Accelerated Lead Service Line Replacement Program – Contract 3.1 Addendum 1
Project Information
- Bid Title
- Accelerated Lead Service Line Replacement Program – Contract 3.1 Addendum 1
- Issuing Agency
- City of Providence
- Location
- Rhode Island
- Published Date
- Nov 24, 2025
- Closing Date
- Dec 1, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Accelerated Lead Service Line Replacement Program – Contract 3.1 Addendum 1
- Attachment Preview
-
Procurement #: 50983>CITY OF PROVIDENCE, RHODE ISLANDDepartment: Providence WaterRFP Title: Accelerated Lead Service Line Replacement Program-Contract 3.1Opening Date: 12/01/2025Addendum #: 1Issue Date: 11/23/2025The purpose of this addendum is:Modifications, amends and supplemental information.Providence City Hall25 Dorrance StreetProvidence, RI 02903ADDENDUM NO. 1TO:FROM:ALL CONTRACT DOCUMENT HOLDERS OF RECORDALL PROSPECTIVE BIDDERSPROVIDENCE WATER125 DUPONT DRIVEPROVIDENCE, RHODE ISLAND 02907PHONE: (401) 521-6300DATE ISSUED:FRIDAY, NOVEMBER 21, 2025ACCELERATED LEAD SERVICE LINE REPLACEMENT PROGRAM –RE:CONTRACT 3.1CONTRACT NO. 20234BID OPENINGDATE:MONDAY, DECEMBER 1, 2025 AT 2:15 PMBID OPENINGLOCATION:BOARD OF CONTRACT AND SUPPLY MEETINGCITY COUNCIL CHAMBERSPROVIDENCE CITY HALL25 DORRANCE STREETPROVIDENCE, RHODE ISLAND 02903LAST WRITTEN FRIDAY, NOVEMBER 21, 2025QUESTIONS DUE:This Addendum No. 1, including all referenced attachments, modifies, amends, andsupplements designated parts of the Contract Documents to the above-referenced project andshall be part of the Contract Documents as provided in the “Instructions to Bidders” for theabove-referenced project.Acknowledge receipt of this Addendum by inserting its number and date on page 00 41 00 – 1of the Bid Form. Failure to do so may subject the Bidder to disqualification.The Contract Documents are hereby modified, amended, and supplemented as follows:Contract No. 20234ACCELERATED LEAD SERVICE LINE REPLACEMENT PROGRAM – CONTRACT 3.1CONTRACT NO. 20234ADDENDUM NO. 1November 21, 2025Page 2 of 7ATTACHMENTSThe following attachments are included with this Addendum:1. Pre-Bid Conference Meeting Report2. Section 00 41 00 Bid Form3. Section 01310 Construction Scheduling4. Appendix C – Relevant Rules and Regulations for Traffic Permits and Traffic Control5. Appendix F – List of Approved Materials/Manufacturers for Use in the Providence WaterDistribution SystemPRE-BID CONFERENCE1. The meeting report from the pre-bid conference held on Thursday November 13, 2025, at2:00 PM is attached to and included with this Addendum.SPECIFICATIONS1. TABLE OF CONTENTS: Under “Appendices”, REPLACE “C NOT USED” with “C RelevantRules and Regulations for Traffic Permits and Traffic Control”.2. SPECIFICATION 00 10 00 – RFP: REPLACE third bullet under Questions with thefollowing:“Please direct questions relative to the specifications outlined (beginning on page 14) to theissuing department’s subject matter expert:A. Name: Eileen Sundberg, PEB. Title: Project EngineerC. Email Address: sundbergem@cdmsmith.com”3. SPECIFICATION 00 41 00 – Bid Form: DELETE the section in its entirety and replace withAttachment 2 – Section 00 41 00 Bid Form.4. SPECIFICATION 00 73 00 – Supplementary Conditions: ADD the following at the end ofParagraph SC-15.01B.6 on page 25: “Contractor shall submit a submittal status update andprogress schedule update with each Application for Payment.”5. SPECIFICATION 01014 – Construction Sequence and Schedule Requirements: ADDnew Paragraph 1.01.G as follows and renumber the succeeding paragraphs accordingly:Contract No. 20234ACCELERATED LEAD SERVICE LINE REPLACEMENT PROGRAM – CONTRACT 3.1CONTRACT NO. 20234ADDENDUM NO. 1November 21, 2025Page 3 of 7“G. Contractor shall complete all customer scheduling efforts as required per Section 01170no later than three (3) months before the end of the Contract.”6. SPECIFICATION 01025 – Measurement and Payment:A. DELETE “square yard(s)” from Paragraph 3.01.B.11 and REPLACE with “tonnage”.B. DELETE “cubic” from Paragraph 3.08.B.1 and REPLACE with “square”.C. DELETE “square yard(s)” from Paragraph 3.11.B.1 and REPLACE with “tonnage”.7. SPECIFICATION 01026 – Application for Payment:A. ADD the following as a new Paragraph 1.05.A.5: “5. Completed leadCAST reports”.B. ADD the following as a new Paragraph 1.05.B.9: “9. Submittal status and progressschedule update”.8. SPECIFICATION 01170 – Special