Ault Farms No. 11, 43 & 79 Perimeter Fencing
Project Information
- Bid Title
- Ault Farms No. 11, 43 & 79 Perimeter Fencing
- Issuing Agency
- City of Thornton
- Location
- Colorado
- Published Date
- Mar 12, 2026
- Closing Date
- Apr 21, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 26-170A
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Solicitation Number Status Due Description Attachments 26-170A Active 4/21/2026 1:00 PM Ault Farms No. 11, 43 & 79 Perimeter Fencing - Attachment Preview
-
THE CITY OF THORNTON9500 CIVIC CENTER DRIVETHORNTON, CO 80229-4326Project ManualForConstruction ofAULT FARMS NO. 11, 43 & 79 PERIMETER FENCINGPROJECT NO. 26-170AMARCH 2026THIS PAGE INTENTIONALLY LEFT BLANKPage 2 of 171S:\SS\C-P\2026\26-170 Ault Farm Reveg\Fencing\Procurement\Final\\26-170A IFB 3-11-26Rev. 08/2023TABLE OF CONTENTSSECTION TITLETable of ContentsInvitation for Bid ProposalsInformation for BiddersProcedure for Contract SigningBid ProposalContractor's Post-QualificationsReference Authorization and Release FormPost-Qualification QuestionnaireBidder’s Post-Qualification AffidavitContractPage 3 of 171S:\SS\C-P\2026\26-170 Ault Farm Reveg\Fencing\Procurement\Final\\26-170A IFB 3-11-26Rev. 08/2023THIS PAGE INTENTIONALLY LEFT BLANKPage 4 of 171S:\SS\C-P\2026\26-170 Ault Farm Reveg\Fencing\Procurement\Final\\26-170A IFB 3-11-26Rev. 08/2023INVITATION FOR BID PROPOSALSCity of Thornton9500 Civic Center DriveThornton, CO 80229-4326Sealed Bid Proposals for Construction of the Ault Farms No. 11, 43 & 79 PerimeterFencing, Project No. 26-170A, will be received in the Agriculture Stewardship Office,16754 County Road 84, Ault, CO 80610, until 1:00 p.m., April 21, 2026. At that time, thebid will be publicly opened and read aloud.Note: Late Proposals will not be accepted under any circumstances. Vendors electing tosubmit their bid via mail or courier service accept all responsibility for delivery to theContract Administration Office by the bid closing time indicated. Thornton is not responsiblefor lost or late delivery of bid proposals.Project Description: The Project consists of constructing approximately 41,900 linear feetof wildlife-friendly 4-strand wire fence around three pastures, with gates, and as furtherdescribed in the Contract Documents.Thornton utilizes the BidNet Direct System (BidNet) in the advertisement and facilitation ofsolicitations. Therefore, respondents must ONLY rely on documents provided on theBidNet Direct System (BidNet) website: www.BidNetDirect.com. Thornton utilizes theBidNet Direct System at www.BidNetDirect.com to distribute official copies of the Drawingsand Project Manual (“Bid Documents”) for use in preparing Bid Proposals. Bidders will berequired to register with the website to download the Bid Documents and Addenda. Thereis no charge by BidNet Direct for this service. If you experience problems with the BidNetDirect website, please call 1-800-835-4603 for assistance. Bidders are required toacknowledge all Addenda with their Bid Proposal and are encouraged to either register withthe website or to view the Addenda posted on the Contract Administration Solicitationwebsite: https://solicitations.thorntonco.gov/solicitations prior to submission of a BidProposal. Bidders that do not acknowledge all Addenda may be considered non-responsive. The Bid Documents, including Addenda, are also available for viewing at theContract Administration office located on the 2nd floor of City Hall at 9500 Civic Center Drive,Thornton, Colorado. Bidders that do not have download and/or printing capability in-house,may contact a commercial blueprint company or other reprographics company forassistance with downloading and printing the Bid Documents.A mandatory Pre-Bid Conference will be held at Agriculture Stewardship Office, 16754County Road 84, Ault, CO 80610, at 10:30 a.m., Wednesday, April 1, 2026. AllProspective Bidders are required to attend. A mandatory Project site walk-through will beconducted following the Pre-Bid Conference.Each Bid Proposal shall be submitted on form(s) furnished by Thornton and must beaccompanied by a certified check, cashier's check, or bid bond in an amount of not lessthan five percent (5%) of the amount of the Bid Proposal and made payable to the City ofThornton.Page 5 of 171S:\SS\C-P\2026\26-170 Ault Farm Reveg\Fencing\Procurement\Final\\26-170A IFB 3-11-26Rev. 08/2023
- Commodity Codes
-
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
FED: County Line Road Shoulde...
Type Number Description Due By Opening Status IFB 426023 FED: County Line Road
City of Longmont
Bid Due: 8/03/2026
Park-n-Ride Asphalt Improveme...
Project ID: IFB 326DP001 Title: Park-n-Ride Asphalt Improvements 2026 (SBE Goal 15%) Addenda:
Regional Transportation District - Denver
Bid Due: 7/23/2026