lakeland
- Location
- Florida
- Published Date
- Sep 15, 2026
- Closing Date
- Oct 2, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: Lakeland Electric - Unit 5 - 2026 Fall Outage Contract Services
Addenda: 2
Release Date: 9/10/2026
Due Date: 10/2/2026
Lakeland Electric - Unit 5 - 2026 Fall Outage Contract ServicesFollowLast updated by Addendum #2 on Sep 16, 2026 3:19 AM See what changedRequest For ProposalLE - Production - MPP238 , 238220 , 811310Project ID: 2026-RFP-114Release Date: Thursday, September 10, 2026· Due Date: Friday, October 2, 2026 2:30pmPosted Thursday, September 10, 2026 5:46pmAll dates & times in Eastern Time - New YorkDraft Response No Bid16 days, 17 hours, 4 minutesOverview
Post Information
Posted At:Thu, Sep 10, 2026 5:46 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryLakeland Electric (OWNER) seeks well-qualified and experienced Boiler and HRSG contractors to perform various scopes of work as detailed below. The work will take place during the Unit No. 5 Fall Outage, beginning on November 29, 2026, and ending on December 19, 2026.
This solicitation is a Request for Proposal (RFP) in which the Bidder will provide detailed accounts of their experience as an industrial boiler contractor capable of performing code welds on thin-wall HRSG tubes and heavy wall P91 piping, as well as providing other measurable & verifiable criteria to be detailed in the sections below.
BackgroundThe HRSG at McIntosh Unit 5 uses waste heat from a Siemens 501G combustion turbine to produce superheated, dry steam and supply that steam to a Siemens steam turbine. The HRSG is a Nooter-Erikson steam generator, commissioned in the year 2000. It is designed to produce 553,360 lbs/hr main-steam flow at 1,832 psig and 1041°F at the HP superheat outlet. The HRSG is a three-pressure system with a low-pressure (LP) drum, and intermediate pressure (IP) drum and a high pressure (HP) drum. Siemens performed a "Flex Fire" upgrade on the 501G CT in 2020, increasing mass flow and exhaust temperature through the HRSG.
Recent borescope inspections have revealed indications in one of the Reheat desuperheater spray liner. The replacement spool is on-hand.
A portion of the Outage work will be performed on a Time and Materials basis and will be determined by inspection findings during the outage.
Timeline
RFP release:September 10, 2026RFP questions deadline:September 25, 2026, 5:00pmRFP proposal due date:October 2, 2026, 2:30pm - Commodity Codes
-
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Main Agency Melbourne Orlando International Airport Status Active Fiscal Year 2026 Primary Contact
Melbourne Orlando International Airport
Bid Due: 11/05/2026
Airport Center 1, 5th Floor C...
Description: Airport Center 1, 5th Floor Carpet Replacement Department: Facilities Dev & Ops
Palm Beach County
Bid Due: 11/22/2029