Provisions:A. ADD the following paragraph after Paragraph 1.06.A.3.a:“b. Contractor shall comply with all relevant state and local laws as well as DigSaferequirements, including but not limited to RIGL §39-1.2.”B. ADD the following new Paragraph 1.09.C and renumber the succeeding paragraphs:“D. Notify all affected residents and businesses of any emergency water mainshutdowns. It is the Contractor’s responsibility to provide and distribute writtennotifications describing the responsibility of the residents and/or businesses, how longthe residents and/or businesses will be without service, and the estimated time ofcompletion of the water distribution system construction activities impacting service. Thenotice should identify the location of the water distribution system construction activitiesas well as the times of any disruptions to the water system. The water distributionsystem shall not be taken out of service unless it is an emergency situation approved bythe Owner. Notification templates will be provided by the Owner and printed byContractor for distribution. Contractors shall have notifications printed and available atthe construction site at all times.”C. ADD the following sentence after the third sentence in Paragraph 1.18.F.6: “TheContractor is required to print and distribute abutters notices to all affected propertiesahead of construction in accordance with the requirements in Appendix C as well asany relevant Federal, State, and local laws. Abutters notices to be approved by theContract No. 20234ACCELERATED LEAD SERVICE LINE REPLACEMENT PROGRAM – CONTRACT 3.1CONTRACT NO. 20234ADDENDUM NO. 1November 21, 2025Page 4 of 7Owner and Engineer prior to construction. If the property is a school or abuts aschool property, replacements and construction must be coordinated with schoolsand scheduled on school breaks. Weekend work may be allowed if approved inadvance by the Owner and Engineer. If the property is a community building (e.g.church, youth center) or abuts a community building, replacements and constructionmust be coordinated with the community building ahead of construction.”D. ADD the following new paragraph 1.18F.12 as follows:“12. The Contractor shall respond to customer issues or concerns within 48 hours ofthe documented issue or concern. The Contractor shall coordinate a visit with theEngineer, visit the property, investigate, and provide detail of the situation to theEngineer with possible solutions.”9. SPECIFICATION 01300 – Submittals: DELETE “01720 iPad for RPRs*” from the tablelisted in Paragraph 2.01.A under the “Construction Materials” section.10. SPECIFICATION 01310 – Construction Scheduling: DELETE the section in its entiretyand replace with Attachment 3 – Section 01310 Construction Scheduling.11. SPECICATION 01500 – Temporary Facilities: ADD a new Paragraph 1.01.D.1 as follows:“1. Contractor and their subcontractors shall wear boot covers when inside of a property.Contractor shall also provide boot covers to the Engineer and Owner when onsite.”12. SPECIFICATION 01576 – Traffic Control: ADD the following new paragraph 1.01.K asfollows:“K. Refer to Appendix C for additional traffic permit and traffic control details. Contractor andtheir subcontractors shall comply with all current applicable Federal, State, and local lawsand regulations, as well as the specific requirements stated in this Section and elsewhere inthe Specifications.”13. SPECIFICATION 01700 – Contract Closeout: DELETE Paragraph 1.04.D in its entiretyand REPLACE with the following: “D. Provide evidence that all customer complaints havebeen visited, reviewed, and addressed per Section 01170 Paragraph 1.18.F.12.”14. SPECIFICATION 01720 – Project Record Documents: DELETE Paragraph 2.01.B in itsentirety.15. SPECIFICATION 02221 – Trenching, Backfilling, and Compaction:A. DELETE Paragraph 1.04.B.5 in its entirety and replace as follows:Contract No. 20234
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
- NAICS 541330Engineering Services
- NAICS 562910Remediation Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
WPS Professional Development ...
Info Opening Time Solicitation Number Status Bid Title Posting Group Posting Entity Contact
State Government of Rhode Island
Bid Due: 7/21/2026
O2X Human Performance Worksho...
Follow O2X Human Performance Workshops - IFLEX and AFLEX Active Contract Opportunity Notice
DEPT OF DEFENSE